Comments
It took Torrent Engineers to restore power after 10 hours, which is totally unacceptable. Complaint was raised at around 3 AM and the torrent engineers came at 9 AM in the morning to rectify the fault and fix it. I was told that it would be resolved at around 4:50 AM which did not happen. Torrent guys came at 9 AM in the morning, after 6:30 hours after fault/cut off. These guys disconnect the power if the bill payments are delayed and when such fault happens they do not provide proper service/support. I believe the electric equipments are inefficient to handle the power load.
Reply
Dear sir
kindly do needful for vij pole no lm 4085 it is two day of in the street our area are very traffic base and late midnight very dengerous to accident in darkness
so please above vij pole to start as early as possible and needful
thanking you
kindly do needful for vij pole no lm 4085 it is two day of in the street our area are very traffic base and late midnight very dengerous to accident in darkness
so please above vij pole to start as early as possible and needful
thanking you
dipak d rathod's reply, May 29, 2018
compline resolve as early as possible