The drainage work at muthambi-oorallur road, thadoli thazha junction, koyilandy taluk, calicut dt, for a length of about 100 mtr is progressing. The outlet after crossing road is directed towards my compound wall letting the water to flow to "nayadan puzha" (Lake). After completion, the water will flow directly to the bottom of my compound wall and after hitting my compound wall changes the direction of flow which will damage my wall. More over the nature of place is loose mud. It is learnt that there is no provision to continue the drainage after the limit of road. So it is here by requested that kindly do needful to avoid the damage to my wall at a length of about 15 mtr or so. An early action is requested as the canal water will open in last of january. Was this information helpful? |
Post your Comment