Having made aware of National & State Consumer redressal forums'orders today awarding Rs 1Lakh and penal costs to 2other residents in D wing Premier Residences Kurla, I am here by asking HDIL to pay me compensation for delay in posession of flat D1206 in Dec 2013. Failure to do so will invite a case precedence in all appropriate courts. Also HDIL is requested to show me proof that they had applied for an OC, Occupation Certificate & given a letter of discharge to the Association during Handover. We are still suffering in all A to K wing due to this and water supply problems & leakages in almost all flats.
Helpful
1 other people found this review helpful
1 found this helpful
Write a comment
Report
Copy

Post your Comment

    I want to submit Complaint Positive Review Neutral Comment
    code
    By clicking Submit you agree to our Terms of Use
    Submit
    N
    Naren2023
    Apr 20, 2023
    Report
    Copy

    Address: Mumbai
    Website: www.hdil.in

    Having made aware of National & State Consumer redressal forums'orders today awarding Rs 1Lakh and penal costs to 2other residents in D wing Premier Residences Kurla, I am here by asking HDIL to pay me compensation for delay in posession of flat D1206 in Dec 2013. Failure to do so will invite a case precedence in all appropriate courts. Also HDIL is requested to show me proof that they had applied for an OC, Occupatiin Certificate & given a letter of discharge to the Association during Handover.
    Helpful
    Found this helpful?
    Write a comment
    Report
    Copy

    Post your Comment

      I want to submit Complaint Positive Review Neutral Comment
      code
      By clicking Submit you agree to our Terms of Use
      Submit
      Hi
      I am Ansar and I bought a flat in paradise city in 2013 address below:
      A/102
      Sector 2 Bldg 18
      Paradise City Phase I
      I paid Rs. 3Lac to HDIL and Rs 75K for Stamp duty and registration.
      I have visited the site few times and the people in office always used to say. Work will start soon and they will send me letter. Last time I visited was in January 2019 and received the same reply. But then HDIL...
      Helpful
      6 other people found this review helpful
      6 found this helpful
      Write a comment
      Report
      Copy
      V
      vrngb
      Mar 18, 2021
      Report
      Copy

      Had booked flat in 2010 . Already paid around 12 lakhs . Possession promised in 2013, project appears to have been adandoned . Want to get back my money invested
      Helpful
      1 other people found this review helpful
      1 found this helpful
      Write a comment
      Report
      Copy

      Post your Comment

        I want to submit Complaint Positive Review Neutral Comment
        code
        By clicking Submit you agree to our Terms of Use
        Submit
        M
        Mukesh435
        from Pune, Maharashtra
        Dec 16, 2018
        Report
        Copy

        I had purchased a flat in paradise city, hdil palghar in dec 2010. The flat was supposed to be ready for possession by dec'2013 as per agreement. However there is practically no progress even after 8 years. There is no response from the builder on various email communication. I had visited the site last year and they cited various problems earlier resulting in delays. They said the problems are sorted out and it will not be built on full swing. However there is no further communication even after that. It seems they are suggest buing the time and have no intention to deliver the project, else how can it be not ready even after 8 years which was supposed to be delivered in 3 years. What recourse i have now?
        Helpful
        3 other people found this review helpful
        3 found this helpful
        Write a comment
        Report
        Copy

        Post your Comment

          I want to submit Complaint Positive Review Neutral Comment
          code
          By clicking Submit you agree to our Terms of Use
          Submit
          R
          Rahul Datar
          from Mumbai, Maharashtra
          Dec 3, 2018
          Report
          Copy

          Address: Mumbai City, Maharashtra

          I am rahul datar booked flat in whispering towers in october 2015 subsequently registration has been done in oct. 2018.
          Possession was committed as may 2018.
          However till date no further construction progress has been done.
          Hdil site is also sealed because of non payment of property tax.
          Recently 2moths back i got mail that hdil has paid dues of 34.5 crores of bank and property tax will be paid by oct. End.

          Can anybody update on recent developments
          Helpful
          Found this helpful?
          Write a comment
          Report
          Copy

          Post your Comment

            I want to submit Complaint Positive Review Neutral Comment
            code
            By clicking Submit you agree to our Terms of Use
            Submit
            J
            jaikishor2687
            from Mumbai, Maharashtra
            Feb 15, 2018
            Report
            Copy

            Address: Mumbai City, Maharashtra

            I have booked a three bhk flat in pardise city palghar in sector 6 wing c flat no. C-103, building no.3. Sale agreement was done on[protected]. Possession date as per agreement was[protected]. But still no possession given by company. I have send a written complaint to managing director, hdil company on[protected] but no reply recieved. The had stop the work of sector-6 since long. Possession of sector 1 is given but there is no shedule for sector 6 as per information recieved from site. Rera registration of project is p[protected] for sector-6. I have not recieved any information about the project. The company has to pay the interest on my paid amount or rent of flat since[protected]. Also may i know the date of actual possession being given as per rera registration. My mail id is [protected]@gmail.com.
            From jai kishor sharma
            Mob no. [protected], [protected]
            Helpful
            2 other people found this review helpful
            2 found this helpful
            Write a comment
            Report
            Copy

            Post your Comment

              I want to submit Complaint Positive Review Neutral Comment
              code
              By clicking Submit you agree to our Terms of Use
              Submit
              V
              vairagi yadav
              from Mumbai, Maharashtra
              May 5, 2017
              Report
              Copy

              Address: Mumbai City, Maharashtra, 400054

              Under the sra scheme my house was demolished in 2000 till the date the builder first gave termporay allotment the after that they told us to move so they can build the buildin there so they gave us rent on 11 months basis now its been 5 months now that the builder has not giving us any rent or temporary allotment and note that the place where our house was they built selling buildings and sold them now give me advice what should i do and i have adressed builder many times thats please give us something either rent or a temporary allotment but its of no use so give me advice what should i do now
              Helpful
              1 other people found this review helpful
              1 found this helpful
              Write a comment
              Report
              Copy

              Post your Comment

                I want to submit Complaint Positive Review Neutral Comment
                code
                By clicking Submit you agree to our Terms of Use
                Submit
                K
                Kiran Anchan
                Sep 14, 2016
                Report
                Copy

                Address: Mumbai City, Maharashtra, 400078

                This builder has promised a lot of people for flats and is now not delivering as per the promise. They earlier promised to provide me my flat by Dec 2016 but the work has completely stopped since 1 year post my booking.. It seems the work is stopped since 7-8 years now. They demand money for what has been completed so far but they have no updated on the project completion. Every time I visited their office their sales staff gave me a different date when the work will start. These guys are just fooling customers and taking them for a ride.
                They also never informed of TDS to be deducted for their payment and also never provided accounts team contact even after sending 10 emails to their team. They are a very skeptical team and company to rely on. None of their staffs have any clue of when the work will start. They always hide information.
                Helpful
                Found this helpful?
                Write a comment
                Report
                Copy

                Post your Comment

                  I want to submit Complaint Positive Review Neutral Comment
                  code
                  By clicking Submit you agree to our Terms of Use
                  Submit
                  D
                  Dipti Sail
                  from Mumbai, Maharashtra
                  May 23, 2016
                  Report
                  Copy

                  Address: 400067
                  Website: www.hdil.in

                  We have booked a flat in HDIL, Palghar way back in 2011 which the builder promised to give possession by 2013. Till date we have not received possession of our flat even after registration. We have paid huge amount as and when as per their demand as per instalments letters, but there is absolutely no progress at site. Kindly look into the matter and take corrective actions.
                  I Sonal Makwana facing the same problem I am trying to contact people those who have invested in HDIL Project so that we can make a committee and can take some strict actions against it.
                  you can contact me on my Email ID: [protected]@gmail.com
                  Thanks and regards
                  --
                  Helpful
                  Found this helpful?
                  1 Comment
                  Report
                  Copy

                  Post your Comment

                    I want to submit Complaint Positive Review Neutral Comment
                    code
                    By clicking Submit you agree to our Terms of Use
                    Submit
                    R
                    razik khan
                    from Mumbai, Maharashtra
                    Dec 12, 2015
                    Report
                    Copy

                    Address: Mumbai City, Maharashtra, 400070

                    Dear team, My self Razik i am traying to get cable connection from last 20days at my home but hatway cable engineer has not coming for give connection at my home, when i called him he did not pick my call also i went your office for the same query they said you will get connection in 2 or 3 days but still no body will come from last 15days, kindly look into this the engineer name is Mahboob and the contact no is [protected]. awaiting for your possitive response regards Md Razik khan [protected]
                    Helpful
                    Found this helpful?
                    Write a comment
                    Report
                    Copy

                    Post your Comment

                      I want to submit Complaint Positive Review Neutral Comment
                      code
                      By clicking Submit you agree to our Terms of Use
                      Submit
                      A
                      ameen792001
                      Aug 17, 2015
                      Report
                      Copy

                      Address: Mumbai City, Maharashtra

                      I have booked flat in 2010 and done the registration, still no work has started nor giving any commitment for completion of project, giving all false information with very un professional manner, need help from government to help us.
                      I have booked flat in Majestic Tower
                      I don't know who is running this company they are least bothered I think daravi slum dwellers would have run this company better not gd management all I'll educated asses sitting in the group.
                      Why show profits when ur not bothered anything but ur lives. Most of them Shud go to jail instead o[censored]nitech direcyors.
                      Helpful
                      Found this helpful?
                      2 Comments
                      Report
                      Copy

                      Post your Comment

                        I want to submit Complaint Positive Review Neutral Comment
                        code
                        By clicking Submit you agree to our Terms of Use
                        Submit
                        N
                        nisha29
                        from Pune, Maharashtra
                        Jul 4, 2015
                        Report
                        Copy

                        Address: Mumbai City, Maharashtra

                        I booked a flat at Paradise city, Palghar. With the name HDIL which was well known for me, I kept a trust and seems its failing. I dreamt of my own home and booked a flat in December 2010. Possession date given was October 2013. Its now July 2015 and still I don't see any sort of activity at site for completion of project. I have invested around 8 lakhs by taking bank loan. Every month am paying thousands of rupees as interest on that. And I think that the amount is diverted to another project to make money by the developer like HDIL. Individually there was no response. So made a group. And we could see little more response by HDIL. But just the response is not acceptable. I need a home which I have dreamt for. Please let me know the status and the date of completion of project. Contact me at [protected]/ [protected] or by mail at nishant.[protected]@gmail.com. Am really frustrated with the way of the developer.
                        Helpful
                        Found this helpful?
                        Write a comment
                        Report
                        Copy

                        Post your Comment

                          I want to submit Complaint Positive Review Neutral Comment
                          code
                          By clicking Submit you agree to our Terms of Use
                          Submit
                          S
                          Safdar Ulde
                          from Bengaluru, Karnataka
                          Jun 23, 2015
                          Report
                          Copy

                          I sold my 3 properties to pay installments of hdil in time. i asked orally and by emails to hdil to inform me, if any delay in possession, so that i can delay sale of my properties. But these corrupted, selfish people didn't care to inform me. and i sold at throw away price. Later on prices increases drastically. I would have been earned handsome profit if sold later on. Due to hdil i suffered heavy loss aprox 75 lakhs.. But hdil didn't care to reply to atleast one of my hundreds of emails 4 years to complete but still waiting for possession. On site work is totally stopped. He is liar. Giving different excuses at different times from lack of sand to lack of labors. They have earned handsome by corruptions in previous govt time.But denying for compensation??
                          Helpful
                          Found this helpful?
                          Write a comment
                          Report
                          Copy

                          Post your Comment

                            I want to submit Complaint Positive Review Neutral Comment
                            code
                            By clicking Submit you agree to our Terms of Use
                            Submit
                            M
                            Manuni Shah Pitale
                            from Mumbai, Maharashtra
                            Jun 12, 2015
                            Report
                            Copy

                            Address: Mumbai City, Maharashtra

                            We have booked flat in HDIL paradise palghar in 2010.we were said we will be getting the possession in 2012..but till date we have not got any update on the possession.every time we go and speak to their sales team they tell us they will revert us back or we will get a call from mumbai team...In 2011 they had sent a letter of installment payment when we asked why it has given a short notice to pay so their answer was we are finishing work very fast so complete your payment...but till date there is no progress is work...government has already announced of there is dealy in possession the builder has to refund 12% from the total amount...Enough is enough we need our flat or our money back...HDIL is a fraud builder we are very middle class people all our saving we have blocked in Hdil property..we need a help if somebody filing case against HDIL do let me know we can file together...
                            Helpful
                            Found this helpful?
                            Write a comment
                            Report
                            Copy

                            Post your Comment

                              I want to submit Complaint Positive Review Neutral Comment
                              code
                              By clicking Submit you agree to our Terms of Use
                              Submit
                              A
                              AquibA
                              May 26, 2015
                              Report
                              Copy

                              Address: Mumbai City, Maharashtra

                              We bought one flat 3 year ago, paid 85% money as they promise to deliver in 2012 dec. not it over 3 year late and they demanding over 1 Lac more in name of interest on service tax. how to sue builder for late possesion and get damages. lets get unite and go to court against them teaching them a lesson Galaxy appartment kurla east Hdil builders email me at aquibansari at yahoo dot com
                              Helpful
                              Found this helpful?
                              Write a comment
                              Report
                              Copy

                              Post your Comment

                                I want to submit Complaint Positive Review Neutral Comment
                                code
                                By clicking Submit you agree to our Terms of Use
                                Submit
                                N
                                Nipad
                                from Mumbai, Maharashtra
                                Apr 25, 2015
                                Report
                                Copy

                                Address: Mumbai City, Maharashtra

                                1. Delay in Allotment of Flat BOOKED in ‘HDIL PARADISE CITY’ Plagarh West. 2. As per clause 33 on page 17 of the Agreement, the date of possession of the flat allotted to me is indicated as 13/12/2015, however, hitherto, HDIL has not given me the possession of the said flat due to the very obvious fact, that the construction has not progressed beyond the first slab. In fact the construction work appears to have stopped for years together. 3. All the installments and any other payments as and when demanded by HDIL have been paid by me promptly, and without any sort of delay whatsoever. You can see that from your records. 4. HDIL has neither informed me about the delay in the construction work, nor has HDIL informed me about the reasons thereof. 5. From personal visit to the site it is seen that there is no construction activity taking place for the building in which the flat that was allotted to me. I visited the site on earlier occasions and enquired from the staff there as to when I would get the demand notice for the next installment and they used to answer like trained parrots “within the next two months”. This was the one and only answer I got. The demand never came of course since the construction was not progressing at all. At the time of booking Mr Noel told me that once the plinth was ready, within every 21 days thereafter the next slab would be ready. That sounded really fascinating !!!. What a tall projection. I failed to sense that it was too good to be true, but since I was dealing with HDIL I got carried away or - fooled/taken for a ride so to say. 6. I want to be informed about:- i) Does HDIL have any intention at all of giving me the possession of my flat; and if yes by when? ii) The reasons for HDIL delaying granting possession of the flat allotted to me, and also the reasons for having kept me in the dark about the Non progression of the construction work. Had I been informed about this inordinate delay I could have taken corrective measures, as laid down in the agreement. iii) Will HDIL compensate me for the huge delay in giving possession (ie. if possession is given at all)? What, and how much will be the compensation? iv) Why are my mails not being replied to?
                                pl email your flat details on [protected]@yahoo.com. get connected on wahtsapp [protected].
                                Helpful
                                Found this helpful?
                                1 Comment
                                Report
                                Copy

                                Post your Comment

                                  I want to submit Complaint Positive Review Neutral Comment
                                  code
                                  By clicking Submit you agree to our Terms of Use
                                  Submit
                                  A
                                  Altafjamadar
                                  from Mumbai, Maharashtra
                                  Apr 14, 2015
                                  Report
                                  Copy

                                  Address: Mumbai City, Maharashtra

                                  HDIL HDIL HDIL...NAME IT I HAVE SEEN NOT A SINGLE PROJECT OF THIS REPUTED BUILDER FOR NAME SAKE IF WE HAVE TO SAY IT HAS COMPLETED PROJECT IN TIME. WE HAVE BOOKED FLAT IN HDIL PARADISE CITY PALGHAR AND ALSO HAVE FORMED A GROUP OF APPROX 100 FLAT MEMBERS..WE WERE ASSURED THAT PROJECT WOULD COMPLETE BY END 2013, BUT YET OUR RECENT VISIT TO SIGHT ON 12TH APRIL 2015 WE STILL SEE THE SAME ...NO CHANGES... WE HAD MEETING WITH HDIL REPRESENTATIVE AT SIGHT WITH OUR GROUP OF 35 PEOPLE FOR 2 HOURS AND THEN FINAL DECISION WAS MADE ON 17TH MAY SENIORS WOULD MEET US AT SIGHT AND SOLVE OUR ISSUSES. AFTER THE MEETING WAS COMPLETE AND WE WERE ABOUT TO LEAVE ONE PERSON FROM HDIL WHO JUST APPEARED FROM OUTSIDE AND HAD COME IN STARTED ABUSING US AND ALSO THREATENING THAT IF WE DONT LEAVE THEN WE WILL BE PUSHED OUT WHICH HE ALSO DID AND PUSHED SOME O[censored]S AND CALLING SECURITY PEOPLE... WE WANT TO KNOW THAT IF HDIL HAS GONE TO A LEVEL OF KEEPING GOONDAS...JUST BECUASE WE ARE DEMANDING OUT FLATS AND WHY ARE WE PENALISED... IT HAS BEEN THE WORST EXPERIENCE OF KNWOING SUCH BUILDER WHO FAILS WITH HIS COMMITMENTS. VERY SIMPLET TO SAY" AGAR PAISA NAHI HAI THO GHAR BANANE KYUN CHALA HDIL" SOME ONE HAS TO TAKE THIS SERIOUSLY...AS IF IT WAS FOR ONE PROJECT THEN THINGS ARE UNDERSTANDABLE BUT HERE IT IS EVERY PROJECT THEY ARE DOING THE SAME.. NEED SOME ASSIST AND HELP... HELP HELP HELP THANKS/REGARDS ALTAF
                                  HDIL BUILDER TAKING COMMON PEOPLE FOR RIDE
                                  taru_123's reply, May 21, 2018
                                  did you file FIR against the builder? if u would have a complaint against the HDIL Builder then he has no rights to abuse the investors I have also invested in this project and trying to find out people those who have invested in this project so that we all can take legal actions against it.
                                  Helpful
                                  Found this helpful?
                                  1 Comment
                                  Report
                                  Copy

                                  Post your Comment

                                    I want to submit Complaint Positive Review Neutral Comment
                                    code
                                    By clicking Submit you agree to our Terms of Use
                                    Submit
                                    N
                                    nazhr
                                    from Bengaluru, Karnataka
                                    Apr 3, 2015
                                    Report
                                    Copy

                                    HDIL IS FLOP BUILDER IN MUMBAI

                                    Address: Mumbai City, Maharashtra

                                    HI THIS IS NAZHAR KHAN I HAVE BOUGHT THE FLAT AT GALAXY APARTMENT -- B -WING PROJECT BY H D I L THEY HAVE COMMITED ME THAT YOU WILL GET THE POSSESSION BY DECEMBER 2011 BUT THEY HAVE FAILED TO DO SO AND AFTER LONG WAIT POSSESION IS GIVEN TO ME NOW THEY ARE CHARGING THE MAINTAINCE AMOUNT IS VERY HIGH FOR MIDDLE CLASS PEOPLE i.e RS 7 PER SQ.FT AND PLUS SERVICE TAX ....
                                    Helpful
                                    Found this helpful?
                                    1 Comment
                                    Report
                                    Copy
                                    S
                                    s.sawant
                                    Mar 26, 2015
                                    Report
                                    Copy

                                    Address: Thane, Maharashtra

                                    we have booked a flat with HDIL in 2011 after 4 years of waiting we are yet not handed over possession of flat booked and on the contrary they are pressurizing us to pay 10 lakhs more and buy another flat in their complex as they can't deliver the possession of flat booked due to some pwd matters. Totally fraud and bunch of cheaters. Is any one interested in pursuing a case against this frauds will work together. s.sawant
                                    Helpful
                                    Found this helpful?
                                    Write a comment
                                    Report
                                    Copy

                                    Post your Comment

                                      I want to submit Complaint Positive Review Neutral Comment
                                      code
                                      By clicking Submit you agree to our Terms of Use
                                      Submit
                                      S
                                      s.sawant
                                      Mar 26, 2015
                                      Report
                                      Copy

                                      Address: Thane, Maharashtra

                                      we have booked a flat with HDIL in 2011 after 4 years of waiting we are yet not handed over possession of flat booked and on the contrary they are pressurizing us to pay 10 lakhs more and buy another flat in their complex as they can't deliver the possession of flat booked due to some pwd matters. Totally fraud and bunch of cheaters. Is any one interested in pursuing a case against this frauds will work together. s.sawant

                                      work not completed

                                      Dear sir iam seema KGoyal I booked a flat in hail Palghar in 2011.and registration completed in 2013.till now hdil not handed over the flat plz do some needful my mob is [protected]
                                      Helpful
                                      Found this helpful?
                                      1 Comment
                                      Report
                                      Copy

                                      Post your Comment

                                        I want to submit Complaint Positive Review Neutral Comment
                                        code
                                        By clicking Submit you agree to our Terms of Use
                                        Submit
                                        S
                                        santosh kamble
                                        from Mumbai, Maharashtra
                                        Feb 15, 2015
                                        Report
                                        Copy

                                        Address: Mumbai City, Maharashtra

                                        I book a flat at palghar HDIL project on October-2011. My registration of the flat is alreadt completed. The builder given the possession dt in agreement 30.06.2014. Yet i had not geting the possession. There is construction work is closed since last to many days. Now i am in tense what to do, sir plz advise me what to do.
                                        Helpful
                                        Found this helpful?
                                        Write a comment
                                        Report
                                        Copy

                                        Post your Comment

                                          I want to submit Complaint Positive Review Neutral Comment
                                          code
                                          By clicking Submit you agree to our Terms of Use
                                          Submit
                                          A
                                          Amit Warang
                                          from Mumbai, Maharashtra
                                          Apr 16, 2014
                                          Resolved
                                          Report
                                          Copy
                                          Resolved

                                          Address: Thane, Maharashtra

                                          I Have purchased a flat in Residency Park Phase -1.It has been observed that the water supply provided for domestic use & toilet use are from different tanks & the connections are different. The building administration(HDIL) department has decided to provide water to tenants only twice in a day for 2 hrs in morning & 2 hrs in evening. It means the toilet flushing system, Jet spray & toilet tap can not be used when there is no water. We can store the water for domestic use but what about the flushing system. How can a family leave without using a toilet for whole day? How can administration department can take such decisions without informing tenants? I request to the concern department to take the necessary actions & the water should provide for 24 hrs at least for toilet system. Otherwise the matter will be taken to consumer court.
                                          Aug 14, 2020
                                          Complaint marked as Resolved 
                                          I have purchased the flat in Residency building. I am not getting any tenants for rental basis from last 1 year due to lack of drinking water. Even thou HDIL is well known builder but not able to provide many of the facilities promised by them, one of them is basic water. Till this time they have not the got water connectivity from the Municipal corporation for the flat. If it is not possible in near future they should think about alternative arrangement. I suggest all the flat owners should put a case against the HDIL in the court.
                                          Helpful
                                          Found this helpful?
                                          1 Comment
                                          Report
                                          Copy

                                          Post your Comment

                                            I want to submit Complaint Positive Review Neutral Comment
                                            code
                                            By clicking Submit you agree to our Terms of Use
                                            Submit
                                            B
                                            B Y Kaintura
                                            from Mumbai, Maharashtra
                                            Feb 20, 2014
                                            Resolved
                                            Report
                                            Copy
                                            Resolved

                                            Address: Mumbai City, Maharashtra

                                            I had book a flat at Palghar- Paraside City- Sec IV Building 13 Wing B, third floor- 303 on 17.04.11. At the time of booking the flat was promised after two years. But even after two years the flat is still not ready. I have already paid HDIL Rs. 4, 26, 466/- including service tax. I gave letter to HDIL, Bandra on 07.02.13 requesting to cancell the booking and refund the said amount. I was told it will take 3-4 months for arranging the funds. After that I repeatedly called them and personally visited the premises but still the refund is yet to come. No response or any letter/ call is coming from HDIL. Please help me in getting my funds. Mr. B.Y. Kaintura [protected] [protected]@rediffmail.com
                                            Aug 14, 2020
                                            Complaint marked as Resolved 
                                            Dear Friends. need your support is raising our issues against the Builder HDIL whose flat in Kurla by name of premiere residencies we had bought in 2009 and were committed possession in 2011(some buyers even 2010).Its 2014 now and HDIL is now behaving in most malicious and greedy manner. after having sent letters for possession and payment of last dues. he has collected all money and just done a turn around saying now I want more money if you want your house under illegal and irrelevant cost heads. please review links of media on same and share and like them to voice our issues. Please refrain from any new projects of theirs and if you know of any friends stuck in same situation with HDIL ask them to join hands with us . we are now a 500+ protesting community.

                                            He is asking money in cash without any demand letter that is black money which will have no records and that too after payment of 100%. Chairman Rakesh Wadhwa has gone to extent saying buyers that Do whatever you all want, even court case takes more than 10 years .
                                            This is not only case in Premier, similar is case for all of his other projects, you name project his malicious intentions will be seen. POOR PEOPLE HAVE ALREADY CURSED CHAIRMAN AND STAKE HOLDERS

                                            <B>THIS IS AWARENESS CAMPAIGN FOR FRAUD BEING CARRIED OUT BY HDIL AND BEWARE OF HDIL THEY ARE BIG TIME FRAUD.
                                            YOUR SUPPORT WILL STRENGTHEN THE POOR MANS WAR AGAINST INJUSTICE .</B>

                                            http://www.mid-day.com/articles/kurla-premier-residences-project-builder-demands...
                                            http://www.mid-day.com/articles/kurla-building-issue-denied-possession-buyers-dr...
                                            http://www.mid-day.com/articles/give-us-our-new-homes-say-protestors/15050001
                                            http://www.youtube.com/watch?v=R0wjcgZRWlc
                                            https://www.youtube.com/watch?v=OuEL80JS7SM
                                            https://www.youtube.com/watch?v=9_9Fr6zrg2c
                                            https://www.youtube.com/watch?v=jbAqiVewUx8
                                            http://indianexpress.com/article/cities/mumbai/take-cognisance-of-home-buyers-pe...


                                            Please click and share. help us spread the word. please individually like and comment on links attached. liking my post won’t help!

                                            <B>PLEASE SHARE TO AS MANY PEOPLE AS POSSIBLE . BEAWARE OF HDIL . LET BILLIONS OF PEOPLE KNOW THE HURDLES TO REMOVE CORRUPTION .</B>
                                            better file a simple FIR n resolve your problem
                                            HDIL IS A CORRUPTED BUILDER.
                                            PRESENT GOVT MAY TAKE ACTION IF WE AGITATATE IN LARGE.
                                            Helpful
                                            Found this helpful?
                                            3 Comments
                                            Report
                                            Copy

                                            Post your Comment

                                              I want to submit Complaint Positive Review Neutral Comment
                                              code
                                              By clicking Submit you agree to our Terms of Use
                                              Submit
                                              C
                                              chheda jitendra
                                              from Mumbai, Maharashtra
                                              Dec 18, 2013
                                              Resolved
                                              Report
                                              Copy
                                              Resolved

                                              HDIL has failed in giving possession of flats in time, on enquire they says still it will take 18 more months for possession, mean while without any construction work in progress they are demanding again & again for payment with threats of forfeiting the paid amount if the payment is not made in 3 to 7 days, how to pay and on what grounds that they are not ready to clarify, nither they are ready to talk on phone or nor ready to reply our letters, according to their registered agreements clause 32 says that as per section 8 of Maharashtra ownership of Flats if possession not given in stipulated date or any written extension there after promoter has to refund entire paid amount with interest, now the quotation is HDIL is rudely refusing to refund the amount with interest as per the Claus 32 of their agreement. in that case all the peoples who have booked the flats in HDIL - Paradise City, come together form a consumer forum and file a suit against HDIL in consumer court. so that any concrete steps can be taken against promoters and force them to refund the entire amount with interest. right now everyone is fighting individual war for their rights, everyone can come under one roof and we can fight for our hard earn money. some one knowledgeable can launch a website and gather all consumers of Paradise City under one roof to save everyone from mental touchier
                                              Aug 14, 2020
                                              Complaint marked as Resolved 
                                              Dear Friends. need your support is raising our issues against the Builder HDIL whose flat in Kurla by name of premiere residencies we had bought in 2009 and were committed possession in 2011(some buyers even 2010).Its 2014 now and HDIL is now behaving in most malicious and greedy manner. after having sent letters for possession and payment of last dues. he has collected all money and just done a turn around saying now I want more money if you want your house under illegal and irrelevant cost heads. please review links of media on same and share and like them to voice our issues. Please refrain from any new projects of theirs and if you know of any friends stuck in same situation with HDIL ask them to join hands with us . we are now a 500+ protesting community.

                                              He is asking money in cash without any demand letter that is black money which will have no records and that too after payment of 100%. Chairman Rakesh Wadhwa has gone to extent saying buyers that Do whatever you all want, even court case takes more than 10 years .
                                              This is not only case in Premier, similar is case for all of his other projects, you name project his malicious intentions will be seen. POOR PEOPLE HAVE ALREADY CURSED CHAIRMAN AND STAKE HOLDERS

                                              <B>THIS IS AWARENESS CAMPAIGN FOR FRAUD BEING CARRIED OUT BY HDIL AND BEWARE OF HDIL THEY ARE BIG TIME FRAUD.
                                              YOUR SUPPORT WILL STRENGTHEN THE POOR MANS WAR AGAINST INJUSTICE .</B>

                                              http://www.mid-day.com/articles/kurla-premier-residences-project-builder-demands...
                                              http://www.mid-day.com/articles/kurla-building-issue-denied-possession-buyers-dr...
                                              http://www.mid-day.com/articles/give-us-our-new-homes-say-protestors/15050001
                                              http://www.youtube.com/watch?v=R0wjcgZRWlc
                                              https://www.youtube.com/watch?v=OuEL80JS7SM
                                              https://www.youtube.com/watch?v=9_9Fr6zrg2c
                                              https://www.youtube.com/watch?v=jbAqiVewUx8
                                              http://indianexpress.com/article/cities/mumbai/take-cognisance-of-home-buyers-pe...


                                              Please click and share. help us spread the word. please individually like and comment on links attached. liking my post won’t help!

                                              <B>PLEASE SHARE TO AS MANY PEOPLE AS POSSIBLE . BEAWARE OF HDIL . LET BILLIONS OF PEOPLE KNOW THE HURDLES TO REMOVE CORRUPTION .</B>
                                              pl email your flat details on [protected]@yahoo.com. get connected on wahtsapp [protected]
                                              pl email your flat details on [protected]@yahoo.com. get connected on wahtsapp [protected]
                                              I had purchased a flat in Paradise CIty, HDIL Palghar in Dec 2010. The flat was supposed to be ready for possession by Dec'2013 as per agreement. However there is practically no progress even after 8 years. There is no response from the builder on various email communication. I had visited the site last year and they cited various problems earlier resulting in delays. They said the problems are sorted out and it will not be built on full swing. However there is no further communication even after that. It seems they are suggest buing the time and have no intention to deliver the project, else how can it be not ready even after 8 years which was supposed to be delivered in 3 years. What recourse I have now?
                                              Helpful
                                              Found this helpful?
                                              4 Comments
                                              Report
                                              Copy

                                              Post your Comment

                                                I want to submit Complaint Positive Review Neutral Comment
                                                code
                                                By clicking Submit you agree to our Terms of Use
                                                Submit
                                                V
                                                vin_soft
                                                from Mumbai, Maharashtra
                                                Dec 16, 2013
                                                Resolved
                                                Report
                                                Copy
                                                Resolved

                                                Address: Thane, Maharashtra

                                                I have done agreement with hdil for 2 bhk flat where hdil has agreed in the agreement and As per the agreement clause 8 and clause 32 that if they delay the possession the purchaser has the right to terminate the agreement and get entire amount refunded which i have paid as instalments with 12 % interest which now they are rudely refusing. It seems that the HDIL is cheating and i want to file a suit in consumer and pray for my legal right of getting my refund with 12% interest pl help
                                                Aug 13, 2020
                                                Complaint marked as Resolved 
                                                Dear Friends. need your support is raising our issues against the Builder HDIL whose flat in Kurla by name of premiere residencies we had bought in 2009 and were committed possession in 2011(some buyers even 2010).Its 2014 now and HDIL is now behaving in most malicious and greedy manner. after having sent letters for possession and payment of last dues. he has collected all money and just done a turn around saying now I want more money if you want your house under illegal and irrelevant cost heads. please review links of media on same and share and like them to voice our issues. Please refrain from any new projects of theirs and if you know of any friends stuck in same situation with HDIL ask them to join hands with us . we are now a 500+ protesting community.

                                                He is asking money in cash without any demand letter that is black money which will have no records and that too after payment of 100%. Chairman Rakesh Wadhwa has gone to extent saying buyers that Do whatever you all want, even court case takes more than 10 years .
                                                This is not only case in Premier, similar is case for all of his other projects, you name project his malicious intentions will be seen. POOR PEOPLE HAVE ALREADY CURSED CHAIRMAN AND STAKE HOLDERS

                                                <B>THIS IS AWARENESS CAMPAIGN FOR FRAUD BEING CARRIED OUT BY HDIL AND BEWARE OF HDIL THEY ARE BIG TIME FRAUD.
                                                YOUR SUPPORT WILL STRENGTHEN THE POOR MANS WAR AGAINST INJUSTICE .</B>

                                                http://www.mid-day.com/articles/kurla-premier-residences-project-builder-demands...
                                                http://www.mid-day.com/articles/kurla-building-issue-denied-possession-buyers-dr...
                                                http://www.mid-day.com/articles/give-us-our-new-homes-say-protestors/15050001
                                                http://www.youtube.com/watch?v=R0wjcgZRWlc
                                                https://www.youtube.com/watch?v=OuEL80JS7SM
                                                https://www.youtube.com/watch?v=9_9Fr6zrg2c
                                                https://www.youtube.com/watch?v=jbAqiVewUx8
                                                http://indianexpress.com/article/cities/mumbai/take-cognisance-of-home-buyers-pe...


                                                Please click and share. help us spread the word. please individually like and comment on links attached. liking my post won’t help!

                                                <B>PLEASE SHARE TO AS MANY PEOPLE AS POSSIBLE . BEAWARE OF HDIL . LET BILLIONS OF PEOPLE KNOW THE HURDLES TO REMOVE CORRUPTION .</B>
                                                FIR against top brass of HDIL for failing to hand over Kurla flatsBy Mustafa shaikh & Chaitanya Marpakwar, Mumbai Mirror | Apr 7, 2014, 10.53 AM IST16comments0inShareShare MoreAAAfter
                                                waiting for over three years to gain possession of their flats, home
                                                buyers of a Kurla project have taken a top developer to task. On
                                                Tuesday, an FIR was registered against senior executives of Housing
                                                Development and Infrastructure Limited (HDIL), for failing to give
                                                possession to people who bought flats in their Premier Residences
                                                project at Kurla (W), allegedly after taking full payment from them.
                                                The FIR was registered against HDIL on a complaint by Shabnam
                                                Latliwala, one of the buyers, at Vinoba Bhave Nagar Police Station under
                                                Sections 420 (cheating) of the IPC, and other relevant sections of the
                                                Maharashtra Ownership of Flats Act, for failing to give possession of
                                                her flat despite taking money from her. The company's top officials,
                                                Rakesh Kumar Wadhwa, Sarang Wadhwa, Waryam Singh, Ashok Gupta and
                                                Gurmeet Singh are named in the FIR. Latliwala, an advocate,
                                                said, "In 2009 I paid the total amount of around Rs 55 lakh to HDIL for a
                                                965 sq ft flat. They asked for an additional Rs 43, 000 as advance
                                                maintenance, which I also paid. Despite that, the flat was not handed
                                                over." According to her complaint, HDIL constructed 1, 000 flats
                                                in the mega housing complex at LBS Marg. HDIL promised possession by
                                                2010, but most buyers claim they have not been given possession. In
                                                January this year, around 400 buyers protested the delay at HDIL's head
                                                office in Bandra (E), and in February Laltiwala filed a written
                                                complaint with the police after talks with the company failed. However,
                                                as the police did not register an FIR then, some buyers filed a writ
                                                petition in High Court. At the hearing last month, HC directed the authorities to take cognizance of the complaints.
                                                "We met HDIL's top brass and sought possession of flats. But they asked
                                                us to pay an additional sum saying that the area of the flats had
                                                increased. I was asked to pay around Rs 7 lakh more in cash. I had taken
                                                loan from a bank which already paid the final instalment. The
                                                architects, BIDCO Engineering Division, had also issued a completion
                                                certificate stating the building is ready, " the FIR reads. Latliwala
                                                added that over 40 complaints have been filed against HDIL with the
                                                police. "The dreams of a thousand home owners are at stake, as
                                                HDIL is withholding possession while most buyers are paying EMI of bank
                                                loans, " said A K Chowdhary, another buyer. Like him, most people bought
                                                flats following newspaper advertisements in 2009, that said HDIL was
                                                offering affordable flats for alimited period. The police have
                                                said they will probe the matter and submit a report to High Court. "An
                                                FIR has been registered. We will carry out an investigation and submit a
                                                report to the court, " said Senior Inspector Subhash Raut of Vinoba
                                                Bhave Nagar Police Station. HDIL, on their part, maintain they
                                                have been handing over possession to buyers who made full payment. "The
                                                process of handing over flats commenced as scheduled and we have already
                                                handed over 289 flats to those who paid the entire agreement amount. We
                                                have served interest letters to customers who defaulted on scheduled
                                                payments. These demand letters for due payments are being raised as per
                                                the agreements with home buyers. This is just mischievous and malicious
                                                propaganda against the company. Since the matter is sub-judice, we do
                                                not wish to respond to any allegations, " a statement from HDIL said.
                                                Helpful
                                                1 other people found this review helpful
                                                1 found this helpful
                                                2 Comments
                                                Report
                                                Copy

                                                Post your Comment

                                                  I want to submit Complaint Positive Review Neutral Comment
                                                  code
                                                  By clicking Submit you agree to our Terms of Use
                                                  Submit
                                                  N
                                                  nilesh.bhatt
                                                  from Delhi, Delhi
                                                  Nov 19, 2013
                                                  Resolved
                                                  Report
                                                  Copy
                                                  Resolved

                                                  refund the money

                                                  Address: Thane, Maharashtra

                                                  I booked a flat in Paradise Park, HDIL project at Palghar, Dist. Thane in December 10 & paid installments regularly. At the time of booking they promise us to give the possession in 2012 in mid July. After several mails/phone calls but no reply of my mails as wel as my calls. After that we go personally at Palghar site but not recd the proper reply from the concerned. Again we go personally in March 2013 & talked Mr. Sandip, HDIL....
                                                  Helpful
                                                  Found this helpful?
                                                  1 Comment
                                                  Report
                                                  Copy
                                                  C
                                                  chheda jitendra
                                                  from Mumbai, Maharashtra
                                                  Nov 7, 2013
                                                  Resolved
                                                  Report
                                                  Copy
                                                  Resolved

                                                  Address: Thane, Maharashtra

                                                  According to the agreement possestion of flates were to be given in October'2013. which they have failed to give on time, looking to the construction work on site still many of the buildings have not reached till plinth level work also, but still they are telling to make the payment and promissing that the possestion of flats will be given in next six months, which looking to the work is next to immposible, in that case cant payment be done on possession to secure our hard earn money, HDIL has failed to give possesion in time so how they can be penalised for the false commitments. in indian law is there any action can be taken by government to provide safe side to customer intrest and hard earned money. some pics are taken just a month back for your rewie whose possetion was to be given in october'2013.
                                                  +3 photos
                                                  Aug 14, 2020
                                                  Complaint marked as Resolved 
                                                  file a case in the court consumer/civil i think HDIL has the habit of cheating people there company should be closed down by diverting customers away from them and making the public aware about there nonsense. we all have to become one and ask them refund by filing a petition against them.these kind of cheaters would be dragged to court of law to stop this cheating publicly
                                                  Can some one who is in website development can start a website "PARADISE CITY - PALGHAR CONSUMERS FORUM" were all Flat/shops purchaser can register themselves and come under one roof and take some decession what to do further? How too takeup the matter ? fight for our rights and hard earn money. be united to fight for our rights.
                                                  I have booked1 BHK flat in HDIL-Galaxy, Kurla in 2009, At the time of booking they have confirmed about possession in Mar-12.I invested my hard earned money in this project, taken load, but the work at site is stopped from so many months, there is no communication 4m HDIL, why this work stopped ?, when this will start ? when we will get our possession ?
                                                  I had purchased a flat in Paradise CIty, HDIL Palghar in Dec 2010. The flat was supposed to be ready for possession by Dec'2013 as per agreement. However there is practically no progress even after 8 years. There is no response from the builder on various email communication. I had visited the site last year and they cited various problems earlier resulting in delays. They said the problems are sorted out and it will not be built on full swing. However there is no further communication even after that. It seems they are suggest buing the time and have no intention to deliver the project, else how can it be not ready even after 8 years which was supposed to be delivered in 3 years. What recourse I have now?
                                                  Helpful
                                                  Found this helpful?
                                                  4 Comments
                                                  Report
                                                  Copy

                                                  Post your Comment

                                                    I want to submit Complaint Positive Review Neutral Comment
                                                    code
                                                    By clicking Submit you agree to our Terms of Use
                                                    Submit
                                                    A
                                                    Ashpra
                                                    Sep 25, 2013
                                                    Resolved
                                                    Report
                                                    Copy
                                                    Resolved

                                                    I have booked a flat in HDIl première residence,we were promised possession in Dec2012,however have just received our house for possession after 3 years.Now the builder insists we pay Rs 4 lacs as car mandatory car park! We so not have a vehicle and do not need a parking as of now! Also club house,children's play area ,etc were to be a part of his development, and they havent provided with these services, The government should look into this matter and penalise these builders for cheating the common man of his money!
                                                    Aug 14, 2020
                                                    Complaint marked as Resolved 
                                                    HDIL customer support has been notified about the posted complaint.
                                                    Helpful
                                                    Found this helpful?
                                                    Write a comment
                                                    Report
                                                    Copy

                                                    Post your Comment

                                                      I want to submit Complaint Positive Review Neutral Comment
                                                      code
                                                      By clicking Submit you agree to our Terms of Use
                                                      Submit
                                                      V
                                                      venki.142000
                                                      from Mumbai, Maharashtra
                                                      Feb 5, 2013
                                                      Resolved
                                                      Report
                                                      Copy
                                                      Resolved

                                                      Address: Maharashtra

                                                      I Have booked flat in HDIL Palghar,Paradise City in January 2011,Possesion date was given Mid of the year 2012,But till now only plinth work is done.
                                                      After asking they say there are so many flats which we give together i really dont understand what they mean.
                                                      I doubt they have some permission issue,or local Political issue or money matters dont know please look into it as now they say possesion will be in end of 2013 which is also not confirmed.
                                                      Now am fedup and planing to sell this flat if its getting so much delayed.
                                                      Other HDIL Palghar flat bookers please join with me we will fight together to get the justice.

                                                      Regards
                                                      Venkatesh
                                                      Aug 13, 2020
                                                      Complaint marked as Resolved 

                                                      HDIL — DELAY IN POSSESSION

                                                      THE BUILDER HAS TAKEN 85% OF THE PAYMENT WITH A PROMISE OF POSSESSION IN DEC 2011, BUT SINCE LAST 6 MONTHS THE WORK IS STAND STILL AND NOW THE BUILDER IS SAYING IT WILL TAKE 1 MORE YEAR TO FINISH THE WORK AFTER RESUMPTION,

                                                      PLEASE ADVISE.

                                                      THANKS
                                                      taru_123's reply, May 21, 2018
                                                      I Sonal Makwana facing the same problem. I am trying to contact people those who have invested in HDIL Project so that we can make a committee and can take some serious actions against it.
                                                      you can contact me on my Email ID: [email protected]
                                                      thanks and regards
                                                      ---
                                                      No Progress in Palghar Project, it will delay the possession by one more year, cant say more than that also, work has started with 20-25 workers for such a huge project, it seems they want to grab the money from customers they are showing a jalak of construction work going on if it goes in this manner we cant get possession in 2016 also. its a request to all consumers to stop the balance payment right now and pay the entire amount on possession for safer side.

                                                      Very Much Delay in Possession and construction - Comment #1900692 - Image #0
                                                      Very Much Delay in Possession and construction - Comment #1900692 - Image #1
                                                      Very Much Delay in Possession and construction - Comment #1900692 - Image #2
                                                      regarding palghar project paradise city file a case in the court consumer/civil i think HDIL has the habit of cheating people there company should be closed down by diverting customers away from them and making the public aware about there nonsense. we all have to become one and ask them refund by filing a petition against them.these kind of cheaters would be dragged to court of law to stop this cheating publicly
                                                      I am victim of HDIL.same complain that booked flat in2010, promise for possession in 2013, now nobody resond.HDIL is cheater.we should file FIR against HDIL.
                                                      R.K.Shah
                                                      taru_123's reply, May 21, 2018
                                                      I am trying to contact those people who have invested in HDIL paradise city Project so that we all can make a committee and can take some strict actions against it. I have also booked 2flats and 1 shop in sector 2 in 2010 till now I haven't got possession which was supposed to get in 2012.
                                                      you can contact me on my Email Id [email protected]
                                                      Hi,
                                                      I have booked the flat in 2 BHK flat in Dec 2010. They said they will give possession in Oct 2013. I have given 20% amount and from last 2 year they didn't ask for further installment. Whenever I called they say in next 4 month they will ask for next installment. If today they start work in full swing it will take 2 year to complete the project. I think they will not give flat before 2017.

                                                      They are defenitely in some big trouble that they are not disclosing. We should file FIR.

                                                      Some silly answer given by HDIL
                                                      1. All workers are busy at Virar site(Jan 2012)
                                                      2. We will start full swing work after mansoon(2012)
                                                      3. Villagers are not giving water for construction(Jan 2013)
                                                      4. So many flat need to built.
                                                      5. We are giving possession of sec1 in Dec 2014 then will start work of remaining sector


                                                      Regards,
                                                      Rajesh Sahu
                                                      taru_123's reply, May 21, 2018
                                                      Dear Rajesh Shahu
                                                      I am facing the same problem we can contact people those who have invested in HDIL Project so that we can make a committee and take some serious actions against it.
                                                      you can contact me on my Email id [email protected]
                                                      thanks and regards
                                                      --
                                                      Helpful
                                                      Found this helpful?