Respected Sir,
As it happens, this year too Thane Ghodbunder road is full of potholes, making life riskier for vehicle owners, specially 2 wheeler as during rains/night time its difficult to gauge potholes on the road while driving.
strech from gaimukh till top of hill, was worked by your team about 2 months back but now again is back to original with multiple potholes.
Why cant we make it concrete likewise of road from gaimukh till thane E.E.Highway ?
Adding nightmare, there is movement of heavy vehicles during peak hours, which further slows down traffic.
i have 3 suggestions, if you pls arrange to implement imm -
1) fill all potholes imm with strong work from gaimukh till hotel fountain both sides.
2) No piling of heavy vehicles/trailers/trucks between 7 to 11 in morning and evening on entire strech - Hotel fountain W.E.Highway till E.E.Highway.
3) Make remaining stretch of Gaimukh to Hotel Fountain W.E.Highway concrete.
If you pls get this implemented imm, it will save lives, make commute easier and risk free and faster for common people like me travelling everyday from borivali to thane thru thane ghodbunder road. Was this information helpful? |
Post your Comment