Kerala Water Authority — main sewage pipe leak-by the side o[censored]lloor thodu - sewage water flows into our compound. no.1013/m (wr)/ord/2018 dted. 5.05.18- | |||
Kind urgent immediate attention and action Ref: no.1013/m (Wr)/ord/2018, dted 5.05.18. The main sewerage pipe (Old earthenware pipe) underlying the drainage road by the side o[censored]lloor thodu (Cannal) is broken in many places and the pumps are damaged this has been inspected and verified by the sewerage section. Pipinmoodu, sasthamangalam during the last rainy season. We were reassured that it will be replaced/ effectively rectified when the rains stop. No action has been taken so far. From the leaking pipe, sewerage water flows into our compound, causing much misery and suffering. With present rain it has increased severely. Kindly take immediate effective steps and save us from the misery caused by the broken old sewerage pipe and damaged Pump. Date: 15.05.18 dr. K. A. Kumar & m. L. Radhika T, c, 13/598, nr. Ulloor bridge, pattom. P. O Trivandrum-695004 Ph [protected]/[protected]/[protected]/ Arvind. [protected]@gmail.com Was this information helpful? | |||
2 Comments | |||
Comments
Piravom Kwa office is not picking up phone even after repeated calls
I wanted to enquire about my Bill status
I wanted to enquire about my Bill status
6%
Complaints
686
Pending
0
Resolved
40
+91 47 1233 3205
+91 47 1232 8658
+91 47 1232 8654
‘Jalabhavan’ Vellayambalam, Thiruvananthapuram, Kerala, India - 695033
bill no:35630780
consumer no:E35/1560/D
water bill paid online on 09/05/2018.but payment receipt didn't get.
Please send it through mail