Mahadiscom / Mseb / Msedcl — incomplete work in cable connection from dp to meter board of our society. | |||
On 23/03/2020 there was disruption in power supply at b wing of our society. After lodging complaint, representatives from mahadiscom visited society and tried to locate the fault. As they could not locate the same a separate cable was joined from the meter board of a wing of society and power supply was restored temporarily. Subsequently after deploying men and machine your representatives could locate the fault by digging out the faulty cable. They have removed a portion of the cable and are expected to replace the same by connecting through a suitable cable. Inspite of constant follow-up the work was never attended thereafter, even after 5 months to the incidence and the trench dugup remain still open posing danger to the society members especially elderly and children as it is located in prime place of the society. There is a tree adjacent to the trench and its roots are damaged during the digging of the trench. It is leaning dangerously towards the building and may fall any moment which may lead to physical injury to the members. We are sending photos of the actual site to highlight the situation with a request to attend the work on urgent basis immediately. Kindly consider this matter as emergency and take suitable action without any further delay. Thanking you For kumar ashiyana society Chairman Was this information helpful? | |||
Add a Comment | |||
12%
Complaints
4131
Pending
0
Resolved
504
+91 22 2261 9100
+91 22 2261 9300
Hongkong Bank Building, M.G. Road, Fort, Mumbai, Maharashtra, India - 400001
Post your Comment