Address: Chhabra Road, Brij Colony, near Powerhouse, Sodala |
Withing 3 months of span, it is third time that the digging is done on same road for different works. Last time it was dug for laying underground cables.
The work was completed before 2 weeks. But still the road construction work is not started. Due to the loose soil from digging and continuous vehicles movement. Dense dust formation is going on which lasts for whole day. The situation is very severe that it started causing irritation in throat and breathing problems. Please look into the matter as we know " Constructions are going on for our betterment but it should not compromise with peoples' health."
Hope you will look into the matter asap.
Proud Indian Was this information helpful? |
Post your Comment