Claimed

Omaxe Complaints & Reviews

1.6
Updated: Oct 3, 2025
Complaints 327
Resolved
103
Unresolved
224
Contacts

File a complaint to Omaxe

Having problems with Omaxe?

File a complaint and get it resolved by Omaxe customer care. It’s quick, effective and absolutely free!

SUBMIT A COMPLAINT

Omaxe reviews & complaints page 16

Newest
  • Newest
  • Most Helpful
  • Most Popular
  • Resolved
  • Contains Photos or Videos
  • Oldest
V
vijay kumar
Mar 10, 2010
Resolved
Report
Copy
Resolved

Dear Sir,

I was booked a flat with Omaxe and due to breach of the aggrement by Omaxe I cancel my booking and demand for my booking amount returning.

Till now menas after passing 8 month he is only giving the promise and not returning the money.

Sir, could you please guide me what to do to receive my booking amount.

Your suggestion will be appreciated.

Thanks
Vijay
Aug 14, 2020
Complaint marked as Resolved 
Helpful
Found this helpful?
Write a comment
Report
Copy

Post your Comment

    I want to submit Complaint Positive Review Neutral Comment
    code
    By clicking Submit you agree to our Terms of Use
    Submit
    V
    vijay kumar
    Mar 10, 2010
    Resolved
    Report
    Copy
    Resolved

    Dear Sir
    I was booked a flat in faridabad "Omaxe New height" Sector -78 with booking amount of Rs.2.5 lacks and as per the agreement with the Omaxe, the Omaxe will give me the agreement paper after 2 weeks only. But after passing 3 weeks he do not give me any paper and demand for the next installment. I tell him that first you give me the agreement paper of the booked flat and after that I am ready to give you the next installment. But he was not ready to do so and therefore I request him to cancel my flat booking and return the booking amount.
    Till now after passing 8 month he do not returned my booking amount and in response always telling me that the returning is in process.
    In the mean time I gave him the affidavit and original receipt of the booking amount as required by omaxe in hoax promise with me to return the booking amount.
    Presently in back-up I have only booking amount Xerox receipt and the bank check copy with signature of receiving the amount by omaxe.

    Sir, could you please guide me what I will do with omaxe so that I will receive my booking amount.
    Your all possible suggestion will be appreciated.

    Thanks
    Vijay
    Aug 14, 2020
    Complaint marked as Resolved 
    Helpful
    Found this helpful?
    Write a comment
    Report
    Copy

    Post your Comment

      I want to submit Complaint Positive Review Neutral Comment
      code
      By clicking Submit you agree to our Terms of Use
      Submit
      D
      D
      from Pune, Maharashtra
      Mar 6, 2010
      Report
      Copy

      Hi Vipul,

      Please join grandwoods.in.

      Its is a forum of all fellow Flat Owners in Greenwoods, Noida. Maybe, anybody out of them can help you out.

      Regards,
      Dipesh
      dear Brother,
      Go ther in court. I AM FACING SAME PROBLEM WITH OMAXE. Both o[censored]s can go there in consumer court, there is no option except above mentioned. Please sen me your contact no then We ll meet to eficient advocate and go ahead.
      I look forward to your early reply.
      Thanks
      Sunil
      otherwise we can sit for hunger strike and call to media and expose them (omaxe builder). They are cheating to poor people. We should raise our voice ther in consumer court and parliament house.
      Sunil bhai I am also a victim of omaxe.how do contact each other?
      did u get any latest infor, mation, pls tell me otherwise we ll meet and do the hunger strike. pls send me ur contact number i ll call u and talk to u.
      reply dena as soon as possible.
      bye
      sunil
      dear mr zeyauddin,
      or u can send me ur email id. wtg 4 u.
      sunil
      Helpful
      Found this helpful?
      5 Comments
      Report
      Copy

      Post your Comment

        I want to submit Complaint Positive Review Neutral Comment
        code
        By clicking Submit you agree to our Terms of Use
        Submit
        R
        rajeev singh
        Mar 4, 2010
        Report
        Copy

        Non Proper Service of DTC bus at route No. 764
        I am a resident of Nazafgarh , Delhi. Since last three months we are facing a very big transportation problem from this area. The DTC Route No.764 buses are not available in the morning time (from 8am to 10 am) whcih results the commuters couldn't reach office in time. After several complaints to the DTC complaints cell there is no action has been taken till date to solve this problem. The depot incharge is also not doing anything in these route. He doesn't bother to hear the commuters complaints. We also doubts that he or the drivers are taking bribe from Blueline bus owners & playing game with public. But from last three days we are unable to get the AC buses also and at first the difference of time between the two buses were 20 minutes gap as told to us by the conductor but last three days we are getting the buses after 45 to 50 minutes differences . and talking to the DTC authorities on their telephone no they are giving different numbers to contact for the further complint .You are requested to kindly look into the matter & do the needful for the proper services 764 bus routes on time.
        Hoping for the solution at the earliest.

        thanking you.

        DTC — routes not followed

        Non - compliance of bus route by bus no. DL1P C 7709 (route 770 A ) as on 22 august , 2011 @ 330 pm

        the above said bus was supposed to enter palam village when coming from Dwarka but the driver just avoided that route . we followed the bus by own bike n stopped the bus after the palam railway stn . bus stand by stopping the bike in front of bus in the middle of road. when we boarded the bus n asked the driver why he didnt follow the route. he gave a very rude answer that its his own wish , he will take the bus from wherever he wants. we also asked for the complaint book from the on duty conductor , for which he refused and said that he doesnt have one.
        as every one knows that each DTC bus has a complaint book , also they are supposed to follow the proper routes. this behaviour of the on duty driver & conductor was very un-social . strict actions should be taken against them so that others shall follow the routes properly.
        Helpful
        Found this helpful?
        1 Comment
        Report
        Copy

        Post your Comment

          I want to submit Complaint Positive Review Neutral Comment
          code
          By clicking Submit you agree to our Terms of Use
          Submit
          N
          Nidhi Saxena
          from Chennai, Tamil Nadu
          Jan 6, 2010
          Resolved
          Report
          Copy
          Resolved

          I have booked one three bed rm flat in omaxe Chocolate Palm green Sector - Mu, Greater Noida. I want to cancel the booking, but the company is not refunding the money. I have been trying for it for past one year, but the company is not accepting my application for the cancellation.
          Aug 14, 2020
          Complaint marked as Resolved 
          Complaint against Omaxe Palm Greens, Greater Noida – refund demanded
          December 27, 2010
          By rajinder.singh
          I would like to bring to your kind notice harassment through which I am going through due to Omaxe Builder.

          1. In 2006, I booked an apartment with M/s Omaxe Buildhome Pvt. Ltd., and till now have made payment of Rs. 29, 84, 828/- without any delay in installment.

          2. In 2007, I was allotted Flat No. 202, in Tower Peach Palm A, 2nd floor in Palm Greens project in Sector MU, Greater Noida, vide Allotment Letter dated 21/09/2007, having reference no. OBPL/COMM/MU/GN/584

          3. I have been paying Omaxe regularly, without delay even during recession and have paid approx 30 L till noe.

          4. Even after 4 years, I am surprised to see that still not even structure of towers are ready. It has been 4 years since that flat was booked and till date, the company has not been able to erect even the structure of apartments.

          5. At the time of booking of this project and in Builder Buyer Agreement, the project size mentioned is 50 Acre. But Omaxe reduced the size of plot drastically by more than 50% to only 23 Acres, without even informing their customers.

          6. After reducing size of the project, Omaxe added future projection towers in between the under construction towers, making the overall project too cluttered with buildings. Omaxe also reduced Project features in the new layout thus reducing it from 16 features to only 8 features. What was supposed to be the USP of this project, is no where in the new layout.

          7. The builder is also forcing me to sign the Builder Buyer Agreement of 50 Acre, which I believe, is drafted very heavily in Builder’s favour. I have registered my protest against this with various officials but nothing has been done in this regards.

          8. I have written several mails to them, visited their office many times and wasted complete day just to discuss my case with the concerned person. I gave them option to switch me to any other ready to move project and I will pay the differential amount right now. But non one listens to my request.

          9. Omaxe has now come up with Orchid project in same area, where in cost of the project is further deuced and is all inclusive of parking, club facility etc, for which I am being charged in tune of 7 L approx. Since this project has kicked off, means Plam greens project wil be further delayed.

          With support of your services and in the light of the aforementioned facts, and that the builder is not doing construction to complete this already delayed project, I request you to take appropriate actions against the builder and help me in complete refund along with interest.

          Rajinder Singh
          195, Tarun Enclave, Pitampura, Delhi
          Email: rajinder.[protected]@gmail.com
          Contact No.: [protected], [protected]


          Related posts:

          Complaint against Omaxe palm greens greater noida for non refund of money
          Refund of Money deposited in Omaxe Palm Green Project in Gr Noida
          Complaint against Omaxe Ltd for refusal to refund booking money
          Complaint against Omaxe – Omaxe Ltd delays refund of booking money
          Omaxe delays refund
          Tags: Complaint against builders, Omaxe

          3 Responses to “ Complaint against Omaxe Palm Greens, Greater Noida – refund demanded ”

          K.Kumar on December 31, 2010 at 1:19 pm
          I am also in the same boat. Deposited all their demands and now they say they want to shift me to another tower. I am prepared to join together to fight this injustice.I am asking for refund of my money but to no avail.

          Best rgds
          K. Kumar
          [protected]


          Deepak Garg on December 31, 2010 at 4:32 pm
          I have similar experience with this builder having invested in the same project. I never expected this from a reputed company whose chairman is the President of National Real Estate Development Council (Naredco.

          I have paid Rs. 21, 00, 000 so far. It is a hard earned money and it pains to see this being in the grabs of an affluent builder.

          This company has no customer ethics. They do not pick-up calls, would not keep promises to call back, will arise voice at their customers, will deny saying things they ahve said. I have all the details of email communications with them. Unfortunately, no details of telephone communications due to obvious techinical reasons, which could exposed their appalling behaviour with customers.

          I fully support Mr Singh’s complaint and hopefullly it brings justice to us.


          Yashwant K Singh on January 13, 2011 at 1:11 pm
          I am having the same problem.

          Had booked 4 bhk in Gold Palm -B. Paid booking amount 1.5 years ago.
          Now The building is not going to be constructed. Instead ORCHID will come up there. This all being done without our notice.While on phone they are telling that they are starting construction in a few days!

          Let us get together. Higher a known Lawyer who is really known or relative of some one known. I am ready to contribute money for the fees. Let us get our money back. This project is in mess. And perhaps
          will take another 5 years to get delivered. They are just cheating us!

          Yashwant Singh
          [protected]@superpartners.com.au
          (I am resident in Australia)
          Complaint against Omaxe Ltd for refusal to refund booking money
          March 12, 2010
          By vivek tyagi
          I had booked a 3 BR flat with Omaxe North Avenue II at bahadurgarh and paid an amount of Rs 2, 80, 000.00 towards booking amount for the said flat whose ref no. is OL/3BR/BHF/P/569. I had got a bank loan approved for the same but after my loan got approved and the bank asked for various documents from the builder, Omaxe ltd. kept dragging the amtter but did not provide the loan and finally after checking with the bank, i came to know that In 2009 I came to know that the Omaxe had scrapped the plan for construction of 3BR towers. after this I started asking the builder for the details of the project through various wrriten and verbal communications but they kept delaying teh matter on one or the other pretext but did not provide me with any concrete details. After waiting for long for company’s response, i decide to take a withdrawal of my booking amount and applied for a refund.

          Now, after about a year of application for refund, the company fails to give any response on the same and is also denying to make any refund. Since I am in need of the money urgently to support my old parents and my family, with the help of my legal advisor, I have sent three legal notices to the company for refund of money. Till date, the company is not responding to any of my communications and on the refund money, which clearly shows their wrongful intentions of dishonestly misappropriating the booking money and convert the said money for their own use. I request to the members of the forum to support me in getting the refund amount back from Omaxe ltd., if possible.

          Vivek Tyagi
          Location: Satya Niketan, New Delhi-110021
          Email: [protected]@rediffmail.com
          Complaint against Omaxe – Omaxe Ltd delays refund of booking money
          December 21, 2009
          By Yogesh Srivastava
          I had paid Rs 300, 000(Rs Three lacs Only) towards pre-booking amount of flat for Omaxe’s Ajmer Road, Jaipur project thru second purchase from Mr. Vishal Gupta vide receipt No 7700088 dt 27/06/2006. The title & assignment was duly registered by Omaxe in my & my wife Mrs RUCHIRA SRIVASTAVA’s name. The builder did not even acquire land for the project. On enquiry about status of project Omaxe employee’s always gave false assurance of project getting started soon.

          Fed up with their lies, finally on 12/03/2009, I applied for refund of money alongwith interest and deposited all necessary documents alongwith original receipt. So far neither Omaxe has refunded money nor any satisfactory reply is given by their employees. On telephonic enquiry they say that Company does not have money and as & when Company has money- refund will be processed. I complained at their web-site twice but nothing happened. On calling telephonically at their H.O- Delhi- line is put on hold for long.

          Despite mails to Mr. Rohtas Goel, Sunil Goel MD & ED- no response from company.

          YOGESH CHANDRA SRIVASTAVA
          Location: GOMTI NAGAR, LUCKNOW
          Email: [protected]@sify.com
          Omaxe refuses to refund money on Omaxe Heights, Bhiwadi project
          July 11, 2010
          By r.k.dua
          I invested in project “Omaxe Heights (G+9) at Bhiwadi” in 2006, paid Rs2, 50, 000.00 as advance registration amount in 2006, receipt# 55002882 dated 9th June 2006.

          Paid second installment of Rs1, 32, 950.00 receipt# 309866 dated 27th May 2008 against the allotment letter of flat No. 305, Tower Carnation A, in Residential Township Project “Omaxe Heights (G+9) at Bhiwadi” dated 29th April 2008.

          I was alloted flat No. 305, Tower Carnation A, in Residential Township Project “Omaxe Heights (G+9) at Bhiwadi” on 29th April 2008 and post that no communication on further status to till date.”

          But there is no progress in project till date and there is nothing on ground for that project, the project is inconclusive and appear to be abundant till date. As on date because of extra ordinary delay I am not in position to cope up further with this unreliable company. Hence I requested them to refund my money. In response to my refund request, they don’t respond to my emails and also they made me visit multiple times to there Head Office in Kalkaji, New Delhi and to add on to my suffering they don’t behave properly to a Senior Citizen.

          To add to my irony, the refund formalities they have given to me are not as per the realty of there extraordinary delay but are actually required for the cancellation of allotment in case the customer is at fault which is not the case here.

          I am Senior citizen and Heart patient and cannot follow up any more as I was doing in past. Hence I request ICF body to help me in getting refund of my investment with interest from this fraudulent company. With due regards it is to submit that I shall be greatful if given a chance to present myself with complete records available with me to the competent authority in NCR region.

          R.K. Dua
          Gurgaon – 122001, Haryana
          Email: raj.[protected]@yahoo.com
          Contact No.: [protected]
          Omaxe Heights Cheating
          April 6, 2010
          By rajeev.sharma
          1. Omaxe, vide letter dated 23 Mar 10, has intimated that instalment number 11 of Rs 2, 38, 562.50 is due on 08 Apr 10 for Omaxe Heights, Faridabad.

          2. As per Agreement, instalment number 11 was to be paid only on completion of Flooring. However, during my visit to the above mentioned site on 21 Mar 10, I found that Flooring work has not started. Further, internal plaster has also not been completed, which was linked with completion of instalment number 10.

          3. Also, marketing representative at Omaxe Heights was very pessimistic about the progress. He did not arrange the site visit and told me to speak with the security guard to take me around; while he was reclining in the Sofa. I had to plead repeatedly for the site visit and only after major altercation, I was successful in visiting the work-site. Also, I observed that the pace of work at the site was very slow and hardly any manpower was being employed. This proves that the Project is heading towards further time-overruns, and Omaxe is totally non-committal.

          4. In view of the above, I am doubtful of the progress of the Project.

          5. I requested Omaxe to provide me proof of completion of Flooring to enable me to make the payment linked with this stage of completion. However, the same has not been provided.

          In these circumstances, I should not be responsible for any delay in payment and associated interest.

          Rajeev Sharma
          Location: Delhi
          Email: [protected]@yahoo.com
          Helpful
          Found this helpful?
          1 Comment
          Report
          Copy

          Post your Comment

            I want to submit Complaint Positive Review Neutral Comment
            code
            By clicking Submit you agree to our Terms of Use
            Submit
            P
            parnita
            Dec 31, 2009
            Report
            Copy

            I deposited 10 lacs as a booking amount for a flat in the prelaunch of sec 112 in noida in may2007.
            The company could not get appropriate permissions from the govt and had to scrape the project. But they are not making us any refund of that money. I have been calling them almost everyday and they are just making excuses. I live in california. Is there any higher authority who I can complain against them.
            Thanks
            Helpful
            Found this helpful?
            Write a comment
            Report
            Copy

            Post your Comment

              I want to submit Complaint Positive Review Neutral Comment
              code
              By clicking Submit you agree to our Terms of Use
              Submit
              P
              Piyush
              Dec 8, 2009
              Resolved
              Report
              Copy
              Resolved

              Hello,

              I had made a booking with Omaxe Ltd. in May 2007 for a flat that was to be provided in 2.5 years Earlier this year, Omaxe executives started approaching with plans to move the booking to some other project as the original project was getting delayed.
              By April 2009, it was acknowledged that Omaxe does not have the necessary approvals to go ahead with the project. But when I approached them for refund, they are not willing to entertain any request for refunds.
              After lots of escalations, was able to submit the request for refund but it has been 3 months and still there is no sign of my refund. Once again, they are not responding to emails as well.

              Any idea, how should one proceed?

              Thanks,
              Piyush
              Aug 14, 2020
              Complaint marked as Resolved 
              which complex

              delayed possession of flat

              I have booked a flat in omaxe city rohtak which was supposed to be conmpleted by november 2012 but it is still under construction also all the installments have been paid by me to the omaxe.
              flat no.- 408 SF
              Omaxe City Rohtak
              Helpful
              Found this helpful?
              2 Comments
              Report
              Copy

              Post your Comment

                I want to submit Complaint Positive Review Neutral Comment
                code
                By clicking Submit you agree to our Terms of Use
                Submit
                M
                Mahendra
                from Chandigarh, Chandigarh
                Dec 5, 2009
                Report
                Copy

                I have booked a flat in the project named omaxe heights, gomti nagar, lucknow. following complaints are
                submitted but no action has been taken .

                1. The super area booked was 1532 sq ft but now they are asking money for 1577 sq ft super area even the flat build up area is not increased by even a feet.

                2. The building is not constructed as per national building code 2005

                3. They promised piped gas line now they not providing it & not reducing any money for above.

                4. They promised POP cornices in all rooms but they are not providing it neither they are reducing money
                for the same.
                5. They are not providing the construction delay compensation as agreed in there agreement clause 27(d)

                6. They are not providing covered parking for next 6 months after possession but they are charging for the
                same now.
                7. The behavior of Lucknow commercial manager Mr. Kishore Goel is very rude & non cooperative
                I have also booked a flat in Omaxe Heights Lucknow. The possession date has already been extended 3-4 times and as of now, the possession date that they are telling is March, 2010. I request people who have booked flats in Omaxe heights to come forward through this thread and form an association because only then will we be able to convey our views in a stronger voice and ask for the facilities that had been promised to us when we booked the flats. It would be very difficult for us to put any sort of pressure on Omaxe individually.
                I agree with you. The project is delayed by 20 months. Many promises have not been fulfilled beside asking extra money for increased super area and other charges. We have tao take up these issues collectively with the builder. Please provide your contact no.
                Hi, I also got the letter from Omaxe on possession. Following are some remarks.
                a) for 3 BHK, they said the actual area is increased by 40-50 odd sq feet, which is verifiable at the time of posession, before that. I read the Papers/sell Terms and conditions and it states that actual area might vary at final possession... so we can't do much.. infact this is a standard clause in most builder apts... and i find it logical, as one can never make a flat right to last digit.. on 1500 sq foot, 50 represents 3% variation... so no complaints

                b) can somebody highlight on national building law and omaxe agreement to it's compliance... is it "must" for all buildings... what are the benefits/ issues

                c) Does lucknow already have piped gas? Is piped gas pipeline coming to individual flats.. was this promised in our contract?

                d) construction delay compensation is subject to 30 months post buying (not flat construction start) and builder getting 6 months grace period... in my case, no additional rentla compensation.. i bought in Jan 2007

                e) Can you provide more details on car park part...
                i too have a flat in omaxe heights. yes i agree to fight for our rights. they are delaying the project. we must do something
                30 days starts from signing of agreement as per cluse 27 a.What is 30 month post buying.6 month grace period will be given provided condition mentioned in 27 (b) exists.In this case none of the condition omaxe can claim that existed.How this sudden increase in area? Why they did not inform earlier.I think this is time to unite and fight the case unitedly.Such injustice can not be tolerated.This is cheating.They also promised in house club, swimming pool and wave pool.tennis court, basket ball court, community hall.squash court, steam room, gym etc, they are asking for cover parking what is status of all these facility, can any one comment.
                THIS MUST BE REDUCED BY OMAXE AS PER LAW AND ALLOTMENT LETTER
                What can we do against this ???? Guys... we need to find a solution. I have also booked a Flat there.
                Omaxe Height Lucknow is taking single point electric supply at 11 kv.Those who are from UPPCL how can take supply because deparmental consmer takes unmetered supply&bill are paid through salary.It is advised to omaxe please another 63 kva transformer from which all LT connection will be given to UPPCL EMPLOYEE.Hence problum will be solved.All concened employee are requested to touch with with me.

                DC DIXIT
                MO.[protected]
                Thank God, I was trying to gather information about the Omaxe heights constructions..but seems like they are not the right people to go with...thanks a lot to all of you for posting your concerns that will definitely save a lot other sufferings...
                My son has also booked a flat in millenium tower in Gomtinagar in year 2005.The flat was promised to be handed over in 30 months.For last two years they are intimating on query of readiness in coming month and now they have stopped replying totally.As per agreement they have promised to pay for delays.Now denial of interest payment is gross violation and there is need to form a joint forum for redres80967al.

                OMAXE HEIGHTS GOMTI NAGAR LUCKNOW — PENALTY FOR DELAY IN CONSTRUCTION

                WHY OMAXE HEIGHTS IS NOT PAYING PENALTY CLAUSE(27D) MONEY TO ME.THEY HAVE PAID TO PARQUE 202.

                D C DIXIT
                703,PARQUE TOWER,OMAXE HEIGHTS
                VIBHUTI KHAND, GOMTI NAGAR
                LUCKNOW.
                MOBILE NO.[protected]
                They are treating flat buyers in smaller cities very badly, same is in Omaxe Executive Homez, Ajmer Road, Jaipur. Nearly one year after possession they have made no provision for transfer of electric connection in name of home buyers, they have not given expense breakup to RWA so that maintenance charges can be ratified. They are just adding electricity bill to maintenance bill instead of providing electricity bill separately so that we can pay direct to Vidyut Nigam. This way they will simply disconnect electricity if we don't pay maintenance to Shanvi. Shanvi Estate is the nodal maintenance agency everywhere for all their projects whether it is Omaxe The Lake, New Chandigarh or Omaxe The Resort, New Chandigarh, or for India Trade Center, Greater Noida or for Omaxe Full Moon at Vrindavan. Same lousy management at all projects.
                Helpful
                Found this helpful?
                12 Comments
                Report
                Copy

                Post your Comment

                  I want to submit Complaint Positive Review Neutral Comment
                  code
                  By clicking Submit you agree to our Terms of Use
                  Submit
                  S
                  sanjay chhabra
                  from Adampur, Punjab
                  Nov 14, 2009
                  Resolved
                  Report
                  Copy
                  Resolved

                  sir, i purchased a showroom in the wedding mall patiala punjab from omaxe ltd.,they promised me for regularly monthely income for nine years. but now since two months they stopped my monthely return after fitout period .i called many times to their office bearers but they didnot any satisfectory answer,sir ,please help me to regulise the monthly return
                  thanks
                  sanjay chhabra
                  chairman hansali buildwell pvt.ltd
                  c/o chhabra hospital satnam pura
                  phagwara punjab
                  ph.[protected],[protected]
                  Aug 14, 2020
                  Complaint marked as Resolved 
                  Helpful
                  Found this helpful?
                  Write a comment
                  Report
                  Copy

                  Post your Comment

                    I want to submit Complaint Positive Review Neutral Comment
                    code
                    By clicking Submit you agree to our Terms of Use
                    Submit
                    A
                    Anuj Tyagi
                    from Anand, Gujarat
                    Oct 11, 2009
                    Resolved
                    Report
                    Copy
                    Resolved

                    I had booked a Flat with Omaxe as per details below:

                    Name of Scheme: "Omaxe Parkwood" Baddi, Himachal Pradesh

                    Name : Anuj Tyagi S/o Sh. Sehdev Tyagi
                    Unit No. 321 Block : Jacaranda-B
                    Area : 66.24 Sq.Mtr

                    Date of Agreement: 27th August 2007.

                    I have paid approx. 90% of the total value i.e. Rs. 8,15,000/- on 3rd September 2007.
                    Company was supposed to complete the construction of above said property within 18 months from the date of agreement.

                    It is very shocking to learn that till date the construction work for above property has not even started and I am paying a monthly interest of Rs. 16,000/- to the bank for no fault of mine.

                    Repeated requests to the builder have failed to draw any conclusion or information.

                    KINDLY HELP!!!!
                    Aug 14, 2020
                    Complaint marked as Resolved 

                    Omaxe Limited — no shares issued neither any refunds of ipo

                    Ref:- Omaxe Applicaton No.[protected]

                    I invested in Omaxe IPO but no shares were issued in my name and I didn't received any refund cheque or through direct ECS of amount invested to my account. Its near to three months that i invested

                    Omaxe Limited — Non refund of IPO

                    Application no. 13619457
                    bid qty 20
                    Amount Paid 6200


                    Transaction Id of ICICI direct .com (online Application) 3674595
                    Same status is with me. Can't we take some leagal action against the OMAXE.
                    same with me :-(, I am filling consumer complaint now .
                    Same with me, I am waiting fro my flat for almost 6 years still no sign :-(
                    Same with me. Yes Mohit and all other members, we shall take the case to the court jointly. I have been visiting omaxe since last 3 years without any success. My email ID is [protected]@gmail.com. Let us come together and take action.
                    Helpful
                    Found this helpful?
                    6 Comments
                    Report
                    Copy

                    Post your Comment

                      I want to submit Complaint Positive Review Neutral Comment
                      code
                      By clicking Submit you agree to our Terms of Use
                      Submit
                      S
                      sumit aneja
                      Aug 8, 2009
                      Resolved
                      Report
                      Copy
                      Resolved

                      BEFORE THE DISTRICT CONSUMER DISPUTES REDRESSAL FORUM - X
                      MEHRAULI, NEW DELHI
                      IN RE:

                      SHRI SUMIT ANEJA ...COMPLAINANT

                      VERSUS

                      M/S OMAXE CONSTRUCTION LIMITED ...OPPOSITE PARTY


                      Written submissions on behalf of complainant

                      1. That the complaint on the basis of the advertisement, catalogue / brochure and the web site of the opposite party company applied for a shop having area 240 sq. ft. at the rate of 3950 per sq. ft. with a total - tentative cost of Rs. 94, 8000/- in their project Omaxe Arcade, Greater Noida Distt. Gautam Budh Nagar, U. P. through their authorized dealer vide his application dated 30.03.2003. The opposite made a demand of 10% amount of the price of. the said shop as the booking amount. As per their demand the complainant paid Rs. 94, 8000/- (Rs. Ninety four thousand eight hundred only) vide the cheque no. 690312, the receipt of which was duly acknowledged by the opposite party vide its receipt no. 3277 dated 01.04.2003.The copy of the receipt has been exhibited as Ex.-C1.

                      2. That subsequently the opposite party issued 'ALLOTMENT CUM CALL LETTER' dated 06.06.2003 along with the Price List and the Payment Plan and demanded another installment of Rs. 94, 800/- (Rs. Ninety four thousand eight hundred only). The copy of the allotment letter along with the Price List and the Payment Letter has been exhibited as Ex.-C 2. As per their demand I paid Rs. 94, 800/- (Rs. Ninety four thousand eight hundred only) vide cheque no. 690316, the receipt of the payment had been duly acknowledge vide receipt no. 4266 dated 28.06.2003. The copy of the receipt has been exhibited as Ex. - C 3.

                      3. That as per the agreement dated 01.09.2003 which contained the terms and conditions of the allotment. The payment plan envisaged in the terms and conditions of the said agreement for which the complainant had opted for, was the Plan B where by the complainant had to pay the construction linked interest free installments as per the completion of different phases of construction with in the said premises. The copy of said terms and conditions has been exhibited as Ex. - C 4. Before submitting the application by the complainant he was informed by the opposite party that the prices are inclusive of external development charges, common facilities charges. Further the prices are firm/escalation free and the complex/Omaxe Arcade . where the shop has been booked is AC block.
                      The complainant had opted construction linked payment plan.

                      The booking of the said shop was done as per the advertisement in 'the Web Site and through the dealer of the O.P. and it was clearly mentioned in the Web Site that the prices quoted for the shop were of AC Block. The print of this Web page has been exhibited as Ex -C5.

                      4. That the actual area of the said shop had been app. 150 sq. ft. whereas as per the plan the opposite party had been charging for the super area of app. 240 sq. ft. Therefore, as the complainant had been paying for the development in the complex for the super area, he had been concerned with the constructional developments in and around his shop for the purpose of making the payment of the construction linked installments. as per the clause 2A of the Agreement dated 01.09.2003, it is clearly mentioned that the shop no.14 (U.G.) having a basis cost of Rs. 9, 48, 000/- is having appox. Super Area of 240 sq. feet which includes the covered area including walls, cupboards, window projections, balconies, plus area under common passage, stair case and mumtty etc. i.e. it is the Super Area.

                      It is pertinent to mention here that had the complainant been concerned with internal development of shop only, he would have made to pay only for the inner area of the shop only which has been appox. 150 sq. feet only. But as per the Agreement, the liability of the complainant w.r.t. the deal has been fixed for appox. 240 sq. feet, i.e. to say that it is the Super Area for which the complainant is making the payment. Therefore, the liability of the complainant, as per Agreement should have been related to the construction and development of the Super Area.

                      5. That it is pertinent to mention here that from time to time, the opposite party kept on demanding the installments which the complainant in the good faith paid initially. Later on when the complainant visited the site, he was shocking surprised to find that the phase of construction which the installment had been demanded by the opposite party either has not been completed or some times rather it had not started yet. When the complainant pointed out this fact to the site party, they on sudden occasions issued the fresh payment plan.

                      The opposite party had been regularly following the malpractice of demanding the construction linked installments without completing the said construction, which is quite evident from the fact that the O.P. had generated a demand letter dated 16.12-2004 on account of 3 installments for which the construction had yet to be completed, as per the details given below:-


                      1. On completion of flooring = RS 94800
                      2. On completion of internal plaster =RS 94800
                      3. On completion of internal electric and
                      Plumbing works =RS 71000
                      Total Rs. 2, 60, 700/-
                      The copy of the said demand letter is exhibited as Ex - C6.

                      When the complainant visited the site, it was found that the work of flooring and electric / plumbing work had not been completed and mails dated 18.12.2004 and 30.12.2004 had been sent to the opposite party. The copy of the said mails have been exhibited as Ex - C7 & C8. In response to the said mail, the O.P. had sent a revised demand letter dated 03.01.2005 and as per that the following demands had been made:-

                      1. Internal plaster = Rs. 94800
                      2. Internal electric / plumbing works = Rs. 94800
                      3. External finish = Rs 71000

                      Total = Rs. 2, 60, 700/-

                      The copy of the said demand letter has been exhibited as Ex - C9.
                      Again on 05.01.2005 the O.P. had sent another demand letter vide e-mail wherein it had been informed that only two installments amounting to Rs. 1, 89, 600/- were due for the works mentioned here den-
                      Internal plaster = RS 94800
                      Internal electric / plumbing works = RS 94800
                      Total = RS 1, 89, 600/-

                      The copy of the said demand letter has been exhibited as Ex - C10.

                      On receipt of the demand letter dated 05.01.2005, again the complainant visited the site on 09.01.2005 and found that electric work had not been completed and rather the plumbing work had not yet being started which was duly confirmed by the site supervisor Shri Arun for the reason that the location plan of the toilets etc. had been reallocated. An e-mail with regard to this had been sent to the O.P. on 10.01.2005, mentioning all these facts and request for reversal of the demand letter. The copy of the said mail has been exhibited as Ex - C11. along with photographs

                      In another instance the O.P. vide letter dated 17.06.2005 had mentioned that on the request of the customers, the O.P. is not providing the flooring for the shops and had offered a rebate of Rs. 40 per sq. ft. The copy of the said letter has been exhibited as Ex - C12. It is pertinent to mention here that the O.P. vide demand letter dated 16.12.2004 had previously demanded the installment for the completion of flooring. The copy of the said letter has been exhibited as Ex-C13.

                      The aforementioned instances clearly establish the malafide, arbitrary unlawful attitude and functioning against the terms and conditions of the Agreement of the O.P. and it has definitely led to the deficiency of service on the part of the O.P.

                      6. That as per the initial plan the super area of the shop had been given as 240 sq. ft. whereas subsequently vide its letter dated 21.06.2005, the actual super area of the shop had been 235.69 sq. ft. The copy of the said letter has been exhibited as Ex - C14. But fraudulently and with malafide intentions in the final demand the opposite party had demanded the price for 238.53 sq. ft.

                      The O.P vide letter dated 21.06.2005 had confirmed that on the building, the actual Super Area of the shop had q. ft. instead of 240 sq. ft. and had also informed that entire amount of Rs. 17, 024.50/- paid by the complainant shall be adjusted while making the final payment at the time of actual possession.

                      Subsequently the' O.P. had mentioned the final Super Area to be 238.53 sq. ft. It is beyond explanation that once the Super Area of on completion of the building has been measured to be 235.6 sq. ft., how the same became 238.53 sq. ft.
                      The aforementioned submissions again establish the malafide and unlawful designs of the O.P.
                      7. That as Per the terms and conditions the complainant was not liable to make any payment for EEC and FFEC charges whereas in the final demand letter dated 05.07.2006 the complainant was asked to pay Rs. 29, 816.25/- under these heads also which is absolutely illegal, illogical and arbitrary which shows the malafide intentions and illegal designs of the opposite party. The copy of the said letter has been exhibited as Ex - C15.
                      8. .That as per the terms and conditions the opposite party was to hand over the possession of the completed shop with in 24 months of the letter of allotment, failing which the opposite party was bound to pay the penalty @ 5/- sq. ft. month.

                      The complainant had already paid the full amount to the O.P., yet the O.P. has failed to handover the possession. It is also pertinent to mention here that the O.P. has not till date supplied the copy of completion certificate issued by the competent authority. The issuance of the completion certificate is very essential before taking over the possession. Further, the O.P. is sending undue maintenance charges to the complainant which would have been due only after the actual completion of the project and handing over of the possession.

                      9. That as per the demand of the opposite party, vide demand letters dated, 17.09.2003 (for two installments, of Rs. 94, 800/- each), dated .19.05.2004 (for one installment of Rs. 94, 800/-) and dated 19.07.2004 (for one installment of Rs. 94, 800/-). The payments for the above mentioned installments so demanded were paid by the complainant vide cheque nos. 030602, 151019, 532297 dated 27.09.2003, 05.05.2004 and 29.07.2004 amount Rs. 1, 89, 600/-, 94, 800/- and 94, 800/- respectively. The copies of the said demand letter and the copies of the receipts have been exhibited as Ex - C16.

                      10. That after making payment of Rs. 5, 68, 800/- to the opposite party i.e. sixty percent of the tentative cost of the shop. The complainant on 08.08.2004 went to the site of construction to see the progress of work. At the site of construction on enquiry from one of the supervisors the complainant first time came to know that the complex Omaxe Arcade is not an A.C. block. The complainant again checked the web site of the co. Of Omaxe Arcade and it was confirmed that the shop booked under this complex is A.C. one and the prices being charged/paid are as per A.C. block. The complainant on the same day sent a mail to the opposite party for clarification along with the price list of the complex mentioning the prices as A.C. block. The opposite party instead of sending any clarifications changed the prices from A.C. block to non A.C. block in their web site on 10.08.2004. Same day complainant again sent a mail (copy enclosed) along with the revised/changed web site to the Co. asking for further clarifications. The complainant kept on asking for clarifications but no clarifications were given by the opposite party on this account. Copy Enclosed as exhibited as Ex - C17.

                      11. That opposite party sent demand letter dated 16.12.2004 under which the payment for further three installments was demanded as per details below:

                      1.On completion of flooring - 10% of basic price i.e. Rs. 94, 800/-
                      2. On completion of internal plaster - 10% of basic sale price i.e. Rs- 94, 800/-
                      3. On completion of internal plumbing and electrical works - 7.5% of . 71, 000/-

                      Before releasing further payment by the complainant, he visited the site to verify progress of work and was surprised to see that works for which the payment has been demanded have not even started. The complainant sent a mail on 18.12.2004 & 30.12.2004 to the opposite party and talked to Ms. Kajal on telephone. Ms. Kajal confirmed that flooring works have not yet been started and promised that the revised payment plan is being sent. On 05.01.2005 a mail from the customer care (Ms. Kajal) was received wherein she confirmed that only two installments amount to Rs. 1, 89, 600/- are due, which is to be paid by 15.01.2005. Regarding the issue of A.C. block of the„shop the complainant was advised to contact Ms. Sheetal in tel. no. [protected].'- Same day the complainant sent a mail to the customer care that only one installment of Rs. 94, 800/- (on account of completion of internal plaster shall be paid by 15.01.2005, But surprisingly, on 06.01.2005 a demand letter dated 03.01.2005 was received from the co. wherein they had demanded 3 installments i.e. 'on completion of internal plaster (10% of basic sale price - Rs. 94, 800/-, on completion of internal electric and plumbing work (10% of basic sale price - Rs. 94, 800/- and on completion of external finish (7.5% of basic sale price - Rs. 71, 000/-. The complainant again visited the site on 09.01.2005 to see the progress for which the payment have been demanded, but the complainant was surprised to see that the internal electric work was still in progress and the internal plumbing work was not yet even started since the location of toilet blocks have been from the original location as per the site plan shown at the time of booking. The civil works of the toilet block was still in progress so the-question of completion of plumbing does not arise. A mail along with photographs of the site of construction to prove that the payments for which have been demanded are yet to be completed was sent on 10.01.2005 to the opposite party for seeking clarification. However, one installment of Rs 94800/- was released on account of completion of internal plaster 50410 dated 15.01.2005. the copy of the receipt dated 20.01.2005 of the said amount is exhibited as Ex - C18.
                      However on visit to the site, even the internal plaster was also not found to be completed at some places. Thereupon the complainant wrote a letter to the opposite party complaining therein about the facts to the opposite party along with the The copy of the said letter along with the photographs is exhibited as Ex - C19.


                      12. That the co. was in a habit of claiming payments before the completion of works which is quite evident from their own letters dated 17.06.2005( EX - C12) wherein they had informed that as per the requests of many customers they are not providing flooring in the shops 23.04.2005 & 25.04.2005 again the complainant sent a mail to the opposite party complaining therein that the opposite party had demanded the installments for the phases of constructions which had not been completed and explaining therein the reasons for with holding the demanded installments. The copy of the said letter and the supporting photographs have been exhibited as E X- C 20

                      On 26.04.2005 a mail (copy enclosed) was received from the opposite party wherein it was mentioned that they had acknowledged my mail dated 25.04.2005 and informed that they will revert back by 27.04.2005 evening. A reply through mail was received from the opposite party on 03.05.2005. The copy of the mail enclosed as exhibited as Ex - C21, wherein it was mentioned that the status for which the payments have been demanded is pertains to your individual shop only. The payment can not be held back on basis that the same level of activity has not happened in the entire complex as confirmed by your site in-charge the status of your shop no. 14 is completed up to external finish and again requested for the payment. Immediately on receipt of this reply the complainant replied back on 04.05.2002. the copy of the said mail is exhibited as Ex -C22, wherein it was informed that as per the terms of the agreement the payment is to be released after the completion of plumbing works since there is no plumbing work in the shops it is evident that the payment is to be released after the completion of the plumbing works in toilets. Further the internal electric works were not yet completed since the electric switches was still to be provided. It is worthwhile to mention that the complainant is paying for the super area of the shop as such he is concerned about the payments to be released after the completion of the activity at the same level in the entire complex. The super area for which the complainant is paying 240 sq. ft. whereas the actual area of the including walls is nearly 150 sq. ft. from which it is quite evident that the payment amounting to Rs. 3, 50.000/- is being paid on account of common areas/common facilities external development charges etc. On 10.05.2005 a telephonic call was received from Mr. Alok Gupta, Vice President (Commercial) of the co. to whom all the facts were explained, he interim requested that one installment of Rs. 94, 800/-(being 10% of the basic sale price, be released and 2nd installment should be released only after completion of the electric and plumbing A mail to this effect (copy enclosed) was also mailed to Ms. Nisha sareen and Mr. Alok Gupta. The copy of the said mail is as Ex - C23. There was no denial from the O.P.
                      The O.P was adopting the malpractice of demanding the installments payments without the completion of jobs / work which is quit evident from the demand letters dated 16.12.2004, 03.01.2005 and 5.01.2005 issued within a span of 20 days.

                      13. That on a letter dated 21.06.2005 (Ex - C14) was received from the opposite party on completion of the building of the said project the actual super area of my shop is 235.69 sq. ft. against 240 sq. ft. as initially booked thereby resulting in decrease in 4.31 sq. ft. in super area and amount of Rs. 17, 024.50/- shall be adjusted with the final payment at the time of handing over of actual possession of the said shop.

                      14. That as per their demand letter dated 13.07.2005 a revised payment schedule was sent by the opposite party after adjusting the extra amount of Rs. 17, 024.50/- an amount of Rs. 56, 203.56/- may please be paid on account of completion of external finish. Accordingly payment amounting to Rs. 56, 000/- was paid vide cheque no. 504730 dated 04.08.2008. The copy of the said schedule of payment dated 13.07.2005 and the copy of the receipt dated 09.08.2005 of the said payment have been exhibited as Ex. -C24 & Ex -C25 respectively

                      15. That the opposite party demand letter dated 17.10.2005 was received by the complainant and amount of Rs. 1, 10, 026, 73/- was demanded on account of completion of flooring + 100% additional charges. This amount was paid vide cheque no. 183857 dated 28.10.2005. The copy of the demand letter and the receipt of the payment have been exhibited as Ex - C26 & Ex - C27.

                      16. That in reply to the contents of para no. 16 of the written statement it is to be submitted that as already submitted in foregoing para, that the O.P vide letter dated 21.06.2005 had confirmed that on completion of the building, the actual Super Area of the shop had been 235.6 sq. ft. instead of 240 sq. ft. and had also informed that entire amount of Rs.17024.50/- paid by the complainant shall be adjusted while making the final payment at the time of actual possession.

                      Subsequently vide letter dated 05.07.2006 the OP. had mentioned the final Super Area to be 238.53 sq. ft. It is beyond explanation that once the Super Area of on completion of the building has been measured to be 235.6 sq. ft., how the same became 238.53 sq. ft.
                      To this-regard, the complainant had sought a clarification from the O.P. But till date no clarification on the aspect has been received by the complainant.


                      17. That the complainant has already made a payment of Rs. 9, 24, 400/- against the basic sale price of Rs. 9, 30, 975.50/- taking into 'consideration of super area of 235.69 sq. ft. This super area has already been confirmed by the opposite party on 21.06.2005. As per the original contract and actual super area of 235.69 sq. ft. The balance amount due to be paid to the opposite party is Rs. 6, 575.50/-against the, basic sale price. As per agreement the following additional charges are also to be paid at the time of taking possession:
                      • Interest free maintenance security - Rs 10, 000/-
                      • Power back-up charges for 3 K V A @ Rs 10, 000 per KVA - Rs 30, 000/-
                      • Total - Rs 40000

                      18. That as per the statement of the account the opposite party had demanded an interest of Rs. 12, 007.36/- for delayed payment by the complainant. But subsequently during the discussion with Ms Sheetal Gupta of the O.P. on 10.07.2006, she had agreed that all the payments have been received in time and hence, no payment on account of interest was due from the complainant.

                      19. That although the opposite party had demanded for the final payment, but on visit to the site by the complainant on 16.07. 2006, it was found that, still the work on the site viz. entrance door and electrical accessories, the false ceiling, the final finishing and other, works had not yet being completed. It was duly intimated to the opposite party by the complainant through registered post as well as e-mail. The copy of said letter along with the postal receipt and the supporting photographs have been exhibited as Ex - C28.

                      20. That the complainant had again written to the opposite party to redress his grievances with regard to the completion of the said premises and not to indulge in the unfair trade practices on 14.09.2006. The copy of the said letter is exhibited as Ex - C29. But the opposite party failed to fulfill their obligation by which they were bound by the terms and conditions of the agreement.

                      21. That as per the terms and conditions and the price of the said shop, the balance due to be paid by the complainant to the opposite party had been Rs. 46, 575.50/- whereas the opposite party had illegally and by malafide intentions, sent the demand letter for Rs. 1, 00, 164, 36/- . As per the demand letter dated 05.07.2006 it was mentioned that the contents of the statement shall be deemed to be correct, unless informed about any discrepancy within 7 days from the date of this letter. Accordingly complainant along with the necessary documents visited their office to sort out the matter. The matter was discussed with Ms. Sheetal Gupta on 10.07.2006 in the following four issues were discussed exhibited as Ex - C30 :

                      • Interest on account of delay remittance - Rs. 12, 007.36/-
                      • EEC and FFEC charges @ 125/- per sq. ft, - Rs. 29, 816.25/-
                      • Amount due to the complainant on account of delayed construction / possession.
                      • Discrepancy in exact super area, exact carpet area of shop and the basic of calculation of super area.

                      22. During discussions Ms. Sheetal Gupta called for the relevant docuents after going through she admitted that all the payments have been received in time and no payment on account of delayed payment is to be paid. Secondly regarding EEC and FFEC charges she admitted although there is no clause in the agreement for the payment of these charges but these are the additional charges which are being charged by the other builders and hence shall have to be paid by you. It is pertinent to mention here that the parties are bound by the terms and conditions of the agreement and opposite party can not demand-any. amount which is not envisaged in the terms and conditions of the agreement.

                      23. That the complainant tried his best to sort out this issue without any further delay but no response was received from the Co. Further reminder mail sent on dated 14.09.2006 (copy enclosed) since no reply was received; a legal notice by the complainant lawyer was sent on 16.10.2006 along with balance payment of Rs. 46, 600/- was sent o the opposite party (copy enclose). Further two mails dated13.12.2006 and 29.12.2006 were sent to the opposite party requesting them for handing over the possession since the full amount due have already paid. Copy of the legal notice along with the postal receipt is exhibited as Ex - C31.(For which O.P has not sent the payment receipt till date)

                      24. That in-spite of handing over the possession the opposite party had started demanding the Maintenance charges and interest of the above said shop The copy, of the said demand letter is exhibited as Ex - C32. It is pertinent to mention here that since the party had failed to give the possession of the shop to the complainant inspite of his making the full payment, no maintenance charges are to be paid by the complainant.

                      25. That as per the agreement the total time of completion/handing over of the possession is two years incase the possession within a period of two years, the opposite party shall be liable to pay damages for the period of the delay in handing over the possession at the rate of Rs.5/- per. Sq. ft per month (from the date of allotment i.e. 6th July 2003)

                      It is mention here that the construction of shop had not been completed within stipulated time of two years. Further, the OP. had failed to supply the copy of completion certificate which is authentic document to prove the actual date of completion. The possession of the shop is still with the opposite party for the reasons best known to them only. Nothing extra is payable by complainant on account of maintenance charges, holding charges. On the other hand the opposite party is liable to pay the delayed possession charges till the final possession to the complainant as envisaged in the terms of the Agreement.

                      26. That the complainant has suffered a financial loss of app. Rs.2, 00, 000/- on account of the default / deficiency on the part of opposite party in not handing over the possession of the said shop to the complainant possession in the prescribed time to the complainant and the opposite party had illegally and malafidely kept on demanding the payments from the complainant exorbitantly. This clearly establishes the Deficiency of Service by the opposite party.

                      That the Hon'ble Forum has got the jurisdiction to entertain and try and adjudicate upon the present complaint.


                      It is most respectfully prayed before the Hon’ble forum that: –

                      1. The opposite party may kindly be ordered/directed to handover the possession of the premises to the complaint without making demands of payment not envisaged in the terms & conditions of the agreement

                      2. The opposite party may kindly be ordered/directed to pay sum of Rs 2, 00, 000/- along with the interest @ 18% p.a as compensation/damages to the complainant because as per agreement O.P was suppose to handover possession by June 2005.

                      3. The opposite party may kindly be directed/ordered to pay the penalty @ R.s 5/- SQ.FT/month along with interest @ 18% p.a for the delay in handing over the possession to the complainant

                      4. The OP may please be directed to hand over the completion certificate.

                      5. The opposite party may kindly be directed/ordered to pay the cost of the complaint to the complaint and against the opposite party.

                      Any other order, which this Hon’ble court may deem fit and proper, may be passed in favour of the complainant and against the opposite party.



                      Delhi. COMPLAINANT
                      Dated:
                      Aug 14, 2020
                      Complaint marked as Resolved 
                      Helpful
                      Found this helpful?
                      Write a comment
                      Report
                      Copy

                      Post your Comment

                        I want to submit Complaint Positive Review Neutral Comment
                        code
                        By clicking Submit you agree to our Terms of Use
                        Submit
                        R
                        Rakesh Kumar
                        from Lucknow, Uttar Pradesh
                        Jul 15, 2009
                        Resolved
                        Report
                        Copy
                        Resolved

                        I have given to Omaxe on pre launch Rs6.4 for OMAXE PALM GREENS PROJECT in SECTOR -MU in Greater Noida in Sept 2006.

                        The company did n't even sent me any application form at that time for booking and no allotment terms and conditions and no information as to when the project will finish for around 2 years even.

                        They simply readily took the Chq of 6.4 lacs as pre launch money.

                        In July 2008 after 2 years Omaxe demanded Rs 4.3 lacs further but still no terms and conditions of allotment were sent.

                        Also with this demand they sent me application form of booking which I refused to sign and asked for refund and cancellation.

                        They cancelled but refunded me not my money.

                        They are asking me to submit a affidavit on stamp paper which mentions terms and conditions in their favour and to hararss further. And which I refused to also sign.


                        The company is using my Rs 6.4 lacs for it's business illegally and unfairly until today and not refunding my money inspite of my repeated requests.

                        An action should be aken against for misusing the funds of the public in tus way since I'm told that there are around 80-100 other complainants like me.

                        I HAVE NOT SIGNED ANY AGREEMENT OR NO DOCUMENT OR NO APPLICATION FORM WITH COMPANY.


                        But I'm being harrased. IF any one other is here like me please do share with me.


                        My skype id is: sathi231 and my yahoo id is : sathi231

                        I'm NRI and CA by profession.

                        CA Rakesh Kumar
                        [protected]
                        Aug 14, 2020
                        Complaint marked as Resolved 
                        Hello Sir,

                        I do agree that this builder is cheating now. I had also applied for the refund but they haven't given it till now. I have also not signed any kind of agreement till now with them. I will consult lawyers and then let you know about the procedure.

                        Thanks
                        Ajay
                        Hi Ajay,

                        Any developement so far ? I am also suffering in a similar way with Omaxe. Let me know if anyone of you has been able to get the refund amount ?
                        Thanks
                        Atul
                        Friends .. I am planning to buy a house in mumbai .. i have searchd the internet for each and every builder that i have shortlistd, , , all have problms
                        Hi Ajay, Atul & Rakesh!!,

                        I am also one of the customers of this project like you all. I also paid at pre-Launch in Oct-2006 and Omaxe is enjoying my Rs. 7 Lacs till date. I visited the site on Sunday 28/02/2010 and Progress of the project is too slow. Omaxe is pretending to be doing some construction but as I know this status is unchanged since in past 6 months. More over builder is offering Rs 1800/= psft to new customers.

                        In nut shell Omaxe is cheating its customers and these kind of builders are cancer to this nation. I dont understand how Mr. Rohtas Goel is moving freely in India despite of several criminal cases. People like him should be hanged in public as he has made hundred of lives in hell

                        Jugal Agrawal
                        +91 [protected]
                        Hi all

                        i want to book a flat where i have to go
                        Omaxe Orchid is ok or fraud


                        Ezaz
                        Helpful
                        Found this helpful?
                        5 Comments
                        Report
                        Copy

                        Post your Comment

                          I want to submit Complaint Positive Review Neutral Comment
                          code
                          By clicking Submit you agree to our Terms of Use
                          Submit
                          R
                          Rakesh Kumar
                          from Lucknow, Uttar Pradesh
                          Jul 12, 2009
                          Resolved
                          Report
                          Copy
                          Resolved

                          I paid pre launch money of 6.4 lacs to Omaxe in Sept 2006 without signing any application form even as ws not given to me. But the form was sent in July 2008 with further demand of 4.3 lacs.

                          I refused to sign any document since too much delayed ad no allotment agreement or conditions even defined.
                          So I refuse to sign any document and pay nothing morebut asked fo refund with interest since the company has defaulted in its services which has deficiency.

                          The company has refused and is harrassing me and refunding full money.

                          Anyone with similiar case kindly contact [protected] ( Delhi ) . Would like to discuss.
                          Aug 14, 2020
                          Complaint marked as Resolved 

                          OMAXE Builders — inordinate delay delay in registry

                          purchased plot no.8 at baddi ,himachal pardesh,paid 100 percent amount,not responding to even phone calls,my big amoun is in peril, pl. help

                          OMAXE Builders — non possession of flat

                          I purchased a flat at sector 50 noida.twin towers by omaxe builders. THe possession was promised in june 2010. before atleast they answered the email. they have stoped replying now. someone please help & let me if I will ever get the possession. I paid the full amount. thaks

                          OMAXE Builders — Omaxe forfeited the deal

                          I am one of the victim of Omexe builders. I was given a flat at Omexe heights FBD then omexe forfeited the deal taking 75% of booking amount as charges. I went to there office so many times but nothing comes out can you please help as how can I take this further.

                          Sharat Goel
                          [protected]@gmail.com
                          [protected]
                          Helpful
                          Found this helpful?
                          3 Comments
                          Report
                          Copy

                          Post your Comment

                            I want to submit Complaint Positive Review Neutral Comment
                            code
                            By clicking Submit you agree to our Terms of Use
                            Submit
                            A
                            Ajay Arora
                            Jun 29, 2009
                            Resolved
                            Report
                            Copy
                            Resolved

                            Customer Code: OSV/OPH/10


                            This is reference to Omaxe Panache home flat booked by me at Sector 78 Faridabad. Rs. 1.50 Lac was paid as Advance (refer: Receipt 342637 dated 11th Feb'2009.

                            It was promised that allotment of the flats shall happen within 60 days, however, till today, no allotment information have reached me.

                            I have been following up with respect to various mails (dated 13th May, 16th June, 20th June, 23rd June, 25th June and 26th June) and letter (send vide Blazeflash courier docket no.[protected] dated 26th June'2009 and also personal visit on 23rd June'09 but have failed to get any satisfactory response.

                            I have been talking repeatedly with Mr. Amit Dheer, Mr. Jimmy Dung, Customer Care, Nandita but all have never reverted back.
                            Aug 14, 2020
                            Complaint marked as Resolved 
                            Dear Ajay,

                            Talking with customer care at Omaxe is useless, me too have face the same issue . I am plannig to go to customer court for the same. In case if you too are interested we both can plan accordingly .
                            Boss, I also need you help regarding this can you please contact me [protected]
                            Helpful
                            Found this helpful?
                            2 Comments
                            Report
                            Copy

                            Post your Comment

                              I want to submit Complaint Positive Review Neutral Comment
                              code
                              By clicking Submit you agree to our Terms of Use
                              Submit
                              S
                              Sanjay Dwivedi
                              from Gurgaon, Haryana
                              Jun 28, 2009
                              Resolved
                              Report
                              Copy
                              Resolved

                              I've booked One Flat in Omaxe Riviera Rudrapur in April'2007 (2.25Years back) on their committment to give possession in Dec'2007.
                              100% Payment has been made in Nov'2007 thru Bank (after 9 months of booking), at the completion of 70% of the work (verified by bank).
                              After 100% payment, 1 year & 7 months have been passed & rest 30% work could not be completed. Now they have indicated to give possession in Nov'09 (another 5-6 months).
                              Since 15th Feb'09, no work has been conducted further & it seems difficult to give possession by Nov'09 even.
                              A lot of reminders have been given.
                              Now they ask to change the flat in another tower, which is not acceptable to me.
                              I'm asking either refund of money with Interest (withdrawl) or recovery of Losses (@Rs11000/month), I'm paying as House Rent.
                              Please help
                              Aug 14, 2020
                              Complaint marked as Resolved 

                              Omaxe Ltd — No sign of possession of booked flat

                              I've booked One Flat in Omaxe Riviera Rudrapur in April'2007 (2.25Years back) on their committment to give possession in Dec'2007.
                              100% Payment has been made in Nov'2007 thru Bank (after 9 months of booking), at the completion of 70% of the work (verified by bank).
                              After 100% payment, 1 year & 7 months have been passed & rest 30% work could not be completed. Now they have indicated to give possession in Nov'09 (another 5-6 months).
                              Since 15th Feb'09, no work has been conducted further & it seems difficult to give possession by Nov'09 even.
                              A lot of reminders have been given.
                              Now they ask to change the flat in another tower, which is not acceptable to me.
                              I'm asking either refund of money with Interest (withdrawl) or recovery of Losses (@Rs11000/month), I'm paying as House Rent.
                              Please help
                              I am going through same process in. I am filing a suit through Consumer Court and a PIL under IPC 420.
                              Call me on [protected]
                              navin.[protected]@rediffmail.com
                              I am going through same process in. I am filing a suit through Consumer Court and a PIL under IPC 420.
                              Call me on [protected]
                              navin.[protected]@rediffmail.com
                              Helpful
                              Found this helpful?
                              3 Comments
                              Report
                              Copy

                              Post your Comment

                                I want to submit Complaint Positive Review Neutral Comment
                                code
                                By clicking Submit you agree to our Terms of Use
                                Submit
                                V
                                Vishal Sharma
                                Jun 19, 2009
                                Resolved
                                Report
                                Copy
                                Resolved

                                I m Vishal Sharma.I have received many call from idea post department no. [protected](Raj Kumar),[protected]Akash).They told me the plan and asking to convert my prepaid to postpaid.i was agree with it.After they told to submit our id proof and photograph and i have to submit that on 16-06-09.They gave me the post paid sim and take out Rs.250, Now 3 days passed and my sim is not activated and they person are not attened the call now.Plz slove the problem as soon as possible.Tell with whom i m concerned.My cell no is [protected],[protected] and i m also giving the address of that office(IDEA POSTPAID) T-1, Second Floor, Near Stadium, Noida(UP).plz take actioned regarding this asap.
                                Thanking You.
                                Aug 14, 2020
                                Complaint marked as Resolved 
                                abe chutiye...kisne kha tha postpaid sim lene k liye...bhan ke land madachod dimak khol k kam kiya kar...all the bet for yur life ahed.
                                Helpful
                                Found this helpful?
                                1 Comment
                                Report
                                Copy

                                Post your Comment

                                  I want to submit Complaint Positive Review Neutral Comment
                                  code
                                  By clicking Submit you agree to our Terms of Use
                                  Submit
                                  P
                                  Pradeep Dubey
                                  Jun 19, 2009
                                  Resolved
                                  Report
                                  Copy
                                  Resolved

                                  We have got new postpaid mobile connections under our CUG scheme (Omaxe Ltd.) in Talk399 new plan from VODAFONE.

                                  At the time of applying this connection Vodafone R. M.(Ms. Kapila Sachdeva Ph.[protected]) and executives promised us to give us some assured benefits in our Tariff as per given below:-
                                  1. 450 minutes free local call to all network
                                  2. 350 local SMS free
                                  3. 200 minutes STD call free to all network
                                  4. Rs.300/- Discount in monthly rental /Rs.99/-rental per month
                                  5. Local Vodafone call charges 15 paisa per minute
                                  6. Other local mobile call charges 50 paisa per minute
                                  7. Local Landline call charges : 90 paisa per minute
                                  8. SMS charges Rs.1/- per SMS
                                  9. STD call charges Rs.1/- per minute
                                  10. All call to our CUG connection would be free
                                  The above said Tariff is mentioning same on our Tariff Enrollment Forms filled by Vodafone excutive.

                                  We have also received the confirmation telephone calls from Vodafone and their executives told us and confirm us the above said Tariff.

                                  But we are sorry to say that as per our bill which we have received from Vodafone, we did not get the above said assured benefits/Tariff. After that we send email and its reminder sevral time but we did not get any satisfactory reply from them.

                                  We have surprised to see that Vodafone corporate care Department did not able to give any reply and also your Customer care Help line(111) unable to give us any satisfactory answers.
                                  Aug 14, 2020
                                  Complaint marked as Resolved 
                                  This is shows that how much this company CHEAP AND CHEATER. I CALLED "CHEATER VODAFONE".
                                  Helpful
                                  Found this helpful?
                                  1 Comment
                                  Report
                                  Copy

                                  Post your Comment

                                    I want to submit Complaint Positive Review Neutral Comment
                                    code
                                    By clicking Submit you agree to our Terms of Use
                                    Submit
                                    A
                                    Amit Dua
                                    from New Delhi, Delhi
                                    May 19, 2009
                                    Resolved
                                    Report
                                    Copy
                                    Resolved

                                    Hi,

                                    This is regarding a real-estate company OMAXE Ltd. which I thought to be one of the best names in the real estate market. But the episode which happened with me totally blew my good perception about this company and has made me to believe that these agents are no less than fraudsters when it comes to money.

                                    I had been in search of property since many years but was afraid putting my money into some unsafe hands so I decided to put my money into OMAXE which I got to know from my colleague in ICICI home search when I was with ICICI Bank-

                                    OMAXE came out with a pre-launch offer for a group housing scheme in Sec-112 Noida with written terms and conditions to launch and allot the flat maximum within a year’s time, though I was told by the representative that the project will be launched within 4-6 months with very lucrative offers for pre-launch buyers. We kept on following up with OMAXE and ICICI Home search when the flats were being launched and they kept on saying that the same has been held for some more time due to technical reasons like development of FNG expressway etc. and that too because they want maximum investor benefit. The clause also says that in the event the flats are not launched within a year, the customer would be able to withdraw his money after 30 days notice with an interest rate of 9% per annum.

                                    On listening to so many promising aspects we (Amit Dua & Anju Dua – husband and wife) booked a flat which was supposed to be 1350 sq.ft. and paid a sum of Rs.6 lacs through cheques against receipt number 203028 dated 16th May-2007 against registration amount received by the company.

                                    The flats weren’t launched as promised and after stipulated period of one year, we approached OMAXE and ICICI home search in 15th / 16th month (Oct-08) asking for cancellation of the above registration. But OMAXE, despite proceeding with the cancellation of registration sent a letter dated 19th Nov-08 intimating for provisional allotment of the apartment, only to further shock us that the price offered against the allotment as inquired by us from your office was Rs. 10 lacs more than the tentative price mentioned at the time of registration in Pre-launch scheme.

                                    We gave a written request to OMAXE for canceling the registration and refunding the amount since they did not fulfil the conditions of the scheme, but despite canceling the registration and refunding the amount to us sent another letter in Dec-08 mentioning the contents of the earlier letter in Nov-08.

                                    We again approached ICICI home search to inform and request canceling of the booking/registration who further gave us NOC regarding the same and informed OMAXE, but till now we haven’t got the money back and the company officials have been procrastinating the same indefinitely.

                                    We met following officials as well but they too applied arm twisting methods on us like they gave an option to transfer our booking to some other project etc. The below are the highly placed officials of OMAXE whom we met –

                                    Mr. Ritesh Sehgal – Head Commercials - [protected]
                                    Ms. Shikha Garg – Head Customer Care - [protected]

                                    And another top official (lady) whose name I’m forgetting.

                                    We would request you to help getting us our HARD EARNED MONEY back from OMAXE as this is our 6-7 years savings for purchasing a house. I and my wife have worked tirelessly to give a better and secure future to our child.

                                    Attached are the set of documents related to the case.

                                    For your information we have also approached consumer forum in Jan-09 which has given first hearing date on 20th July-09.

                                    Regards
                                    -Amit Dua / Anju Dua
                                    [protected] / [protected]
                                    Aug 14, 2020
                                    Complaint marked as Resolved 
                                    Helpful
                                    Found this helpful?
                                    Write a comment
                                    Report
                                    Copy

                                    Post your Comment

                                      I want to submit Complaint Positive Review Neutral Comment
                                      code
                                      By clicking Submit you agree to our Terms of Use
                                      Submit
                                      G
                                      Gajraj Jain
                                      from Delhi, Delhi
                                      May 1, 2009
                                      Resolved
                                      Report
                                      Copy
                                      Resolved

                                      Omaxe, Jaipur have sold villa adjacent to my villa no. 955 and other villa's in same row in Rs 31.0 Lacs, within two to three months of villa sold to me in Rs 35.0 Lacs, WHICH IS THEIR BASIC SALE PRICE.

                                      BASIC SALE PRICE OF 263 SQ YARD OMAXE VILLA IN OMAXE CITY JAIPUR IS STILL Rs 35.0 LACS, BUT THEY ARE SELLING EVEN AT Rs 31.0 LACS, WITHOUT OFFICIALLY CHANGING THEIR BASIC SALE PRICE. AND CONSUMERS LIKE ME ARE GETTING CHEATED.

                                      This is totally undesirable and against reputation of company like OMAXE and comes in category of fraud and cheating, AND I AM NOT ABLE TO BELIEVE CONSIDERING OMAXE REPUTATION.

                                      Also during my deal for villa no. 955, it was committed BY OMAXE that my villa no. 955 shall be completed and hand-over to me in November '08 Last week or December '08 First week, which has not been honored and every time new date for completion and handing over is given to me.

                                      I have already paid 95% money and incurring heavy interest on it. In last four months i have incurred Rs 1.1 Lacs interest, on 95% money @11%, which is also due on OMAXE, as OMAXE have not handed over villa to me, till date.

                                      During my visit to OC Villa 955 on 20.04.2009, I am surprised TO see that that no work is going on my villa (when it will be handed over is not known) and 95% money has been lying with OMAXE, for last Seven Months.

                                      Hence i requested OMAXE to refund my entire money alongwith 12% interest immediately otherwise i shall be forced to take help of law, as it seems to be clear case of forgery, on part of M/s Omaxe.

                                      KINDLY HELP ME HOW TO GET REFUND FROM OMAXE.
                                      Aug 14, 2020
                                      Complaint marked as Resolved 
                                      Helpful
                                      2 other people found this review helpful
                                      2 found this helpful
                                      Write a comment
                                      Report
                                      Copy

                                      Post your Comment

                                        I want to submit Complaint Positive Review Neutral Comment
                                        code
                                        By clicking Submit you agree to our Terms of Use
                                        Submit
                                        S
                                        sandee_s
                                        from Pune, Maharashtra
                                        Apr 15, 2009
                                        Report
                                        Copy

                                        Dear Sir,

                                        My complaint is that i had booked a flat of 910 Sq feet in omaxe udrapur project in Victoria Tower C block on dated 28 feb 2008.At the time of booking builder given me the assurance that possesion will be given before 15Th august 2008.I have already paid 95% amount of flat cost but till date i have not got any information of possesion, But When we checked the status of the site and found that no work was going on.Now the builder is saying that he is not in condition to complete the flats in near future so if i want i can shift an other location which they are thinking of completing in near future.Also they have increased the super area to 35 sq feet, then what they have commited at the time of booking.Also builder is not providing the basic ammenties which he chagred us, like club, swimmiming pools&market complex.Builder also charged us 25 Rs/Sq feet as a life time maintenance chage.Now omaxe people are saying that flat owner has to pay 80 paise per sq feet on monthly basis as a maintenance charge.We are here group of 10 people who bought the flat in same tower and facing the same problem.When we asked for the cancellation the omaxe authorities says we don't have money right now and we will refund it whwn we will be having it.We all feeling trapped and felling helpless.We all feeling that builders are making fool o[censored]s enjying our hard earned money.No law in this country can stop them betraying people.

                                        Mobile No- [protected]
                                        Name -Sandeep saxena
                                        Location -pant Nagar(Uttrakhand)
                                        Any solution, provided to you so far.
                                        I'm also in same boat.
                                        OMAXE IS DOING SAME THING AT BAHADURGARH
                                        3 Bed Rooms flat booked (20 % already paid by all at time of booking) two year earlier and construction not started.
                                        No Reply to Customer.
                                        No Refund
                                        give me mail ur booking details.
                                        The problem with builders is that they were small time borkers before they turned builders themselves. They just dont have the capacity to manage big money, They splurge, buy expensive things and houses and live lidfe king size and keep acquiring land and announcing properties without much plannng and then when crisis comes they just dont bhave the money. Eevn big builders like DLF and Unitech are immune. Right now most are launching cheap affordable houses to lure investers and then finance their big ticket projects. so bewqare and PRAY.
                                        I am a civil engineer, i have checked the quality of work in Omex Rudrapur, the quality of work and material is too cheper, bulding strength and foundation are not sutable as per norms, bulding can not stay long time, the hole constructed bulding must be re-audit bysome expert.

                                        I will suggest to move in cort and file a case against to bilder and Life is life so forget omex and try to withdrow from omex and take money back through cort.
                                        Dear Sir,

                                        please send a copy of layout for two bedroom set and three bedroom set in rudrapur site.

                                        thanks
                                        best regards
                                        subhash dhiman
                                        [protected]
                                        Dear sir,

                                        Please send me the plantlayout of two bed room set flat amd their cost.Please send me the payment term also.

                                        Thanking you
                                        Ashutosh kumar mishra
                                        [protected]
                                        i also have flat in Omaxe rudrapur and i am facing the same problem . there was clause of penalty for delay in handing over the flast but now they are not ready pay the penalty.

                                        i would suggest to make yahoo group for omaxe property owner, please send me mail whoever is intrrested to discuss our issue at [protected]@emirates.net.ae

                                        regards

                                        K, R.S.CHAUDHARY
                                        Helpful
                                        Found this helpful?
                                        8 Comments
                                        Report
                                        Copy

                                        Post your Comment

                                          I want to submit Complaint Positive Review Neutral Comment
                                          code
                                          By clicking Submit you agree to our Terms of Use
                                          Submit