1. During the months of Sept/Oct of 2014, the in line booster pump embedded in the water supply line was replaced with a new pump.
2. The chamber construction work has not been done and the soil is loose in that part of the road.
3. In our colony, an old building is being demolished and in its place a new apartment complex is coming up.
4. Due to this activity, there is a possibility of heavy vehicles going over that patch of road where the pipeline containing the embedded booster pump is located underground, where the soil is loose, and damage the pipeline and pump leading to disruption of water supply to our colony.
5. In the next two months, we will have rains and this pit will be filled up with loose soil and certainly leadin to accidents such as vehicles getting trapped in that pit.