CA NO.[protected],
the company without requirement of the customer, the load of the said connection has been enhanced. In the month of January, 2014 and around the January the work of the said house carried out then the MDI were high of the sanction load, while in the said house an another meter is also installed with sanction load of 2 KW, CA No.[protected] in the name of the DIVAKAR SHARMA. Presently there is no need of enhance of the Load of present CA No.[protected].
The load of the present CA No,[protected] may kindly be reduced with immediate effect. Was this information helpful? |
Post your Comment