Respecred sir, as you knoee an overbridge is being constructed by nhai( sadhbhav engg.ltd.) at site t.c.p.3 hisar cantt.sir, at this site due to sharp diversion no. of accidents are happening but nhai had taken no steps to check the speed of vehicles except nerely keeping the barricades to navigate the vehicles.ollz do needful
Was this information helpful? |
Post your Comment