Address: | Hyderabad, Andhra Pradesh |
FROM I M RAO UTOPIA C303
DEFECTS
1 The wall of the bed room adjucent to the common bath room got damp with seepage of water and blisters are formed on the wall. This is due to leakage of pipes joint of the bath room and bed room.Hence the joint of pipes and damaged wall are to be repaired .
2 This bed room door is defective as the bleeder on the top was not pasted .
3 A similar flaw also is existing to the adjucent bed room with attached bath room, and the wall is in damp with seepage of water due to leakage of pipes joint inside the wall.Here also the joint and wall are to be repaired .
4 T he toilet flush is not working in the wooden floor master bed room and black stain is formed in the toilet which cannot be cleaned with buckets of water . Immedaite action has to be to repair flush and stain.
5 In the master bed room the wooden flooring was not properly pasted at the entry door point
and also at the exit point towards the balcony and in due course, humps and cracks will be formed in those areas . To be repaired
6 T he floor of the marble floor is not polished .
7 . After our inauguration some body entered and removed glass shutters of the window in bath room. . I feel From this atmosphere, I suspect some body is staying in the flat, and how he is getting the key of the door is not known.
I reported this matter to sriram fm office 15 days ago but I don’t know the present progress and action
Hence I sincerely request you to take immediate action for repairs of the construction defects prior to the further detoriation, a and also delay to my ccupation.
With best wishes I MALLIKRJUNRAO
UTOPIA C 303
Reply, Reply All or Forward | More
Click to Reply All
Send
Brighten your day.
FROM I M RAO UTOPIA C303
DEFECTS
1 The wall of the bed room adjucent to the common bath room got damp with seepage of water and blisters are formed on the wall. This is due to leakage of pipes joint of the bath room and bed room.Hence the joint of pipes and damaged wall are to be repaired .
2 This bed room door is defective as the bleeder on the top was not pasted .
3 A similar flaw also is existing to the adjucent bed room with attached bath room, and the wall is in damp with seepage of water due to leakage of pipes joint inside the wall.Here also the joint and wall are to be repaired .
4 T he toilet flush is not working in the wooden floor master bed room and black stain is formed in the toilet which cannot be cleaned with buckets of water . Immedaite action has to be to repair flush and stain.
5 In the master bed room the wooden flooring was not properly pasted at the entry door point
and also at the exit point towards the balcony and in due course, humps and cracks will be formed in those areas . To be repaired
6 T he floor of the marble floor is not polished .
7 . After our inauguration some body entered and removed glass shutters of the window in bath room . I feel from the atmosphere, some body is staying in the flat and how his getting the key of the door is not known.
I reported this matter to sriram fm office 15 days ago but I don’t know the present progressc and action
Hence I sincerely request you to take immediate action for repairs of the construction defects prior to the further detoriation, a and also delay to m y ccupation.
With best wishes I MALLIKRJUNRAO
UTOPIA C 303
Dear Sriram
We were glad to meet you on Aug 15th. I had mentioned to you some of the construction defects which have arisen in my apartment after 3months of my possession.
On Aug 15th after the inauguration of my Apartment, I wanted to occupy my house but I found the following construction defects which are to be repaired. As per your instruction I am sending this mail for your attention and prompt action please.
DEFECTS
1 The wall of the bed room adjacent to the common bath room has become damp with water leakage and blisters have formed on the wall. This is due to water leakage of pipes in the bath room and bed room. Hence the joint of pipes and damaged wall are to be repaired.
2 This bed room door is defective as it cannot be closed due to a wooden beading on the top which is not fixed and aligned.
3 Similar flaw also is existing to the adjacent bed room with attached bath room, and the wall is dampened with water due to leakage of pipes joint inside the wall. Here also the joint and wall are to be repaired .
4 The toilet flush is not working in the wooden floor master bed room and the toilet is badly stained which cannot be cleaned even with buckets of water. Immediate action has to be taken not to spread bacterial problems.
5 In the master bed room the wooden flooring was not properly pasted at the entry door point and also at the exit point towards the balcony. After few months, humps and cracks will be formed in those areas. The wooden flooring in these areas need to be properly set and cured.
6 The floor of the marble floor is not polished and needs another polishing run.
Hence I sincerely request you to take immediate action for repairs of the construction defects prior to any further deterioration. Immediate repairs now will be more cost effective and prevent any further delay for occupation of the apartment.
With best wishes,
I MALLIKRJUNRAO
UTOPIA C 303
Tel:[protected]
[protected][protected][protected][protected][protected][protected][protected][pr...⇄
On Mon, Aug 18, 2014 at 4:25 PM, Mallikarjuna Rao <[protected]@yahoo.com> wrote:
Dear sriram
1. We are glad to meet you on aug 15 th. I adressed you orally all the construction defects arised in my apartment after 3months of my possesion.
2 .On aug 15th after my inauguration I want to occupy my house but I found the following construction defects which are to be repaired. As per your instruction I am sending this mail for your retention and prompt action please.
DEFECTS
1 The wall of the bed room adjucent to the common bath room was damped with water and blisters are formed on the wall. This is due to leakage of pipes joint of the bath room and bed room.Hence the joint of pipes and damaged wall are to be repaired .
2 This bed room door is defective as the bleeder on the top was not pasted .
3 A similar flaw also is existing to the adjucent bed room with attached bath room, and the wall is damped with water due to leakage of pipes joint inside the wall.Here also the joint and wall are to be repaired .
4 T he toilet flush is not working in the wooden floor master bed room and was damped with defication of workers which cannot be cleaned even with buckets of water . Immedaite action has to be taken not to spread bacterial problems.
5 In the master bed room the wooden flooring was not properly pasted at the entry door point
and also at the exit point towards the balcony . After few months, humps and cracks will be formed in those areas .
6 T he floor of the marble floor is not polished .
Hence I sincerely request you to take immediate action for repairs of the construction defects prior to the further detoriation, which will be more cost effective and also delay to m y ccupation.
With best wishes I MALLIKRJUNRAO
UTOPIA C 303
Reply, Reply All or Forward | More
Click to Reply All
Send
Brighten your day.
FROM I M RAO UTOPIA C303
DEFECTS
1 The wall of the bed room adjucent to the common bath room got damp with seepage of water and blisters are formed on the wall. This is due to leakage of pipes joint of the bath room and bed room.Hence the joint of pipes and damaged wall are to be repaired .
2 This bed room door is defective as the bleeder on the top was not pasted .
3 A similar flaw also is existing to the adjucent bed room with attached bath room, and the wall is in damp with seepage of water due to leakage of pipes joint inside the wall.Here also the joint and wall are to be repaired .
4 T he toilet flush is not working in the wooden floor master bed room and black stain is formed in the toilet which cannot be cleaned with buckets of water . Immedaite action has to be to repair flush and stain.
5 In the master bed room the wooden flooring was not properly pasted at the entry door point
and also at the exit point towards the balcony and in due course, humps and cracks will be formed in those areas . To be repaired
6 T he floor of the marble floor is not polished .
7 . After our inauguration some body entered and removed glass shutters of the window in bath room . I feel from the atmosphere, some body is staying in the flat and how his getting the key of the door is not known.
I reported this matter to sriram fm office 15 days ago but I don’t know the present progressc and action
Hence I sincerely request you to take immediate action for repairs of the construction defects prior to the further detoriation, a and also delay to m y ccupation.
With best wishes I MALLIKRJUNRAO
UTOPIA C 303
Dear Sriram
We were glad to meet you on Aug 15th. I had mentioned to you some of the construction defects which have arisen in my apartment after 3months of my possession.
On Aug 15th after the inauguration of my Apartment, I wanted to occupy my house but I found the following construction defects which are to be repaired. As per your instruction I am sending this mail for your attention and prompt action please.
DEFECTS
1 The wall of the bed room adjacent to the common bath room has become damp with water leakage and blisters have formed on the wall. This is due to water leakage of pipes in the bath room and bed room. Hence the joint of pipes and damaged wall are to be repaired.
2 This bed room door is defective as it cannot be closed due to a wooden beading on the top which is not fixed and aligned.
3 Similar flaw also is existing to the adjacent bed room with attached bath room, and the wall is dampened with water due to leakage of pipes joint inside the wall. Here also the joint and wall are to be repaired .
4 The toilet flush is not working in the wooden floor master bed room and the toilet is badly stained which cannot be cleaned even with buckets of water. Immediate action has to be taken not to spread bacterial problems.
5 In the master bed room the wooden flooring was not properly pasted at the entry door point and also at the exit point towards the balcony. After few months, humps and cracks will be formed in those areas. The wooden flooring in these areas need to be properly set and cured.
6 The floor of the marble floor is not polished and needs another polishing run.
Hence I sincerely request you to take immediate action for repairs of the construction defects prior to any further deterioration. Immediate repairs now will be more cost effective and prevent any further delay for occupation of the apartment.
With best wishes,
I MALLIKRJUNRAO
UTOPIA C 303
Tel:[protected]
[protected][protected][protected][protected][protected][protected][protected][pr...⇄
On Mon, Aug 18, 2014 at 4:25 PM, Mallikarjuna Rao <[protected]@yahoo.com> wrote:
Dear sriram
1. We are glad to meet you on aug 15 th. I adressed you orally all the construction defects arised in my apartment after 3months of my possesion.
2 .On aug 15th after my inauguration I want to occupy my house but I found the following construction defects which are to be repaired. As per your instruction I am sending this mail for your retention and prompt action please.
DEFECTS
1 The wall of the bed room adjucent to the common bath room was damped with water and blisters are formed on the wall. This is due to leakage of pipes joint of the bath room and bed room.Hence the joint of pipes and damaged wall are to be repaired .
2 This bed room door is defective as the bleeder on the top was not pasted .
3 A similar flaw also is existing to the adjucent bed room with attached bath room, and the wall is damped with water due to leakage of pipes joint inside the wall.Here also the joint and wall are to be repaired .
4 T he toilet flush is not working in the wooden floor master bed room and was damped with defication of workers which cannot be cleaned even with buckets of water . Immedaite action has to be taken not to spread bacterial problems.
5 In the master bed room the wooden flooring was not properly pasted at the entry door point
and also at the exit point towards the balcony . After few months, humps and cracks will be formed in those areas .
6 T he floor of the marble floor is not polished .
Hence I sincerely request you to take immediate action for repairs of the construction defects prior to the further detoriation, which will be more cost effective and also delay to m y ccupation.
With best wishes I MALLIKRJUNRAO
UTOPIA C 303