[Resolved] Torrent Power — INCREASE OF LOAD not required | |||
Dear Sir, I am having a Torrent Power electric connection, my service number is 4021749. Along with Electricity Bill - December 2012 i received a letter indicating that within 30 days you have to give application to increase your present Contract Demand ( 1.00 KW/KVA/HP) of LMC 1C to more otherwise it would be done by Torrent Power and you will receive increased bill next time. After using Consumption Calculator (available on their website) it is .92 KW/KVA/HP. Why i am forced to increase present Contract Demand ? Was this information helpful? | |||