Torrent Power — Not installing meter for Solar Power since long | |||
I Harish G. Shah have installed Solar panels at my resident 15, Swagat Bunglows2, Motera long back. All the relevant documents have been submitted to the torrent office on[protected]. As per the norms of torrent power ltd. it was informed that within 15 to 20 days the meter will be installed. 28 days have been passed but till date no solar meter has been installed. So many times personally inquired at torrent every time received same answer and I.e. will install soon. But till date not installed. My service No is 3076604. It is requested to kindly look into the matter and get installed the Solar meter at the earliest. My contact No is [protected]. Summer has started so use of electricity will be increased. Therefore Torrent should install solar meter at the earliest. Hoping for the early justice. With regards, Harish G. Shah Was this information helpful? | |||
Torrent Power customer support has been notified about the posted complaint. | |||
Add a Comment | |||
11%
Complaints
633
Pending
0
Resolved
57
Torrent House, Off Ashram Road, Ahmedabad, Gujarat, India - 380009
View all Torrent Power contact information
Post your Comment