[Resolved]  RWA 21 B — Restoration of Green Belt in Sector 21 B

Reference our letter dated 01.07.08 addressed to the Administrator HUDA and letters dtd 28.07.08 and 27.09.08 addressed to the Municipal Commissioner Faridabad, copies of above letters were sent to you for your taking the appropriate action.

1.The HUDA Faridabad while Planning Part II of Sector 21 B, had planned 200 ft wide road, from NIT 5 Police Station to Patel chowk, SGM Nagar and 75 ft wide road Green Belt on either side of the 200 feet road.

2.The residents of the sector had been approaching the local authorities on above problem but no tangible results has been achieved so far.

3.The illegal occupants of Green Belt appealed against the action initiated by HUDA/ MCF for dislodging them from the Green Belt to Lower Court/ Senior Court/ High Court, but lost the appeal on April '06.

4.Finally they filed an appeal no. 1809 in 2007 in the Supreme Court. The Supreme Court along with other appeals dismissed their appeal as it was considered infructuous and did not even entered into the merits of the case, wide their order no 9502 dtd. 26.04.08 (copy enclosed).

We the residents of Sector 21B, therefore earnestly request you to kindly initiate suitable action to restore the Green Belt as directed by the High Court and kindly provide them alternate accommodation as envisaged by HUDA to get the encroached area vacated.
ADVERTISEMENT
Complaint marked as Resolved Aug 14, 2020
Complaint comments  2 CommentsShareTweet

Comments

RWA 21 B — Completion of Park Development

The Park in front of plot no 417 to 419 in sector 21B has been developed by M.C.F, but a few jobs are still to completed.

A Proper lighting arrangement is yet to be done.

B At present only four benches have been provided, which are inadequate for this park, kindly provide another eight benches for the park.

C To complete the left over masonry work of boundary wall, painting of main gate, wicket gate and painting of wall.

RWA 21 B — Reconstruction of road dug for laying new sewer pipe line in sector 21B.

New sewer pipe line has been laid from plot no. 492 to 428, 655 to 650, & 650 to 706 in sector 21B. Road enroute was dug to lay the arove sewer pipe line and has been filled with loose soil dust.

We get moderate to heavy rains during the month of December -January. Due to seapage of rain water into loose soil the road will setal down and devlope deep pits, and can cause fetal road accidents

Therefore the road may kindly be rematled to avoid road accidents and inconvinience to sector residents.