Address: | JDA JAIPUR, Jaipur, Rajasthan |
80 feet dhawas road adjoining 200 ft byepass is very poorly manufactured. The road level is very low due to which rain water is deposited over there in huge amount which lead to road accidents and severe disease can also be spread. Aroun 3 ft rain water is deposited for 5-8 days after rainfall. The road where water gets deposited is aroun 200 mtr in lenght. It starts from dhawas underpass 200 ft byepass and ends 200 mtr away towards west side of 200 ft byepass. Please repair it as soon as possible. Was this information helpful? |
And 4 floor also that is totally illegal without any front and back area. The person give the challenge to comunity
Aaj big tags rcc dal Raahi hai. ...aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaasassssssssaaasassa...⇄