Address: | Gautam Buddh Nagar, Uttar Pradesh, 201304 |
After construction of service road along jan path marg running between sector 108 and 110, the rubble has not been disposed off and has been left between service road and the storm water drain. This accumulated rubble running all along the service road will restrict smooth flow of rainwater into storm water drain thereby causing water logging
During construction of the service road the rubble has been thrown all along into the storm water drain too thus restricting smooth water flow therein
Storm water drain should be cleaned of all the rubble and rubble along the service road too should be disposed off before onset of the monsoon Was this information helpful? |
Post your Comment