Being at L7M grade
Was cheated jointly by CH and DM and was forced to resign from the company.
Inspire of just being transferred to Jabalpur location for sx month only .
My appraisal of[protected] was planned in such a way that without discussing with me even given 4 rating by my superior.
Planned by CH in such a way that given 1 rating.
Being a performer throughout was intensively given rating of 1 and continuously tortured by CH to resign.
I have given appraisal rating to my subordinate with proper discussing with them and with proper format set by the company.
I was so much in depression after submitting my resignation that to forced to do so.
Has inform HR too.
Bu in vein.
My SAP code 24003728.
Please escalate as I use to resolve complains with sincerity.
Justice expected with within.
Regards Was this information helpful? |
Post your Comment