I applied for a new connection on 31 /7/2019. On 1/8/2019, CESC inspection was done. The inspectors didn't talk to us. They also didn't inspect of the premises where I live in. Later on, online I found that the District Engineer has rejected my application on account of split load. CESC REF NO. is 14/13161 /19 dated 01/08/2019.
Now, please note my views as under -
1.My existing electric connection is from my mother, Sms. Shibani Mukherjee. She stays in the ground floor. I stay in the 1st floor of the house. Till now, she has rendered electricity from her Meter. Till now, my brother was staying outside the house elsewhere. Now, he has come and taken possession of the ground floor for staying with my mother. Now, my mother is not willing to give me electricity from her existing Meter. She is advising me to apply for a new Meter in my name. Therefore, under these circumstances, I would request you to please grant me a separate Meter immediately. Thanks Was this information helpful? |