Address: | Ghaziabad, Uttar Pradesh |
WHILE TAKING THE POCESSION OF MY SAID FLAT I HAD SHOWN THE THEN MANAGER MAINTENANCE MR. NAGENDRA ABOUT THE HOLE AVAILBLE FROM OUSIDE ON THE WALL ON ONE OF MY BEDROOMS.
HE ASSURED ME THAT THE SAME WILL BE FILLED FROM OUTSIDE AT THE TIME OF PAINTING OF BUILDING. BUT TILL TODAY THE SAME HAS NOT BEEN DONE EVEN AFTER 9 MONTHS OF REGISTRATION OF MY FLAT.
I HAD BEEN CONSTANTLY FOLLOWING UP THE MATTER WITH PROJECT MANAGER MR. SUNIL TYAGI TOO BUT EVEN AFTER HIS ASSURANCE NOTHING HAS BEEN DONE.
THERE IS AN ELECTRICAL CONNECTION JUST OPPOSITE TO HOLE FROM INSIDE AND I FEAR OF MISHAPPENING DURING RAIN AS THERE ARE CHANCES OF WATER ENTRY INTO THE ELECTRIC JUNCTION.
HENCE THE SAME HAS TO BE TAKEN ON PRIORITY AND CONFIRM THE SAME.