Uttar Pradesh Power Corporation [UPPCL] — unnecessary delay in new domestic electric connection by je sandeep kumar, fatehgarg, farrukhabad (up). | |||
Sir, I have applied for new domestic electric connection on 05 feb 2019 at power sub station bholepur fatehgarh (Up). Sandeep kumar, junior engineer (City) said that estimate will be prepared for my domestic connection. Whereas three poles estimate has already been prepared by sandeep kumar, junior engineer, one yaer agofor the same way and my house between the poles already estimated. Sandeep kumar, junior engineer, neither preparing estimate nor providing new connection causing harassment to me. Therefore you are requested to requested to instruct sandeep kumar, junior engineer (City) to provide connection as early as possible. My husband is soldier of indian army and he is presently posted to remote field area and he can't help me. I have to settle in my new home with my school going children so electricity is vital for me. Thanking you for your kin consideration please. Kiran singh Allahganj, barhpur, farrukhabad (Up) mob no [protected] Was this information helpful? | |||
Uttar Pradesh Power Corporation [UPPCL] customer support has been notified about the posted complaint. | |||
Add a Comment | |||
6%
Complaints
2232
Pending
0
Resolved
123
+91 52 2288 7703
+91 52 2288 7701
Shakti Bhavan, 14, Ashok Marg, Lucknow, Uttar Pradesh, India
Post your Comment