Msedcl has been resorting to illegal power cuts in Haware Vrindavan Tower ABD CHS Khanda Colony Sector 9. The residents have been suffering despite paying all their bills on time & situation does not seem to improve. Msedcl imposed a power cut on 13-12-23 from 7 am onwards and power has not yet been restored till now, on 12-12-23 from 4.45 am to 7.15 am, on 8-12-23 from 12.30 pm to 4.00 pm, 1-12-23 from 11.30 pm to 1.30 am, 16-11-23 from 4 pm to 5 pm, 8-10-23 from 7.30 pm to 1.00 am, on 7-9-23 from 7.30 pm to 9 pm and again from 12.30 am midnight till 5 am, on 29-8-23 from 9.30 am to 11 am and again from 1 pm to 5.15 pm, on 19-8-23 from 7.30 am to 8.30 am, 18-8-23 from 6.30 am to 8.15 am, 12-8-23 from 9.50 pm to 10.40 pm, 8-8-23 from 10.30 am to 5 pm, 24-7-23 4.30 pm to 6 pm, 17-7-23 from 5 am to 7 am, 16-7-23 from 11 am to 12 pm, 14-7-23 from 9.15 pm to 10.30 pm, 10-7-23 from 8.15 am to 9 am, 10 am to 11 am, 4-7-23 from 8.30 am to 1.30 pm, 28-6-23 from 12 pm to 5 pm, 16-6-23 from 5.50 pm to 6.30 pm, 7.30 pm to 8.15 pm, 10.30 pm to 11.20 pm, on 14-6-23 from 4 pm to 6 pm, 12-6-23 1.50 pm to 5 pm, 11-6-23 from 7.40 pm till 11.45 pm, 7-6-23 from 7.40 pm till 11.45 pm, on 5-6-23 from 5 am to 5.25 am, 1.50 pm to 2.15 pm, on 4-6-23 from 2.40 am to 3.15 am late-night, on 3-6-23 from 1.40 am to 3 am late-night, on 2-6-23 from 1.40 am to 5 am late-night.
The helpline number[protected] of MSEDCL Khanda Colony is continuously busy as they unplug the receiver during power cuts. Due to these power cuts, residents feel groggy & incapacitated & fall sick as they can't breathe properly due to lack of ventilation and they end up suffocating and sweating excessively resulting in fatalities. Following are the problems faced by the residents:- 1. Residents feel groggy and incapacitated and fall sick and their heart rate increases leading to fatalities.2. Costly vegetables, fruits, milk, batter & other perishables etc stored in the refrigerator get spoilt leading to tremendous losses. 3. Mobile phones conk off due to disruption. MSEDCL has been torturing the residents over the last 32 years despite them paying all their bills regularly and that too well before the due date. Over the years, the population in Khanda Colony has increased tremendously but the transformer capacity has not been increased by MSEDCL due to unknown reasons. When will the existing residents get 24/7 power for 365 days. They have waited patiently for the last 32 years. Mind you, Khanda Colony is located in a city Navi Mumbai with close proximity to the Navi Mumbai international airport and is not a village to bear such brutal power cuts. The residents return home tired and weary from work and EOD there is no power. People are not cattle. It is high time the transformer capacity is increased to cater to all the residents requirements in the locality. The residents appeal to the Honourable Prime Minister and Maharashtra Chief Minister to initiate a CBI enquiry into these power cuts and resolve the issue permanently and provide much needed relief to the residents.
Was this information helpful?
Post your Comment