Address: | New Delhi, Delhi, 110021 |
Dear Sir,
We are the joint owner of the first floor of C-!6, Shivalik Colony at Malviya Nagar.
We, came to know on 07.05.2017 that the Owner of 2nd floor, Mr Punneet Kakkar, has started constructing on the set-off portion of backside of the flat and extending the bedroom illegally which is not a part of the approved plan. The photographs of the undergoing construction work (dated 08.05.2017) are enclosed. We requested him number of times telephonically to stop the work but he refused to do so.
Such extended construction, being unauthorized and without any proper approval, is hazardous and can cause loss of life and irreparable loss to property besides blockage of air and light on first floor since it is the only opening to the air and light for the bedrooms attached to this portion.
It is therefore requested that the unauthorized construction be stopped immediately and the building may be restored in its original shape as per approved plan for the safety of residents.
Thanking you
Yours faithfully
Sudhir Kumar Saxena & Archana Saxena
C-16 First Floor, Shivalik Colony,
Malviya Nagar, New Delhi 110017
Mob [protected]
Was this information helpful? |
Post your Comment