Comments
bathrooms on 7th floor taps to be changed
bathrooms on 4th floor : washbasin to the replaced 2) PVC pipe o[censored]rinal to be changed 3) stop cock to be changed
4) swever jam tosbe opened on 4th floor and 7th floor
the complaint is urgent as RDs conference is scheduled to be held on 5th Jan on 4th floor
bathrooms on 4th floor : washbasin to the replaced 2) PVC pipe o[censored]rinal to be changed 3) stop cock to be changed
4) swever jam tosbe opened on 4th floor and 7th floor
the complaint is urgent as RDs conference is scheduled to be held on 5th Jan on 4th floor
staff selection commission — tap in bathrooms to be changed
7th floor gents bathroom and taps to be repaired4th floor Wash basin and water lodgging in swever
PVC pipe to be changed in gents bathroom
water pipe on 3rd floor in canteen have burst and water is spilling- pl take immediate action
staff selection commission — water leakage
complain No 1; water pipe on 3rd floor has burst and water is spilling all around and flooding the area in canteen side.complain No 2: Over head pipe on roof has burst and water is overflowing from roof with great speed.
46%
Complaints
1423
Pending
0
Resolved
653
CENTER NAME- MOTI RAM BABU RAM GOVERNMENT(PG) COLLEGE Haldwani UTTARAKHAND
Sir,
In the exam of SSC TAX ASSISTANT the OMR sheet number & the number written in the test booklet should be same but invigilators gave us differet OMR sheets with different test booklet. When the candidates requested to give them same OMR sheet with test booklet having the same number then invigilators refused & said it is not compulsory & talk rudely with the candidates,
If our OMR sheet is rejected then who is Responsible?
So Pls tell me that what can we do for this big mistake of our center head??
pls reply me soon...
My ID is imkool.[protected]@gmail.com