Address: | Ghaziabad, Uttar Pradesh |
On 14/06/2003, I deposited Rs 3518/- for 4-kilowatt connection in -Bed Room Flat sized approx. 900sq ft.
again on 06/07/2013 department demanded Rs 10959/- for increase 1- kilowatt connection ie total 5- kilowatt load. which I deposited immediately.
I enquired from Ex Engr. Vasundhra Ghaziabed regarding interest on security as well as Excess charges.
but received NO satisfactory reply.
Now from newspaper HINDUSTAN HINDI EDITION dared 29/04/2015, I came to know that department is not
paying interest on security deposit .
Whereas Mr. A K Gupta, Chief Engr. BIJLI NIGAM has sujjested to claim interest on security deposit and electric department will pay interest.
It is astonoshing, when interest on security deposit is payable to every consumer, WHY NOT PAID ?
It is, therefore, requested to IMMEDIATELY do the needful.
S K Sharma
A/C Id --[protected]
402, patrakar parisar, sector-5, vasundhra, ghazaibad.[protected]up)
Mobile-- [protected]
01/05/2015.
. Was this information helpful? |
Post your Comment