Address: | Bangalore, Karnataka, 560005 |
Dear sir/madam,
Yesterday (30th december '2017), i traveled from chennai to bengaluru. During this travel there were couple of toll stretch that had a lot of pot holes making driving very difficult. Given that most of the vehicles fly at higher speed (Say 60kms or more per hour) on highways, it was extremely difficult to navigate the pot holes. This was hurting the vehicle and made the drive difficult.in some of the stretch there was no road.
I did not think that the road between sriperumbudur and kachipuram are toll roads. The toll collection being made at nemili sriperumbudur and chennasamudhram should be immediately stopped until the roads are repaired.
Sadly nhai authorities are not doing proper inspection, else an action would have been taken by now. So, request the roads are made motor-able else the toll collection stopped.
Appreciate your support.
Yours sincerely.
Vijay Was this information helpful? |
As above in sublject I want to say you these two foulane is not using the material as per your estimte because these two contracter company ILFS & Gayatri construction are doing 'GHOR ANIYAMITATA'.
ITS MY KIND REQUEST TO YOU TO INVESTIGATE IT ON PRIORITY LEVEL.
REGARDS
SUMANT KUMAR
NEW KALI BARI COLONY EAST
GAYA: 823001