Claimed

Dakshin Haryana Bijli Vitran Nigam Complaints & Reviews

1
Updated: Aug 1, 2024
Complaints 879
Resolved
169
Unresolved
710
Contacts

File a complaint to Dakshin Haryana Bijli Vitran Nigam

Having problems with Dakshin Haryana Bijli Vitran Nigam?

File a complaint and get it resolved by Dakshin Haryana Bijli Vitran Nigam customer care. It’s quick, effective and absolutely free!

SUBMIT A COMPLAINT

Dakshin Haryana Bijli Vitran Nigam reviews & complaints page 44

Newest
  • Newest
  • Most Helpful
  • Most Popular
  • Resolved
  • Contains Photos or Videos
  • Oldest
B
bairwa2011
from Kolkata, West Bengal
Sep 26, 2009
Resolved
Report
Copy
Resolved

To
The Managing Director
DHBVN limited, Haryana

Sir,
I am the resident of H.No. 176/A,sector 30, Shramik Vihar faridabad haryana, It is stated that My Account No is AA-13-0746,in Sub Division West,Faridabad, I have submitted my all dues and there is no pending bill against me, The DHBVN has sent a bill of Amount of Rs.35758.00 Against the Bill reading 7407, While the Actual Reading in my residence Electric meter is 508 Today i.e. 26/09/2009,Please do the needful in my favour.

Thanking You,
Yours Faithfully
OMPRAKASH BAIRWA
HNo 176/A, Shramik Vihar Sector 30,
Faridabad Haryana
[protected][protected][protected]
MY Billing Details is under
"Bill No 8709020, issue date 12/09/2009
Account No-AA13-0746,
F12/Sub division west
division Faridabad
K.No. [protected] "
Aug 13, 2020
Complaint marked as Resolved 

DHBVN Limited — excess bill without reading

To
The Managing Director
DHBVN limited, Haryana


Sir,

I am the resident of H.No. 176/A,sector 30, Shramik Vihar Faridabad Haryana, It is stated that My Account No is AA-13-0746,in Sub Division West,Faridabad, I have submitted my all dues and there is no pending bill against me, The DHBVN has sent a bill of Amount of Rs.35758.00, against the Bill reading 7407, While the Actual Reading in my residence Electric meter is 508 Today i.e. 26/09/2009,Please do the needful in my favour.

MY Billing Details is under
"Bill No 8709020, issue date 12/09/2009
Account No-AA13-0746,
F12/Sub division west
Division- Faridabad
K. No. [protected] "

Thanking You,
Yours Faithfully
OMPRAKASH BAIRWA
H.No 176/A, Shramik Vihar Sector 30,
Faridabad Haryana
want duplicate copy of our bsnl landline billl for last mnths jan.n apiral our number [protected].
our

without reading sending the bill - Comment #1428154 - Image #0

No Repairs of meters

Sir Mai Sirsa Haryana se hu .Hamare yaha pr aaj sham6 bje se light ni h yani june1 2016 se or raat ka ek bje tk koi light thik krna aaya.Maine aapke Toll free no. Pe bhi complaint krwayi . Hamare area ke JE ne bhi attend krne se mna kr diya .Hum bahut pareshan ho rhe h . Or kripya kr ke aap JE Harneet Singh Ko bhi tackle kre.

Electricity problem

On line admission is started from[protected] but last 25 days college facing the electricity problem. So you are requested to do the needful .
Helpful
Found this helpful?
4 Comments
Report
Copy

Post your Comment

    I want to submit Complaint Positive Review Neutral Comment
    code
    By clicking Submit you agree to our Terms of Use
    Submit
    M
    Meghna Ghosh
    from Hyderabad, Telangana
    Sep 22, 2009
    Resolved
    Report
    Copy
    Resolved

    Sir/Madam,
    I have a Electric connection of A/c No. K [protected] at Faridabad. I had received a Bill of Rs. 1,568/- at May,09 and I couldn't paid the bill due to personal reason. After next Bill they have sent a bill of Rs. 10,000/-. Then I had submitted a written complain to SDO, Dakshin Haryana, Faridabad. He marked the complain to concern JE (Mr. Sharma), I request him also but not solved the problem. In next Bill they have send of Rs.20,000/-. After wards again I complained to SDO, then his official says OK you will submit Rs. 16,867/- But I can't understand how it is possible. My total reading is 1380 and I have already paid of Rs. 3000/-(Apprx). That means the rate of Electricity is more than Rs. 13/- per unit in domestic small meter. In my calculation it is may be around Rs. 6000/- maximum. How I can pay Rs. 10000 to 12000 more. Please do needfull.

    With regards,
    Meghna Ghosh
    Cell [protected]
    Aug 14, 2020
    Complaint marked as Resolved 
    I had received a Bill of Rs. 1,568/- at May,09 and I couldn't paid the bill due to personal reason. After next Bill they have sent a bill of Rs. 10,000/-. Then I had submitted a written complain to SDO, Dakshin Haryana, Faridabad. He marked the complain to concern JE (Mr. Sharma), I request him also but not solved the problem. In next Bill they have send of Rs.20,000/-. After wards again I complained to SDO, then his official says OK you will submit Rs. 16,867/- But I can't understand how it is possible. My total reading is 1380 and I have already paid of Rs. 3000/-(Apprx). That means the rate of Electricity is more than Rs. 13/- per unit in domestic small meter. In my calculation it is may be around Rs. 6000/- maximum. How I can pay Rs. 10000 to 12000 more. Please do needfull.
    I AM COMPLAINING, THAT DISTRIBUTION OF BILLS IS WRONG WE ARE NOT GETTING AT HOME. I[censored]nable to provide this facility, not send the bill and kept with office sothat we can able to collect the bills from office
    Helpful
    Found this helpful?
    2 Comments
    Report
    Copy

    Post your Comment

      I want to submit Complaint Positive Review Neutral Comment
      code
      By clicking Submit you agree to our Terms of Use
      Submit
      T
      Tanishq Bhardwaj
      from Delhi, Delhi
      Sep 19, 2009
      Resolved
      Report
      Copy
      Resolved

      S.No.--- Meter Reading date------- Meter reading[protected][protected]Bill status
      New[protected] Old[protected] New----- Old------ Units--Period
      1 12/11/[protected] 12/09/[protected] 14160--- 13802-- 358---- [protected] Bill paid Rs. 1367 Paid
      2 12/01/[protected] 12/11/[protected] 1441---- 14160-- 419---- [protected] Bill paid Rs. 1644 Paid
      3 12/05/[protected] 12/03/[protected] 14860--- 14160-- 700---- [protected] Bill paid Rs. 2969 Paid
      4 12/07/[protected] 12/05/[protected] 15289--- 14160-- 1129---- [protected] Bill not paid
      5 12/09/[protected] 12/07/[protected] 15752--- 14160-- 1592---- [protected] Bill not paid

      When I received bill dated (12/05/09 to 12/07/09, (at S.No. 4) my grandfather informed SDO sub division Palwal in written. He inquired and found that the mistake done by billing department and he also assured that the mistake will be made solved. But after this I again received bill from 12/07/09 to 12/09.09 (at S.No. 5) again showing old units 14160 which I have paid in month of January in Indian Oversees Bank Railway Road Shiv Colony Palwal. Kindly instruct the officers to correct my bill and inform as well as. I have all receipts of bill paid by me which I have already produced before SDO SUB Division Palwal City.



      Tanishq s/o Mohan Lal
      Shiv colony Palwal
      Near MVM School
      palwal
      Meter No. DD13-2717)
      Ph [protected]
      Aug 14, 2020
      Complaint marked as Resolved 
      SUBJECT:- Error in billing (Meter/account No. DD13-2717)

      Name DEVI RAM
      Address LIKHI RAM MVM SCHOOL
      SHIV COLONY PALWAL

      SUB DIVISION F41 – SUB DIVN PALWAL (City)

      S.No. Meter Reading date Meter reading Units Period Bill status
      New Old New Old
      1 12/11/08 12/09/08 14160 13802 358 2 Bill paid Rs. 1367 (Indian Oversees Bank )
      2 12/01/09 12/11/09 1441 14160 419 2 Bill paid Rs. 1644(Indian Oversees Bank )
      3 12/05/09 12/03/09 14860 14160 700 4 Bill paid Rs. 2969(at counter of electricity board near Swaraj tractor agency )
      4 12/07/09 12/05/09 15289 14160 1129 6 Bill not paid because I came to know the mistake done by billing department
      5 12/09/09 12/07/09 15752 14160 1592 8 Bill not paid


      When I received bill dated (12/05/09 to 12/07/09, (at S.No. 4) my father informed SDO sub division Palwal in written. He inquired and found that the mistake done by billing department and he also assured that the mistake will be made solved. But after this I again received bill from 12/07/09 to 12/09.09 (at S.No. 5) again showing old units 14160 which I have paid in month of January in Indian Oversees Bank Railway Road Shiv Colony Palwal. Kindly instruct the officers to correct my bill and inform as well as. I have all receipts of bill paid by me which I have already produced before SDO SUB Division Palwal City.



      Mohan lal s/o Shri Devi Ram
      Shiv colony Palwal
      Near MVM School
      palwal
      Meter No. DD13-2717)
      Ph. [protected]
      SUBJECT:- Error in MCO (OLD Meter/account No.- 0387, NEW Meter/account No.-1633)

      Name PREM CHAND
      Address GALI NO-9/10, WARD NO-13
      TIBBA COLONY RATIA-125051

      SUB DIVISION H43 – SDO CITY RATIA

      I am informing u that my old meter no:mt-0387 has burn and than i have change new meter no-mt-1633 & also meter owner name also changed.i have not getting new bills after change new meter because MCO NO-16/257 has not changed, i have regularly inform SDO but no action.I kindly inform u my electricity bill have getting acccording to new meter reading & MCO has changed as soon as possible.i heartly thank u

      Prem Chandl s/o Shri Laxman Dass
      Tibba Colony Ratia
      Ward No-13, Gali No-9/10
      Ratia City-125051
      Meter No. 1633)
      Ph. [protected]
      Sir, It is to bring to your kind notice that my Electric meter reading was stopped and it was out of order for almost two months prior to its replacement with the new one . Now i am in receipt of my electricity bill from 05.11.2010 to 05.01.2011which almost shocked as me as 480 units are shown as consumed, I think on average basis while it being a cold season my hardly consumption is about 100-110 units per months . Since a new meter has now been installed, should pay the whole amount and wait for any adjustment in future or you may rectify it suitably so that i could pay the genuine amount.Account NO- EE12-0699, Bill No. 1326, Issue date -21.01.2011
      .KINDLY INFORM WHAT TO DO ?
      MADHURI DIXIT
      I totally agree with you. Same is the problem with me. My K. No.: [protected] & Account No. : NC04-0940. We asked the information regarding adjustment of arrears against my temporary meter connection through RTI. The SDO, Sector-18, Gurgaon called us in his office and felt sorry for the error. Also, promissed that the problem will not be repeated. However the problem remains same and I am getting an arrear of Rs. 28000 in current cycle bill though there is no dues towards me.

      extra amount given in electricity bill

      Sir, extra amount given in electricity bill by dhbvn. both 41 units and 104 units bill amount are same as 749.
      Helpful
      Found this helpful?
      5 Comments
      Report
      Copy

      Post your Comment

        I want to submit Complaint Positive Review Neutral Comment
        code
        By clicking Submit you agree to our Terms of Use
        Submit
        A
        Ankur Kalra
        from New Delhi, Delhi
        Sep 10, 2009
        Resolved
        Report
        Copy
        Resolved

        There was heavy fluctuation at our house, Hno : 467 Sector 30 on 1 sep 2009. After that electricity went off, when checked only one phase is coming out of 3 phase meter installed.
        When we complaint to power officials no one is here to come, when we said we would complaint to higher officials then one line man came and we were told that the electricity wire is problematic and needs to be replaced, this happened after 9 days of every day complaints.
        Now we have got the wire purchased still no line man is here to replace it.
        Adding to our woes, no one picks up the phone. On 9'th Sep itself the day we have purchased the cable after being told that needs replacement, there was heavy rain in the evening and light went off
        Now there is no electricity or the voltage is less than 60 V ( that's too on one phase that we are getting for last 10 days ). There is no one to listen to our complaints, no one pickup phone.
        When tried to dial their number from different phone, a person picks up phone and says there is other work to do and he disconnects.
        Can someone help us in getting our electricity back, it's more than 10 days, we are suffering at the hand of these power officials who are non-cooperative .
        Aug 14, 2020
        Complaint marked as Resolved 
        This is for city Faridabad.
        Helpful
        Found this helpful?
        1 Comment
        Report
        Copy

        Post your Comment

          I want to submit Complaint Positive Review Neutral Comment
          code
          By clicking Submit you agree to our Terms of Use
          Submit
          P
          Puneet Gulati
          from New Delhi, Delhi
          Aug 25, 2009
          Resolved
          Report
          Copy
          Resolved

          Dear Sir,

          This is to bring into your kind notice that we, residents of Ashoka Enclave - III, House number 38-24 are suffering from high voltage fluctuation problems for over two months.

          Almost every house has got one or more appliances damaged because of this.

          The concerned staff fixes the complaint when we visit them for 2- 3 days and it re occurs after another 2-3 days.

          I am optimistic that this will reach right people and some action will be taken.

          Regards and thanks.

          Puneet
          Aug 14, 2020
          Complaint marked as Resolved 
          Respected sir,
          I am a resident of Shakti Nagar. There is an illegal business going on in house number 504/20 Shakti Nagar of Manori Lal. They are supplying water from this house. They are using high voltage compressor for cooling the water. Due to this many times the wires coming from pole caught fire & many of the appliances got damaged of other residents living nearby. It is also causing shortage of water. This whole business is done without the commercial connection of water & electricity.
          Kindly take a serious action against them. So that other citizens can live peacefully.
          Thanking you.
          Yours Faithfully
          Resident of Shakti nagar.
          WORST IRON PIPE POLE
          Dear Sir,

          This is to bring into your kind notice that we, residents of Bhuna road (Road Crossing) Dr.Partap Sagwan Hosipatal Road are suffering from worst iron pipe pole problems for maney months.The pole is damage from bottem.So you are requested to please replace pole as soon to avoid any miss happening. We are indicate to concerned City Incharge Uklana Mandi.

          Almost every house has got one or more appliances damaged because of this.
          The concerned staff fixes the complaint when we visit them for 2- 3 days.

          I am optimistic that this will reach right people and some action will be taken.

          Regards and thanks.
          Rajender Singh Bhuna Road Uklana Mandi (Hissar) Haryana
          Helpful
          Found this helpful?
          2 Comments
          Report
          Copy

          Post your Comment

            I want to submit Complaint Positive Review Neutral Comment
            code
            By clicking Submit you agree to our Terms of Use
            Submit
            C
            chatar lal
            from Delhi, Delhi
            Aug 17, 2009
            Resolved
            Report
            Copy
            Resolved

            Annexure-I

            Performa for Complaints

            1. Name, address and telephone No., if any of the complainant. :

            Chatar lal

            Address; House No 119, ward No. Punjabi Wara, Ballabgarh 121001

            PH: [protected]

            2. Consumer account Number (Optional) : -DD15-1531
            Sub Division : F 32- No 1 Ballabgarh
            3. Brief description of the complaint:

            Meter reading in the bill No 4274 dated 14.08.09 bill month Aug/2009 was wrongly / through oversight taken as 18835 .Present reading as on[protected] when I received the bill is 18723.KIndly note the error and adjust the same in next bill.
            Aug 14, 2020
            Complaint marked as Resolved 
            Helpful
            Found this helpful?
            Write a comment
            Report
            Copy

            Post your Comment

              I want to submit Complaint Positive Review Neutral Comment
              code
              By clicking Submit you agree to our Terms of Use
              Submit
              C
              chatar lal
              from Delhi, Delhi
              Aug 17, 2009
              Resolved
              Report
              Copy
              Resolved

              Meter reading for My electricity bill no 4274 dated 14.08.2009 bill month aug2009 has been wrongly / through oversight taken as 18835 instead of 18635. Kindly do the needful.



              C L GUPTA
              A/c no DD-15-1531
              Sub Div: F32- NO1, Ballabgarh
              Aug 14, 2020
              Complaint marked as Resolved 
              sir, hamari shop ki light 2 din se nahi aa rahi hai, , hamne kai baar complaint ki hai, , par ye log kehte rehte hain aa rahe hain aa rahe hain, , par aate nahi hain, , sab ke sab corrupt hain, , inka phone no-[protected], , , 50% to switch of rehta hai, , plz sir hamari light sahi karwa dijiye, ,

              DINESH COMMUNICATION
              SHOP. NO.2, OPP.AGGARWAL DHARAMSHALA
              NATHU COLONY, BALLABGARH
              [protected]
              sir, hamari shop ki light 2 din se nahi aa rahi hai, , hamne kai baar complaint ki hai, , par ye log kehte rehte hain aa rahe hain aa rahe hain, , par aate nahi hain, , sab ke sab corrupt hain, , inka phone no-[protected], , , 50% to switch of rehta hai, , plz sir hamari light sahi karwa dijiye, ,

              DINESH COMMUNICATION
              SHOP. NO.2, OPP.AGGARWAL DHARAMSHALA
              NATHU COLONY, BALLABGARH
              [protected]
              Helpful
              Found this helpful?
              2 Comments
              Report
              Copy

              Post your Comment

                I want to submit Complaint Positive Review Neutral Comment
                code
                By clicking Submit you agree to our Terms of Use
                Submit
                S
                Springfield Resident
                from Delhi, Delhi
                Aug 11, 2009
                Resolved
                Report
                Copy
                Resolved

                Dear Sir/Madam,

                Springfield colony in Faridabad suffers unpredicted cuts and outages during summers .
                Yesterday 10 August 09) their was an outage till 11 PM from 9 AM Onwards .
                power cuts were freqent during the day time also. On an average there are power cuts of 8-10 hours everyday.
                I want to highlight the power issue is in routine and are very long.
                The sutation is pathetic, senior citizen/childrens/patient are having toughest time to live in.
                DHBVNL have not upgraded their distribution networks and transformers.

                Your intervention will make them accountable.

                Thansk & Regards/

                Springfield Colony Resident
                Aug 14, 2020
                Complaint marked as Resolved 
                Dear Sir/Madam,

                Charmwood in Faridabad suffers unpredicted cuts and outages during summers .
                Yesterday night 09 August 09) their was an outage till 5:45 AM from 20:00 Onwards .
                power cuts were freqent during the day time also. 2-3 days back also there was outage for 10-12 hours.
                I want to highlight the power issue is in routine and are very long.
                The sutation is pathetic, senior citizen/childrens/patient are having toughest time to live in.
                DHBVNL have not upgraded their distribution networks and transformers.

                Your intervention will make them accountable.

                Thansk & Regards/

                Nitin Sharma
                Its really a pathetic situation here. Every alternate hour there is power cut in the night
                May it be Summers, autumns, Winters or rains.. common things:

                1. Power Cuts and power problems sector 19
                2. roads are broken and practically no roads in sector 19
                3. Overflowing sewage
                4. Worst then a slum is sector 19 faridabad

                Not even God can save it...from callous officials of MCF, HUDA, Haryana Govt and their connevence with the local Councillors and MLAs.

                Need to file an RTI for the the funds that have been allocated for development
                Dear Sir/Madam,

                Dayal Bagh colony and Shiv Durga Vihar colony in Faridabad suffers unpredicted cuts and outages during summers .Power cuts were freqent during the day time also. On an average there are power cuts of 8-10 hours everyday.
                I want to highlight the power issue is in routine and are very long.
                The sutation is pathetic, senior citizen/childrens/patient are having toughest time to live in.
                DHBVNL have not upgraded their distribution networks and transformers.

                Your intervention will make them accountable.

                Thansk & Regards/
                Dayal Bagh Residency

                POWER OUTAGES — POWER OUTAGES

                Sir, i am a bonafide & law abiding citizen of this country, i also pay all types of taxes regularly. I pay my power and other bills also on regular basis. For the past 15 days i have been put to hardship becoz of the 4 hours power cuts for no fault of mine. The agitiation in telengana are Govt related matter why should i bear the sufferings. Is this the right approach to telangan, nowhere in the worl such senseless methods have been adopted as a form of agitation. The elderly people and the patients are the worst who are suffering silently bcoz of the power outages. Is this what we offer to our senior citizens. Is this what we expect from the elected governinbg body. We have to suffer power cuts when there are no adequate rains we have to suffer when there is agitation etc.,.. Is there no accountability for such reckless handling of things. The 4 hrs of power cut is making my refrigerator a piece of dummy as good as a wardrobe. THe problem list goes on, plz somebody for Gods sake take up the matter at the right place and resolvve the manmade power crisis.
                to hell with this present situation
                hour long power cut that too very frequently ...i am resident of sector 16, faridabad
                Power cut is too frequent in Springfield colony. Both the authorities and the general public are equally responsible for this sorry state of affairs. One is that enough power is not generated / distributed. And we use too much of it. Just look at the air conditioners we use. Most of the single phase consumers have ACs. This leads to power shortages and too much heat generation.

                So no one can wash their hands off in this case.
                Helpful
                Found this helpful?
                8 Comments
                Report
                Copy

                Post your Comment

                  I want to submit Complaint Positive Review Neutral Comment
                  code
                  By clicking Submit you agree to our Terms of Use
                  Submit
                  P
                  pawan pathak
                  from Delhi, Delhi
                  Aug 3, 2009
                  Resolved
                  Report
                  Copy
                  Resolved

                  we are residents of sec 37 faridabad are facing tremendous problem of electricity in a particular unit . from kothi no 1101 to 1155, many times half row having light & another half without light. then in night we have to search the line main as no one picks the ph in compliants area. the persons who is sitting near the pannels inside, he says i can;t do anything & starts distributing the no of J.E, S.D.O .& says call them to rectify ur problem. agian here no body pick the phone.

                  now where we will have to go to solve our problems as no body is going to listen .

                  thanks
                  Aug 14, 2020
                  Complaint marked as Resolved 
                  I agree with yours, same thing happened last night on 6thAugust 09 in Karnal sector-13, Hno-1096 onwards, From the midnight 1200hrs to till morning time 8:40am, there is no electricity, 8:30hrs has passed, we have complaint to electricity board karnal, no further action is taken.This is happening in every night, either the voltage will be very low or the light will cut off.
                  I think Karnal has come in the worst condition of electricity supply.


                  Nobody is checking what is happened?????????
                  My name is Mahedra mendiratta, residents of 2J/WH/49 NIT FARIDABAD are facing a problems due to line mans attitudes. We have no electricty since yesterday's night 9/9 and complaint been registered NIT NO. 2 ELECTRICTY BOARD today morning at 6 Oclock morning but it is 5.30 today dt. 10/9 but no one came and see the fault. It is just because of negligency of the line mans as ther is a loose connection of main wire at the pole and we have no electricty.

                  Please help us and resolve this problem.
                  regards,
                  Mahendra Mendiratta
                  [protected]
                  I am from Bahadurgarh Haryana. We are facing same problem. Here electricity doesn't come even whole day n night. We just have electricity 5 - 6 hours per day. We are living in Sec - 9A housing board..here nobody listen even JE doesnt pick up phone..
                  What we do..Is it beneficial to making comment here??
                  I am from Bahadurgarh Haryana. We are facing same power cut prombles. Apart from that major problem is that no body is picking up there phones in complaints centre. Please help us to resolve the problem.
                  regards
                  Nikhil
                  [protected]
                  Helpful
                  Found this helpful?
                  4 Comments
                  Report
                  Copy

                  Post your Comment

                    I want to submit Complaint Positive Review Neutral Comment
                    code
                    By clicking Submit you agree to our Terms of Use
                    Submit
                    A
                    Ashok Malhotra
                    from Gurgaon, Haryana
                    Jul 23, 2009
                    Resolved
                    Report
                    Copy
                    Resolved

                    Hi,

                    I just wanted to share my personal experience when I happened to visit this office for correction in my electricity bill.

                    It was S.D.O. office. This office was so pathetic that just to get the bill corrected it took me 2 hrs standing there in the office. There were 3 clerks, out of which 2 were gossiping and 1 seemed to be overloaded. When I asked one of the clerks who were gossiping to take care of my case, he took it up my papers, but started searching for a calculator in whole office. Finally he got frustrated as not finding even a single calculator for him, he put my papers on other clerk's desk.

                    Calculator was not the only issue, the way that clerk was also talking in a very rough and blunt manner as if he were some minister.

                    Friends, this is the worst attitude I have seen amongst the govt offices. Though I agree, we cant expect much sophistication from Gov offices, but this was the extreme.

                    God save India. May Govt offices learn to operate properly.

                    Jai Ho.
                    Aug 14, 2020
                    Complaint marked as Resolved 

                    DHBVN office, Kanhai Village — Correction of address on Bill

                    Dear Sir,

                    It has been months following up with Mr. Khan for correction address printed on the bills received. Everytime you call him or visit him he pretends to be Busy. No escalation matrix for escalating complains. Online Complains on website of no use.

                    Regards,
                    Hi

                    No problem. Its normal for all Garib Janta. You have experienced this with one clerk of DHBVN but I have the experience with one DHBVN officer Mr. Deshwal, SDO at Sector 18. You will not imagine how he treats the customers. He uses dark goggles while seating in his office and treat the customers worst than stray dogs. His tongue, I was surprised to see, how we select an officer?

                    Thanks
                    It is not only the pathetic attitude of juniors but also of seniors like SDO Ms.Rekha Rathi and Executive Engineer Mr. Mahaveer Sing, I have worst experience I happened to visit their Sector 31 Gurgaon Office on Saturday for their continuously showing arrears for a bill which is ont only paid in March 2009 but also brought to their notice twice with the payment proof but bill is still showing arrears and every time it comes with the additional charges. No senior person available on Saturday to even listen to complaints and on making a telephone call to SDO and Ex. En they reply irresponsibly.

                    Now it is consumer who has to make round to their office for their silly mistakes again and again while staying on leave and west the working day no matter how busy the person is.

                    I am thinking to go to Consumer Court.
                    Do you hear Mr.Minister, elections are fast approaching ...
                    I COMPLAINTED FOR MY FAST RUNNING METER ON 27-MARCH 2009 BUT IN VAIN. AGAIN I COMPLAINED IN MAY 2009 AND CONTACTED MR. J E, WHO WROTE TO LINEMAN TO CHECK THE METER. THE LINEMAN CHECKED THE METER AND WROTE THAT ` meter reading nahi de raha hai' THEN HE AGAIN TOOK THE REPORT AND SAID THAT HE WILL CHECK IT AGAIN . BUT WE GOT IT AFTER ONE AND HALF MONTH HAVING THE SAME EARLIER DATE ` reading ok' TILL THEN WE WERE GETTING THE ASSUMPTED ELECTRICITY BILLS. IN BETWEEN THERE WERE EXCUSES LIKE METER IS FIXED VERY HIGH, UNABLE TO SEE THE READING ETC. THEN WE WERE TOLD THAT METER HAS BEEN STOPPED, FILE A COMPLAINT AND PAY THE REQUIRED FEE AND GET INSTALLED THE NEW METER. THE COMPLAINT WAS FILED ON[protected].WE TOOK THE PAINS & LUCKILY THE METER WAS CHECKED ON THE VERY SAME DAY, WE SUBMITTED THE REPORT TO JE ON[protected] HAVING APPLICATION NO.21228793, ACCOUNT NO-kh03/0084, SAN. CATEGORY-DS, SAN.LOAD- 11KW MCO-NO. 30733/09-10. WE WERE ASKED TO COME AFTER 15 DAYS. WHEN WE FOLLOWED THEM WE WERE TOLD TO CONTACT M/S DURGA ELECTRICALS . WE DID NOT GET THE NEW METER TILL DATE BUT GETTING THE BILLS OF RS 6000/- RS 7000/- AS UNITS CONSUMED IN THE HOUSE IS VERY LOW. TO HELP MYSELF I INSTALLED NEW ELECTRIC SUB-METERS .
                    AS I AM A DIABETIC AND HYPERTENSION PATIENT, I AM UNABLE TO BEAR THE UNNECESSARY TENSION . I CAN'T PAY THE EXCEEDED AMOUNT WHICH IS GIVING ME MORE TENSION.
                    SIR, IT IS MY HUMBLE REQUEST TO SOLVE THE PROBLEM AT EARLIEST OR GUIDE ME FOR THE GOOD.
                    I have Very Bad experience at S.D.O office. staffs are least bothered about consumer support. Just pestering consumers to get bribed (CC - Mr. Balbir).

                    Would request to take neccessary action immediately.

                    Thanks & regards
                    Susanta Kumar
                    M - [protected].
                    Dear Sir,

                    I have very serious complaint against the electricty is cutting in Mohyal Colony, during evening and night for five to six hours.There is no reason.Check the system.
                    Thanks.
                    DHBVN is the worst service provider, populated by semi-literate, rude, corrupt officials in all ranks. For the last 5 years I have been billed at flat rate when my premises remain locked and electrical fixtures are also not put in. At the whims of clerks, I get billed for 960 units and sometimes 480 units flat without meter reading. Twice I was made to change meters and also pay for the meter they now put outside on the pole ( a marvel of ingenious thinking!). My complaint file weighs 5 kilos. No redressal and made to pay through my nose. Can any one suggest any way out ?
                    Janki Mukherjee
                    I ENDORSE WHATEVER HAS BEEN SAID ABOUT KHANAI VILLAGE OFFICE OF DHBVN. SOMEONE PAY HEED AND DO THE NEEDFUL TO SET THE SYSTEM RIGHT. ANOTHER SCAM WHICH IS GOING ON IS WITH REGARDS TO METER REPLACEMENTS. HOW COME SO MANY ELECTRICITY METERS OF DIFFERENT MAKE & TYPE OF THE AREA ARE GOING FAULTY REQUIRING REPLACEMENTS WITHOUT BEING TAMPERED.
                    Regarding Power Connection for Borewell
                    Dear Concerns,
                    I am Rahees Ahmed belongs (Mewat) we dug a submersible last year in Jan month. For the same we need power connection as its 700 ft down to earth. We had applied for connection on March of 8th and deposited security of 22000/-. Since last year we run our Bore well through Generator which is very much costly 150rent of generator and 7 ltr Diesel per hour. 500/- per hour is a big cost for a kissan. We have tried our best and every employee of DBHVN FPJ regarding same no solution comes out. But now the time has come when we had break our patience now we had paid 100000/- to contractor for connection and now they are giving assurance it will be completed with in 7 days. What is this is feasible for Anna-data. We had given and spend big money for RISHWAT and how is corruption openly in market here every one RISHWAT KHOR either its ELCTRICITY DEPTT all are corrupt here as literacy is not here.. all are using this short cut by this eligible and capable persons are disparate by rich and corrupted peoples.
                    I request you to what is the way to face such kind of peoples and deptt’s. how we can raise our standard as here we have to pay for corrupted Police and all deptt here. Here only minor resources of earning their livings and these type of wolfs come and snatches all
                    Pls suggest me what is alternate or I have to go ahead for better response.
                    Yours Sincerely
                    Rahees Ahmed
                    I am a pensioner and a senior citizen. I have served the countries Armed forces for 33 years and participated in Indo-Pak War - 1971, Sri- Lanka[protected] and CI Operations in J&K. I always served the country with a pride. Now I am residing in 56 sec which comes under DHBVNL Kanhai Vill. I am ashamed to write about the state of affairs in this office.
                    My meter develop a snag in 2009, May.I was given a bill of 34, 000/-. I approached Mr DAGAR, SDO with an application. He told me to contact one of the lineman for meter check.my meter was checked and after running around and payment of Rs 7, 000/- my meter was replaced. I have names and documents of the employees involved. It took me more than one year and intervention of senior DHBVNL audit officer from Hissar to settle my case.
                    On 27 Apr 2012, I was told by meter reader that my meter is not working. I visited SDO office on 30 Apr 2012 with my application and I was asked to submit the same to one of the clerk. After 2 days one meter reader came in my absence and told my wife that meter is working and there is nothing to worry. On my return I found that meter was still not working. I again went to DHBVNL office on 02 May and submitted another application. In the meantime my meter started jumping and showing fresh reading.No one turned up for next 3/4 days.
                    I again visited the office and contacted the same clerk as SDO is never available.I was asked to meet JE.He gave me two mobile numbers ans asked me to contact those linesmen for fresh meter reading.On 15 May 2012 they came and checked my meter notified reading and gave remarks " Meter Not Working". they also assured me that meter will be replaced if I give Rs 8000/-.
                    Next day ie 16 May I again went to DHBVNL office with those remarks. I was asked to buy a meter and come.I spoke to linesmen and they told me to obtain a MCO only than they will change meter. When I asked the employees sitting at the counters they immediately asked me which meter I am looking for. it appeared that they are working for Meter dealers. Next 10 minutes one dealer came with a meter and bill and I paid Rs 3800/-. Clerk immediately wrote on my application and asked me to deposit Rs 530/- at the next counter. I approached the dealing clerk and gave him Rs 550/-. He immediately remarked that I am the first person and doing " Bonny" and never returned Rs 20/- to me.
                    I went inside and obtained MCO. Thereafter deposited connected documents alongwith new meter in JEs office. When asked when will my new meter will be installed ? Reply was minimum 15 days. In the meantime few more consumers who already waited for 15 days came to inquire and were told in negative.
                    Now I am waiting for new meter to be installed and my old meter is galloping and my heart is sinking. I feel mentally, physically and financially harassed senior citizen. Will some one help me ? I have purposely not given names and details of various DHBVNL staff because I am praying to GOD that better sense prevail and there is a positive outcome.
                    Will someone process this complaint ? Else I am wasting my time and energy.
                    Hi my self Vinod Kumar,
                    i am leaving in sec-39, jharsa .
                    onthis month bil is comming rs. 17990, the reading is shows 18994, but in meter reading is 17161 on 29 May 2013.
                    plese tell me what to do. Pay the bill, and u refund it or something else
                    Hi,
                    Anjna here
                    We have received the bill of 22469 which is not possible, This bill has come for all the residents of 52 3 times more . NO one is investigating the matter .
                    Respected sir
                    I have given a written complaint three month back in the month of Aug 2020 regarding updating of name and mobile number. Today's I received the bill with the same wrong spelling of name and old mobile number.
                    My account number is
                    [protected]

                    Due to this problem I m not able to pay the bill online. Please help me.

                    Regards
                    Shailendra sharma
                    2280 sec 46
                    Gurugram
                    Helpful
                    2 other people found this review helpful
                    2 found this helpful
                    14 Comments
                    Report
                    Copy

                    Post your Comment

                      I want to submit Complaint Positive Review Neutral Comment
                      code
                      By clicking Submit you agree to our Terms of Use
                      Submit
                      S
                      srawa
                      from Chennai, Tamil Nadu
                      Jul 1, 2009
                      Report
                      Copy

                      Dear All,

                      This is regarding the complaints logged with electricity department.

                      On Saturday(27th June 09) night we registered the complaint regarding no electricity in 10-12 houses . On sunday evening(after 20 Hrs) it was attended and since then the cusrrent is passing in every electronic item in these houses. We are continuously registering complaints with them, one fine evening some line men with Incharge visited and told that yes there is problem with Transformer and cables that need to be checked but because it was dark in evening so he told us that he will visit on tuesday morning. No one visited after that evening and the current is flowing in every electronic item.

                      Today on 01 Jul 09, they called us telling that check with private electrician we cannot do anything.

                      Who will be responsible if anything unfortunate happened. There are small kids in these houses who will not listen and can touch these electronics.

                      Please do something for immidiate response as it a very serious issue that can lead to a big damage to anyone's life.

                      The complaint number from Saturday are: 660, 718, 687c.

                      The Address : B-176/11, Faridabad.

                      Contact no. : [protected].
                      go to the folllowing link and lodge ur complaint here

                      http://202.56.120.172/elpsoftmis/WebPages/ConsumerInfoStart.aspx
                      go to the folllowing link and lodge ur complaint here

                      http://202.56.120.172/elpsoftmis/WebPages/ConsumerInfoStart.aspx
                      TO,
                      DHBVN
                      This is for your kind information that land lord of House No. 55A, Sector 11C, Faridabad (Haryana)- 121006 having very old model electrical energy meter and distributing electricity to their Tenant and a shopkeeper at commercial rates through advance model electronics submeter. It is also observe that electricity unit consume by Main meter (Land lord meter) is less than the sum of electricity unit consumed by two sub energ meter. (almost half the sum of two submeter unit consume). It is happening since long time. Land lord also having itself Two AC one cooler, One water pump motor, old model Bulb etc huge electricity consuming instrument.
                      Please first analyse their electricity bill of last few years and than take necessary action.
                      Helpful
                      Found this helpful?
                      3 Comments
                      Report
                      Copy

                      Post your Comment

                        I want to submit Complaint Positive Review Neutral Comment
                        code
                        By clicking Submit you agree to our Terms of Use
                        Submit
                        J
                        Jasjot Toor
                        from Delhi, Delhi
                        Jun 27, 2009
                        Resolved
                        Report
                        Copy
                        Resolved

                        I am a resident of South City-2, fromthe past few months, electricity been a very big problem. Firstly, power cuts are made without any notice. And, secod, power cuts are made of duration like 5 mins, 2 mins which cause a really big problem to all the residents to change up the power backup mode and everything.
                        please be advised to make planned power cuts and of proper duration so residents are not hit badly with the elecritcity condition.
                        i hereby from all the resident of south city-2 request you to see into the matter and help us out.
                        Aug 14, 2020
                        Complaint marked as Resolved 
                        Helpful
                        Found this helpful?
                        Write a comment
                        Report
                        Copy

                        Post your Comment

                          I want to submit Complaint Positive Review Neutral Comment
                          code
                          By clicking Submit you agree to our Terms of Use
                          Submit
                          S
                          Simi srinivash
                          from Delhi, Delhi
                          Jun 19, 2009
                          Resolved
                          Report
                          Copy
                          Resolved

                          The premises S 171 G[censored]ppal south end Gurgaon was vacant between July 2006 and Mar 2009. But still huge readings were taen and bills sent even though there was NO consumption

                          We were bac n Aprl 2009 and were shoced to see a bll of More than 1 LAkH rupees even though not a sngle unt was consumed between July 2006 and march 2009.

                          Pls. get this adressed as ether the bill s wrong or elec. s stolen when we were not around.
                          Aug 14, 2020
                          Complaint marked as Resolved 
                          Helpful
                          Found this helpful?
                          Write a comment
                          Report
                          Copy

                          Post your Comment

                            I want to submit Complaint Positive Review Neutral Comment
                            code
                            By clicking Submit you agree to our Terms of Use
                            Submit
                            1
                            1883
                            from Kolkata, West Bengal
                            Jun 18, 2009
                            Resolved
                            Report
                            Copy
                            Resolved

                            Dear Sir,

                            I am resident of House no. 1883, Sector 28, Faridabad. There is fluctuation in electric supply whole night we cannot sleep. The electric supply is not continuace even for five minutes it fluctuates and supply goes very high and cooler start flying and then immediately cooler sleeps. we have complaint many many time in the electric office in sector 28 office but there is no releif. Many a times our fridge, micro tv bulb and tubes are damaged due to fluctuation.

                            we are very much unhappy with this service we pay bill why we have to suffer lose like this. If department want cuts they can timely but not like this

                            please take action

                            regards

                            kamal kapoor
                            Aug 13, 2020
                            Complaint marked as Resolved 
                            Helpful
                            Found this helpful?
                            Write a comment
                            Report
                            Copy

                            Post your Comment

                              I want to submit Complaint Positive Review Neutral Comment
                              code
                              By clicking Submit you agree to our Terms of Use
                              Submit
                              G
                              GAURAV GUPTA
                              from Gurgaon, Haryana
                              Jun 2, 2009
                              Resolved
                              Report
                              Copy
                              Resolved

                              I paid my last bill on time before due date i.e.10/02/2009 at Indian Over Bank, Sec 11, YMCA FBD but on current month bill I am charged a late fee fine of Rs 35/- and on bill my last bill payment is posted on 13/02/2009.And I complain to IDGAH comp centre and submit the photocopy of current bill and previous month bill to cashier at Ist counter on 30/03/2009. I complain number in DHBVN Public Grievance CellSo Plze correct my bill as soon as possible and my complaint number is 911BMB But sorry to say still My Problem is not solved. So tell what is benefit to me to pay my before the time period. So Request you to plze solve my probem as soon as possible
                              Aug 14, 2020
                              Complaint marked as Resolved 
                              To,
                              The SDO,
                              DHBVN Ltd. Haryana
                              Sub division west, Faridabad
                              HAryana
                              Sub:- Excess Electric bill
                              Sir,
                              I am resident of H.no. 176A/30, Sharmik Vihar, Faridabad Haryana, It is stated that My Account No is AA-13-0746, in subDivision West Faridabad, I have submitted my all dues and there is no pending bill against me, The DHBVN has sent a bill of amount of Rs. 35758.00 against the bill reading 7407, While the actual reading in my residence Electric Meter is 611 today i.e. 09/10/2009, Please do the needful in favour.
                              My billing detail is under
                              Bill no 8709020, issue date 12/09/2009
                              A/C no AA-13-0746,
                              F12/ Sub Division- Faridabad,
                              K. N. No [protected]

                              Thanking You
                              OMPRAKASH BAIRWA
                              H.No 176/A, Sector 30 Sharmik Vihar Faridabad, Haryana
                              To,
                              The SDO,
                              DHBVN Ltd. Haryana
                              Sub division sauth, Faridabad
                              HAryana
                              Sub:- Excess Electric bill
                              Sir,
                              I am resident of H.no.1541, Rajeev nagar, Faridabad Haryana, It is stated that My Account No is BB21-0138, in subDivision Sauth Faridabad, I have submitted my all dues and there is no pending bill against me, The DHBVN has sent a bill of amount of Rs. 23437.00 against the bill reading 4629, While the actual reading in my residence Electric Meter is 62 today i.e. 11/09/2009, Please do the needful in favour.
                              My billing detail is under
                              Bill no 8724601, issue date 18/09/2009
                              A/C no, BB21-0138
                              F13/ mathura road Sub Division- Faridabad,
                              K. . No [protected]

                              Thanking You
                              Ramsaran yadav
                              H.No 1541 rajeev nagar dlf area Faridabad, Haryana
                              Helpful
                              Found this helpful?
                              2 Comments
                              Report
                              Copy

                              Post your Comment

                                I want to submit Complaint Positive Review Neutral Comment
                                code
                                By clicking Submit you agree to our Terms of Use
                                Submit
                                D
                                deepak doomra
                                from Mumbai, Maharashtra
                                May 21, 2009
                                Resolved
                                Report
                                Copy
                                Resolved

                                DHBVN-Faridabad (Electricity)

                                Dear Sir/Madam,

                                Sector-19 in Faridabad suffers unpredicted cuts and outages every summer. Yesterday evening (20 May 09) their was an outage at 21:30 hrs which could be restored temporarily today at 09:45 AM (outage lasting for almost 12 hours) in extreme summer. It again went off at 11:30 AM and has not returned till the time of writing this complaint. Their is no redressal to our problems and a sector has been converted worse...
                                Helpful
                                1 other people found this review helpful
                                1 found this helpful
                                43 Comments
                                Report
                                Copy
                                J
                                Jugan Prakash Sharma
                                from Mumbai, Maharashtra
                                May 12, 2009
                                Resolved
                                Report
                                Copy
                                Resolved

                                DHBVN: Faulty Electric Meter, Faridabad

                                Dear Sir,

                                This is brought to your notice that I forwarded my written complaint pertaining to the malfunctioning of electric meter in the month of Feb' 2009 under Acct No: DB11-0381, situated at C-18, Ground Floor Dayal Bagh, Faridabad and falls under the sub division F-13/Mathura Road, Faridabad, Haryana duly approved by SDO and handed over to Mr. Pradeep Yadav JE. According to their directions a inspection team visited...
                                Helpful
                                1 other people found this review helpful
                                1 found this helpful
                                29 Comments
                                Report
                                Copy
                                M
                                Mayank
                                from Kolkata, West Bengal
                                Apr 29, 2009
                                Resolved
                                Report
                                Copy
                                Resolved

                                In the month of April, I have been given a bill of Rs. 53, 243 as electricity bill. This bill includes CUR/SOP charges of Rs. 43, 889. I contacted the local person for my society and he started asking for money (Rs. 2000) to correct the bill.

                                Mayank Gera

                                [protected]
                                [protected]@yahoo.co.in
                                Aug 14, 2020
                                Complaint marked as Resolved 
                                TO,
                                THE HEAD QUATER
                                HARYANA

                                SUB: FOR COMPAINT THE TRANSFARMER OF RAJIV NAGAR NEAR SEC 18 OLD FARIDABAD (HR)

                                DEAR SIR/MADAM

                                AS PER ABOVE MENTION SUBJECT THE TRANSFARMER OF RAJIV NAGAR IS NOT WORKING PROPERLY NO BACK UP GIVEN FOR THE ALL HOUSES OF RAJIV NAGAR DUE TO COME CAPICITY OF TRANSFER THE MCB OF TRANSFARMER TRIP AND SOME TIME LINE WILL BE BURN/BREAK THEREFORE THE LIGHTS NOT COME MOST OF THE TIME SO PLEASE ARRANGE THE BIG CAPICITY TRANSFARMER FOR RAJIV NAGAR.
                                THANKS
                                YOUR CUSTOMER
                                MANOJ ARORA
                                street light placed at 248 saraswati vihar ggn is not working.
                                TO
                                M. D.
                                D.H.B.V.N
                                Respected Sir,
                                I am a consumer of meter no SC-11 327. The Electrical meter install in my house., diff active in the year 2009, I purchased a meter and deposited it in the office of city sub. div. Ch. Dadri on 24/04/2009 along with testing fees Rs. 75 but my meter as not so fare replace and billing is on average basic which is very hire. We are requested to get my meter replaced. I have visited in office sub. Divn. Ch. Dadri but they not talk us properly they use same time abuse language
                                thank you
                                your faithfully,
                                sandeep Chabbra
                                [protected], [protected]
                                Helpful
                                Found this helpful?
                                3 Comments
                                Report
                                Copy

                                Post your Comment

                                  I want to submit Complaint Positive Review Neutral Comment
                                  code
                                  By clicking Submit you agree to our Terms of Use
                                  Submit
                                  S
                                  Seemant Kalra
                                  from New Delhi, Delhi
                                  Apr 10, 2009
                                  Resolved
                                  Report
                                  Copy
                                  Resolved

                                  Property Address: House number 362, Sector 40

                                  Account Number : 5D12 - 0152
                                  K.No: [protected]

                                  1) A payment amounting to Rs 11104.00 was made on 25/09/2008 with reference number as G26GD120152 which is not reflecting on this account. Please find this payment out and add to our account.
                                  2) The property was closed form last one year approximately and thus provisional billing was sent on the basis of previous consumption.
                                  3) Now the property is open, When the meter reader visited the property the meter was found to be slightly burned and thus was taken away by him.
                                  4) Please correct the bill according to the last reading on the burnt meter, recalculate the bill and advise of the refund amount.
                                  5) Once the bill is recalculated on the actual consumption, we will apply for new meter to be installed at the above said property.
                                  6) We visited the Kanhai gaon branch and was promised that this will be taken care of, however is still not done and the account is shoeing outstanding balance of more than eight thousand rupees which is incorrect.

                                  Please recalculate the bill on the basis of actual consumption, add the payment of 11104.00 made on this account and advise of the final bill as soon as possible.

                                  Please provide the grievance number for this complaint.

                                  Thanks
                                  Seemant Kalra
                                  On behlaf of Girish Anand.
                                  362/40 Gurgaon.
                                  Aug 14, 2020
                                  Complaint marked as Resolved 
                                  Add:- 125 Gali-5 Sastri Nagar Pall-I Shehat pur FBD
                                  A/C No- DT01-1026
                                  K.No- [protected]
                                  Bill No[protected]

                                  i have got 274 Unit and old unit is 97
                                  this is the bill of 03.02.2010
                                  but my meter say's that the total unit in 24.02.2010
                                  is 371 only how they give me the bill of this type they dont take reading in that month.

                                  i want to say that plz suggest me somthing what can i do
                                  they give me bill of 03.02.2010 in 24.02.2010
                                  where is they are in the rest time. and the last date is 26.02.2010
                                  they give me only one day.
                                  Helpful
                                  Found this helpful?
                                  1 Comment
                                  Report
                                  Copy

                                  Post your Comment

                                    I want to submit Complaint Positive Review Neutral Comment
                                    code
                                    By clicking Submit you agree to our Terms of Use
                                    Submit
                                    S
                                    snitu13
                                    from Gurgaon, Haryana
                                    Mar 8, 2009
                                    Resolved
                                    Report
                                    Copy
                                    Resolved

                                    I am a resident of South City 1 in Gurgaon. This month's bill, the last date is 14th March, I went to Bill Counter on 7th March. There it was clearly written that it accepts Cash also. My bill was even less than Rs 1000. The Cashier/Clerk refused to accept my bill, saying that he will accept only cheque today! He said, it is simply inconvenient for him to take cash. He was simply not feeling like accepting cash, which is ridiculous.

                                    My complaint is about the procedure here? How can the person refuse to accept the bill. It is nothing but creating mistrust and inconvenience to consumers. It was his job, duty and responsibility to accept the bill in whatever form (cash or cheque) consumer is comfortable. This bill counter is in Sec 31 Market, Gurgaon.
                                    Hopefully, this matter would be taken care and the process would be improved to build more trust and flexibility between the DHBVNL and its consumers.
                                    Aug 13, 2020
                                    Complaint marked as Resolved 
                                    Dear Sir/Madam,


                                    I have seen the hole instruction printed on bill of electricity, gurgaon which where prepaid by DHBVNL. I wanted to submit the amount by cheque, but we don't have the party Name mentioned on the bill. That should be the part of instruction.

                                    Nitin Dwivedi
                                    [protected]
                                    i want to pay this bill through cheque...to whom name cheque will be make.
                                    shuld i give the pdc cheque of date 25 jan as the last date is 26 jan
                                    kindly inform
                                    WHOSE RESPONSIBLITY IF THE MATER IS ON THE ROAD?NATURALLY THE ELECTRICITY DEPARTMENT, THE DHBVNL.
                                    I had applied to get my electric Meter to be put on a height where I can see & check the reading, but one month has passed inspite of my request to shift the meter down below on the pole i sector - !0A, Gurgaon, But no response.

                                    Narender = [protected]
                                    Helpful
                                    Found this helpful?
                                    4 Comments
                                    Report
                                    Copy

                                    Post your Comment

                                      I want to submit Complaint Positive Review Neutral Comment
                                      code
                                      By clicking Submit you agree to our Terms of Use
                                      Submit