[Resolved] DHBVN, Faridabad — Regarind Meter Replacement (DD[protected] | |
Dear Sir, Reffering to the meter no. DD-16-2725, the electric meter was not working since 15.07.2008. And we place the complaint for the same. After inspection by the compleint officer Mr. Ram Kumar, he confirm that the meter will be replaced by the new meter. So that I disucess it with Mr. Parveen Kumar(J.E. Sanjay colony, Sec-23, FBD.). he said that you are require to deposit the meter fees Rs. 740 in the DHBVN office. So that i deposit the fees Rs. 740 on 22.07.2008 but till date the meter would not be replaced. You are requested to take the nessessory action. And solve it as soon as possible. this is for your kind information that i am a salary employed person. and it is impossible for me to take the leave form my office for the above. Yours truly, Dharmender Rai S/o Ram Narain M-[protected] Was this information helpful? | |
Aug 14, 2020 Complaint marked as Resolved | |
3 Comments | |
Comments
MY A/C NO LL15-2123 DIV NO. F/13, MATHURA ROAD, K. NO- [protected], MY METER IS RUNNING VERY FAST THAT WHY I WANT TO CHANGE MY METER. PLEASE DO AS SOON AS EARLIER
Reply
Regarind Meter Replacement
Dear Sir,
MY A/C NO LL15-2123 DIV NO. F/13, MATHURA ROAD, K. NO- [protected], MY METER IS RUNNING VERY FAST THAT WHY I WANT TO CHANGE MY METER. PLEASE DO AS SOON AS EARLIER
FROM GAFRULLAH KHAN
139, ASHOKA ENCLAVE PART-3
SECTOR-35
FARIDABAD
[protected]
Dear Sir,
MY A/C NO LL15-2123 DIV NO. F/13, MATHURA ROAD, K. NO- [protected], MY METER IS RUNNING VERY FAST THAT WHY I WANT TO CHANGE MY METER. PLEASE DO AS SOON AS EARLIER
FROM GAFRULLAH KHAN
139, ASHOKA ENCLAVE PART-3
SECTOR-35
FARIDABAD
[protected]
To,
DHBVN
This is is for your kind information that land lord of House No. 55A, Sector 11C, Faridabad (Haryana)- 121006 having very old model electrical energy meter and distributing electricity to their Tenant and a shopkeeper at commercial rates through advance model electronics meter. It is also observe that electricity unit consume by Main meter (Land lord meter) is less than the sum of electricity unit consumed by two sub energ meter. (almost half the sum of two submeter unit consume). It is happening since long time. Land lord also having itself Two AC one cooler, One water pump motor, old model Bulb etc electricity consuming instrument.
Please first analyse their electricity bill of last few years and than take necessary action.
DHBVN
This is is for your kind information that land lord of House No. 55A, Sector 11C, Faridabad (Haryana)- 121006 having very old model electrical energy meter and distributing electricity to their Tenant and a shopkeeper at commercial rates through advance model electronics meter. It is also observe that electricity unit consume by Main meter (Land lord meter) is less than the sum of electricity unit consumed by two sub energ meter. (almost half the sum of two submeter unit consume). It is happening since long time. Land lord also having itself Two AC one cooler, One water pump motor, old model Bulb etc electricity consuming instrument.
Please first analyse their electricity bill of last few years and than take necessary action.
19%
Complaints
893
Pending
0
Resolved
169
+91 124 232 2427
+91 124 230 1090
Infront Government Petrol Pump, Mehrauli Road, Gurgaon, Haryana, India - 122002