Dear , I am a Tenant of Mhada Building, located at Parel, Gulistan Building, Adam Misty Lane, Recently the repair work has been conducted in our building, unfortunately instead of improving the conditions of the builiding it has become worse, after completion of repair all the muds from the gutter has not been clean, the dirty water is overflowing from the gutter, toilet pipes up to 5th floor has not properly fixed dirty water is falling from the top. After compalining to the supervisor incharge no action has been taken.
The contractor name is siddique and the supervisor is taus.
Please guide what should we do and how we can get the problem solve from the contract.
M. R. Ansari Was this information helpful? |
Mhada — repairing of floor
Dear Sir,I am a resident of p.v. chawl, D block, opp. Abhudaya Bank, Dharavi main road, Dharavi-17, would like to inform you that our building which consits of 1 floor is in real danger. The floor of the 1st floor which is celing of the ground floor is very weak. If it is not addressed quickly the building might collapse.
Mahda people have done plastering of our building and the work of stair case but the core issue of flooring has been left out, without the flooring all other work done by them would go waste.
So please do the needful quickly.