Ruparel Realty
1.8
Submit a Complaint
58
COMPLAINTS

Ruparel Realty Complaints & Reviews

D
Daksh Swami
Feb 24, 2025
Resolved
Report
Copy
Resolved

High maintenance charges

Address: Byculla, Mumbai

Ruparel amenities are excellent like the gym, rooftop pool, deck, etc. But maintenance charges are high. It’s a good choice for people who want lavish facilities but I feel they should make it more affordable. Kindly look into this....
Helpful
Found this helpful?
Write a comment
Report
Copy
A
AkashMane78
Feb 17, 2025
Resolved
Report
Copy
Resolved

Waiting for my flat possession

Address: Malad West, Mumbai

I got a good deal during pre-launch. Thanks to the staff for providing all the details, floor plan, cost breakup properly. I just feel the construction is taking more time, expected it to be faster. They are actively working on site as of now so I hope they complete it on time without delays....
Helpful
Found this helpful?
Write a comment
Report
Copy
C
Chinmay Dubey
Feb 12, 2025
Resolved
Report
Copy
Resolved

Timelines should be followed

Address: Malad West, Mumbai

I booked a flat with Ruparel a couple of years back. The project looked promising but the waiting period was longer than expected and I had to push for updates on the progress. Now that the building is almost ready and seeing the quality of construction and finishing, I feel my investment is secure. Just wish they kept the initial timeline as promised....
Helpful
1 other people found this review helpful
1 found this helpful
Write a comment
Report
Copy
D
Dipankar kabir
Feb 10, 2025
Resolved
Report
Copy
Resolved

Buying process is not smooth

Address: Santacruz, Mumbai

The project itself is good with spacious flats, good connectivity and luxurious amenities. But the journey was not smooth. There was a delay in getting possession and I had to change some of my plans. I had to make a few visits to their office to clarify certain charges that could have been avoided if everything had been explained clearly in the beginning. Now I am finally settled in and can say the end product was worth it. The only thing...
Helpful
2 other people found this review helpful
2 found this helpful
Write a comment
Report
Copy
J
Jivika Gaade
Feb 5, 2025
Resolved
Report
Copy
Resolved

Things could have been better

Address: Kandivali West, Mumbai

My experience was mixed. I loved the property design and location but the sales team did not inform me about some extra charges that popped up near possession. The flat itself is good and my family is happy with the space but clearer communication would have made it better....
Helpful
3 other people found this review helpful
3 found this helpful
Write a comment
Report
Copy
Y
Yogesh Asalkar
Jan 27, 2025
Resolved
Report
Copy
Resolved

Address: Dadar East, Mumbai

The flat interiors are well done but the common amenities are still under construction even after we moved in. The location is prime and I hope they finish the pending work soon because the gym and clubhouse are the main reasons I chose this property.
Feb 5, 2025
Complaint marked as Resolved 
Helpful
3 other people found this review helpful
3 found this helpful
Write a comment
Report
Copy

Post your Comment

    I want to submit Complaint Positive Review Neutral Comment
    code
    By clicking Submit you agree to our Terms of Use
    Submit
    P
    PinkysharmaPK
    Jan 22, 2025
    Resolved
    Report
    Copy
    Resolved

    The flat rates are decent and fit our budget. The only issue was with the registration process, which was time-consuming. I had to rush back and forth a lot as some things were not communicated to me. I understand it can happen but if the team had given clear instructions before, it would have been much easier and faster.
    Jan 28, 2025
    Complaint marked as Resolved 
    Helpful
    3 other people found this review helpful
    3 found this helpful
    Write a comment
    Report
    Copy

    Post your Comment

      I want to submit Complaint Positive Review Neutral Comment
      code
      By clicking Submit you agree to our Terms of Use
      Submit
      L
      Laxmi Padiya
      Jan 20, 2025
      Resolved
      Report
      Copy
      Resolved

      Maintenance work needs improvement

      I recently moved into my flat and the view is good. All interior work is done and the flooring is high quality. The only thing is that a few of the amenities are not yet functional and there are also maintenance issues. Please look into this and address our problems as soon as possible....
      Helpful
      3 other people found this review helpful
      3 found this helpful
      Write a comment
      Report
      Copy
      R
      Rittu Reddy
      Jan 16, 2025
      Resolved
      Report
      Copy
      Resolved

      I am happy with my flat’s design and the location as it is exactly what I wanted. However, some amenities took longer to get operational after we moved in, which was a bit unexpected. It would have been helpful if the team had informed us about this earlier. I hope this can be resolved soon.
      Jan 22, 2025
      Complaint marked as Resolved 
      Helpful
      3 other people found this review helpful
      3 found this helpful
      Write a comment
      Report
      Copy

      Post your Comment

        I want to submit Complaint Positive Review Neutral Comment
        code
        By clicking Submit you agree to our Terms of Use
        Submit
        S
        Sidharth65
        Jan 13, 2025
        Resolved
        Report
        Copy
        Resolved

        Staff needs more training

        I was impressed with the sample flat during my visit. It was better than I thought and the consultation was helpful, but I felt it was rushed. The staff could take a bit more time to guide buyers and address their doubts proactively. I had to ask multiple questions to get clarity....
        Helpful
        3 other people found this review helpful
        3 found this helpful
        Write a comment
        Report
        Copy
        J
        Jiya Johri
        Jan 11, 2025
        Resolved
        Report
        Copy
        Resolved

        Delayed possession time

        I booked a 2 BHK mainly for the location and the exciting project expectations. While the handover date was delayed by almost a year, the final product has been worth the wait. I am satisfied with my flat and the amenities, but improving timelines would make the experience even better....
        Helpful
        3 other people found this review helpful
        3 found this helpful
        Write a comment
        Report
        Copy
        A
        AmitNipane
        from Mumbai, Maharashtra
        Jul 22, 2024
        Report
        Copy

        Ruparel Zion & Other Ruparel Projects

        Address: Ruparel Iris, Matunga Road
        Website: ruparel.in

        FRAUD WARNING!!

        Don't buy any property in any Amit Ruparel's Ruparel Realty projects. He has a bad track record of not delivering projects on time.
        Firstly, their head office in Matumga Road Ruparel Iris is incomplete and without OC since past 10 years.
        I have myself purchased a flat in Ruparel Zion Sion for which possession was assured in September 2022 but we are still awaiting OC for the same in July 2024....
        Helpful
        3 other people found this review helpful
        3 found this helpful
        Write a comment
        Report
        Copy
        A
        Abujkhan
        from Mumbai, Maharashtra
        Sep 17, 2023
        Report
        Copy

        Address: Ruparel crest
        Website: Ruparel.com

        I wanted refund as soon as possible which was as token
        Helpful
        4 other people found this review helpful
        4 found this helpful
        Write a comment
        Report
        Copy

        Post your Comment

          I want to submit Complaint Positive Review Neutral Comment
          code
          By clicking Submit you agree to our Terms of Use
          Submit
          I
          iamShishir
          from Mumbai, Maharashtra
          Sep 8, 2023
          Report
          Copy

          Ruparel Zion

          Website: ruparel.in

          Flat booked in 2021 with assurance that it will be completed by December 2021. The builder went on raising demands and eventually 100% payments made. There is no clarity on OC / final possession date.

          They are forcing us to take fit-out possession without even completing the delivery and conveniently ignore any queries relating to OC.

          Fraud company - do not get lured by any of their sales pitches....
          Helpful
          4 other people found this review helpful
          4 found this helpful
          Write a comment
          Report
          Copy
          M
          miteshyjain
          from mumbai, Maharashtra
          Apr 13, 2023
          Jul 13, 2023
          This thread was updated on Jul 13, 2023
          Report
          Copy

          Builder not returning the refundable token money

          Address: Ruparel Iris Senapati Bapat Marg, next to Big Bazaar, opp. Matunga road, Sundar Kamla Nagar, Mahim United Industrial Estate, Station HQ

          We went to the pre-launch of the Kandivali Maximum Mumbai Project by Ruparel Builders. Their they forced us to pay 49k as a token amount which is fully refundable amount mentioned in their receipt that they gave, They forced us to swipe our debit cards for the same. Since the project was going to be launched and the actual prices still not revealed, they mentioned it is only to give you a priority in booking when the project will be launched....
          Helpful
          4 other people found this review helpful
          4 found this helpful
          1 Comment
          Report
          Copy
          M
          Mayuresh2808
          from Mumbai, Maharashtra
          Mar 14, 2023
          Aug 10, 2023
          This thread was updated on Aug 10, 2023
          Report
          Copy

          Failure to reimburse pre-EMI amount in subvention scheme

          Address: Ruparel Iris, Hanuman Nagar Mathunga Road, Station Next to Big Bazaar, Opp, Senapati Bapat Marg, Mumbai, Maharashtra 400016
          Website: ruparel.in

          I have been following up with Ruparel team for the past 6 months since which we have not been paid our overdue pre-emi reimbursement. The total amount is close to 3 lakhs now which is a significant amount for a common man.
          I had booked the flat in Pride under sub-vention scheme but Ruparel team have conveniently not included the sub-vention scheme in the contract and hence are using the same fact to delay our hard-earned money by half...
          Helpful
          3 other people found this review helpful
          3 found this helpful
          2 Comments
          Report
          Copy
          S
          sd14
          Jun 1, 2022
          Report
          Copy

          Have booked a flat on April 2019 and registered on June 2019, possession due on December 2021. However an extension email received from Ruparel giving new possession period is December 2022.

          Intermittently I am following up with the Sales and Client Relationship Team members and learnt that still Ruparel hasn't received NOC for the captioned subject, which is surprising. Till date demand payment collected upto plinth, very significant amount of total flat cost.

          In 3rd week of May 2022, visited the site and found that no construction done for Tower 2, A - Wing, Flat number series 1 and 2, Ruparel Optima, Kandivali West Project.

          Sales Team and CRM not telling the reasons for non receipt of NOC and not able advise any particular time for possession.

          I am worried, whether Ruparel would be complete the construction and give possession of the flats to its buyers.

          Kindly share some advise, what to be done now.
          https://youtu.be/0x1KTzPBMqw

          Hi Friends,

          I would like you to please watch the video the video and share as much as possible. I have bought a Jodi flat in Ruparel realty’s Mumbai XL project but the approach of the builder towards their customer is not at all ethical and because of their non transparent calculations and frequent calculation mistake I feel unsafe to go ahead with this transaction. I need your help in sharing this video as much as possible so other people who is looking to book the flat can take informed decision
          Helpful
          7 other people found this review helpful
          7 found this helpful
          1 Comment
          Report
          Copy

          Post your Comment

            I want to submit Complaint Positive Review Neutral Comment
            code
            By clicking Submit you agree to our Terms of Use
            Submit
            M
            MayureshPathak
            Oct 19, 2021
            Report
            Copy

            Address: Matunga West, Mumbai
            Website: ruparel.in

            I am customer of Ruparel Pride, Kurla in which I have booked a flat in the subvention scheme and while booking it was agreed that Ruparel will be reimbursing us the pre-EMI amount in the month prior to the month in which it will be debited.

            During lockdown, Ruparel kept defaulting on the reimbursements regularly for 4-5 months. But even now, they are still defaulting and are not committing to any date of payment.
            We as a customer, have been paying to the bank Bajaj Finance regularly because of automated debit but I feel Ruparel does not feel obliged to stand true on its agreement with their customer.
            Also, they do not respond to emails, calls, messages for months.

            Definitely not recommending Ruparel Realty to anyone.
            Please help.
            https://youtu.be/0x1KTzPBMqw

            Hi Friends,

            I would like you to please watch the video the video and share as much as possible. I have bought a Jodi flat in Ruparel realty’s Mumbai XL project but the approach of the builder towards their customer is not at all ethical and because of their non transparent calculations and frequent calculation mistake I feel unsafe to go ahead with this transaction. I need your help in sharing this video as much as possible so other people who is looking to book the flat can take informed decision
            Helpful
            14 other people found this review helpful
            14 found this helpful
            1 Comment
            Report
            Copy

            Post your Comment

              I want to submit Complaint Positive Review Neutral Comment
              code
              By clicking Submit you agree to our Terms of Use
              Submit
              M
              Mitvin
              Aug 3, 2021
              Report
              Copy

              Address: MumbI

              Hi . I have booked flat in Ruparel as per the subvention scheme . In Scheme it was commited that once you pay back to the ICICI Bank, refund would be received immediately . We would like to inform that the commitment is all false and the refund amount is still pending from them . They are least bothered to reply on email . Kindly take necessary action as i am sure along with me there would be many other customer who would be facing same things .
              Hi I would like to say the same thing.. This is regards to ruparel regalia.. I am not paid from last three months.. Worried about further amount as well..
              Hi Mitvin, I am a Ruparel customer too. And I am facing the same issue. Ruparel has failed to reimburse the pre-EMIs that I have been paying regularly to BHFL.
              Please share your contact number or you can contact me on +91 [protected] to discuss further.
              Helpful
              37 other people found this review helpful
              37 found this helpful
              2 Comments
              Report
              Copy

              Post your Comment

                I want to submit Complaint Positive Review Neutral Comment
                code
                By clicking Submit you agree to our Terms of Use
                Submit
                V
                Vinuvenkat
                Jul 11, 2021
                Report
                Copy

                Address: Ruparel Realty, Tulsi Pipe Road, Matunga West

                Ruparel Realty offered subvention scheme for buying a residential flat in Kandivali and I have made the initial payments. They are in tie up with ICICI Bank and the builder is always defaulting in payments to the loan amount disbursed by the bank, and the bank harrassed me to make the payment, which as per subvention should be paid by the builder. Their recovery agents too are highly rude and insulting. Why offer the buyers subvention when the builder cannot honor the payment and it's words? Did we ask for it? Moreover, I am not allowed to change the bank too, of my choice. ICICI has been thrust upon me even when I did not want to have anything to do with it. I can get home loan at a lower interest from any other bank that I prefer, but no, I am not allowed by the builder. This is sheer mental torture by Ruparel Realty. Would advise never to fall in for their schemes.
                Hi Vinu, I am a Ruparel customer too. And I am facing the same issue. Ruparel has failed to reimburse the pre-EMIs that I have been paying regularly to BHFL.
                Please share your contact number or you can contact me on +91 [protected] to discuss further.
                https://youtu.be/0x1KTzPBMqw

                Hi Friends,

                I would like you to please watch the video the video and share as much as possible. I have bought a Jodi flat in Ruparel realty’s Mumbai XL project but the approach of the builder towards their customer is not at all ethical and because of their non transparent calculations and frequent calculation mistake I feel unsafe to go ahead with this transaction. I need your help in sharing this video as much as possible so other people who is looking to book the flat can take informed decision
                Helpful
                29 other people found this review helpful
                29 found this helpful
                2 Comments
                Report
                Copy

                Post your Comment

                  I want to submit Complaint Positive Review Neutral Comment
                  code
                  By clicking Submit you agree to our Terms of Use
                  Submit
                  R
                  raj_sarfaraz
                  from Powai, Maharashtra
                  Dec 17, 2020
                  Report
                  Copy

                  I purchased a flat under subconvention and during lockdown i paid the EMI
                  Now builder is not paying on time and paid less and now no one is bothered to even pick up or reply to emails.
                  Same is with us
                  Hi Raj, I am a Ruparel customer too. And I am facing the same issue. Ruparel has failed to reimburse the pre-EMIs that I have been paying regularly to BHFL.
                  Please share your contact number or you can contact me on +91 [protected] to discuss further.
                  Can you share contact number so we can create the group
                  https://youtu.be/0x1KTzPBMqw

                  Hi Friends,

                  I would like you to please watch the video the video and share as much as possible. I have bought a Jodi flat in Ruparel realty’s Mumbai XL project but the approach of the builder towards their customer is not at all ethical and because of their non transparent calculations and frequent calculation mistake I feel unsafe to go ahead with this transaction. I need your help in sharing this video as much as possible so other people who is looking to book the flat can take informed decision
                  Helpful
                  3 other people found this review helpful
                  3 found this helpful
                  4 Comments
                  Report
                  Copy

                  Post your Comment

                    I want to submit Complaint Positive Review Neutral Comment
                    code
                    By clicking Submit you agree to our Terms of Use
                    Submit
                    M
                    mjain2
                    from Powai, Maharashtra
                    Dec 15, 2020
                    Report
                    Copy

                    Website: ruparel.in

                    Builder asked for Rs 49, 000 application fee amount by mentioning it is not a token amount and it will be fully refunded in case of cancellation. Then for few months with an excuse of Covid, the builder delayed the refund but kept on promising new dates of when to expect it to be processed. Now the office says management has made a decision to not provide refunds.
                    The builder has also provided written statement that the refund will be processed by july 2020 but now he is not keeping his words.
                    What should be the next steps to obtain refund in this case?
                    https://youtu.be/0x1KTzPBMqw

                    Hi Friends,

                    I would like you to please watch the video the video and share as much as possible. I have bought a Jodi flat in Ruparel realty’s Mumbai XL project but the approach of the builder towards their customer is not at all ethical and because of their non transparent calculations and frequent calculation mistake I feel unsafe to go ahead with this transaction. I need your help in sharing this video as much as possible so other people who is looking to book the flat can take informed decision
                    Helpful
                    10 other people found this review helpful
                    10 found this helpful
                    1 Comment
                    Report
                    Copy

                    Post your Comment

                      I want to submit Complaint Positive Review Neutral Comment
                      code
                      By clicking Submit you agree to our Terms of Use
                      Submit
                      M
                      Manish Dave24
                      Jun 23, 2020
                      Report
                      Copy

                      Address: 504, Divya Gunjan bld, Gaurav Garden Complex, Bunder Phakadi Road, Opposite Ganesh Chowk Bus Stop
                      Website: www.Ruparel.com

                      I have been writing to ruparel office from past 4 months for payment of amount to dhfl builder (Subvention scheme) but i haven't received and concrete answer
                      Now the builder has sent an sms for outstanding balance of ~176000
                      I need help in getting this resolved as this is affecting my bureau and i'm not able to apply for any loans

                      Contact no - [protected]
                      Hi Manish, I am a Ruparel customer too. And I am facing the same issue. Ruparel has failed to reimburse the pre-EMIs that I have been paying regularly to BHFL.
                      Please share your contact number or you can contact me on +91 [protected] to discuss further.
                      Helpful
                      9 other people found this review helpful
                      9 found this helpful
                      1 Comment
                      Report
                      Copy

                      Post your Comment

                        I want to submit Complaint Positive Review Neutral Comment
                        code
                        By clicking Submit you agree to our Terms of Use
                        Submit
                        P
                        Prem parikh
                        from Mumbai, Maharashtra
                        Feb 3, 2019
                        Resolved
                        Report
                        Copy
                        Resolved

                        Address: Mumbai City, Maharashtra, 400067
                        Website: ruparel.in

                        I have been following up since 7 months now and i havent received my commission cheque.
                        Every single month mr. Aniket kasar promises me to give cheque and then delays again.
                        My clients have paid and done their registrations long time back.
                        Means even after ull receiving whatever u needed and so now u dont care whether ur broker is paid what is rightfully his am i correct?
                        Is that so?
                        The company department doesnt have the courtesy also to call and update about the status.
                        Pathetic management

                        And the reason which i have been hearing since 7 months is due to management audit or management has not signed the cheque.
                        Are your management soooooooo busy.
                        If they are soooooo busy i guess ull need to hire more management authorities.

                        I have all the phone recordings and also mails as proof.

                        Anybody reading from ruparel and want to see or solve this matter please feel free to contact me.

                        Prem parikh
                        Jul 10, 2019
                        Complaint marked as Resolved 
                        Issue solved
                        Helpful
                        16 other people found this review helpful
                        16 found this helpful
                        Write a comment
                        Report
                        Copy

                        Post your Comment

                          I want to submit Complaint Positive Review Neutral Comment
                          code
                          By clicking Submit you agree to our Terms of Use
                          Submit
                          N
                          Nams.Lad
                          from Mumbai, Maharashtra
                          Jun 5, 2018
                          Report
                          Copy

                          ruparel optima

                          Ruparel realty is fraud builder and cheating us since last 6 months by give cheque against cancellation of flat booking of ruparel optima. Every time ms. Gitanjali and staff specially aniket kasar is giving false information and cheating us by giving cheque to us. Their behaviour with customer is very bad. I would request you not to invest money with ruparel realty as they are really cheaters....
                          Helpful
                          14 other people found this review helpful
                          14 found this helpful
                          8 Comments
                          Report
                          Copy
                          A
                          Ajay Pardeshi
                          from Delhi, Delhi
                          Dec 1, 2017
                          Report
                          Copy

                          Address: Mumbai City, Maharashtra, 400070
                          Website: ruparel.in/home.html

                          Dear team,

                          We as 5 people (Ajay pardeshi, narayan, anil dixit, s nikam & amol kadam) booked the flat in ruparel solitire project at kurla east on 25th august 2016 for 1 bhk flats. As per the terms we paid 20% amount individually to the parent company of ruparel realty named as shree siddhivinayak classic construction pvt. Ltd. Since the project work supposed to start after diwali we waited. Then we started taking follow ups from ruparel team & they said due to rera registration / permission it is getting delayed. The project work will start from april 2017.
                          Again after april we call to take the updates from ruparel designated people & the agency square yard who was involved in this deal. Both of them assured it will start in the month june/ july 2017.
                          After few days we received the letter from the ruparel that they are not going ahead with the project/ it will delay further so the people who wanted to withdraw, they can do so. Immediately we met the crm head of ruparel gitanjali for the updates.in the letter they mentioned that the amount paid by you will be paid in 12 installments with the interest rate of 8.99%. We immediately ran to the ruparels office & she took us to the managing director of the company mr. Amit ruparel. During the conversation with him he again informed us that the project they will start after diwali i. E. October 2017 & accordingly we will get an invitation letter regarding the same. As we all wanted for our use not as investment we again decided to wait for 1 more month. During that period ruparel withdraw all the boards from the site, also they removed the name of the project from the website of the company. We tried contacting them again after 1 month & then decided to meet / close the matter. We again met mr. Amit ruparel & told them that we are comfortable to wait further & want to withdraw it as final decision. As per the meeting we have drafted the minutes & shared with crm head / other staff of ruparel to refund the money in 3 installments with the interest rate of 18%. The cheques should be provided to us of 30th november 2017, 30th december 2017 & 30th january 2018.

                          Now since last 20 days after the meeting we are taking follow ups with mr. Amit ruparel & crm head gitanjali but no one is responding it.
                          Helpful
                          17 other people found this review helpful
                          17 found this helpful
                          Write a comment
                          Report
                          Copy

                          Post your Comment

                            I want to submit Complaint Positive Review Neutral Comment
                            code
                            By clicking Submit you agree to our Terms of Use
                            Submit
                            G
                            gvaras
                            from Mumbai, Maharashtra
                            May 20, 2017
                            Report
                            Copy

                            Non refund of token booking advance of rs.51000

                            Address: Mumbai City, Maharashtra, 400013

                            I and my sister in law have made booking in Ruparel Reality Optima project at Kandivali West in last week of April. There was big mela at the site booking office when we went for booking. While booking flats we were given bare minimum information on project in view of chaotic rush of public. Only one page minimum information was provided while booking that to more about payment terms. The most crucial fact about this project being SRA project...
                            Helpful
                            13 other people found this review helpful
                            13 found this helpful
                            9 Comments
                            Report
                            Copy
                            R
                            realestatefaiz
                            from Mumbai, Maharashtra
                            Nov 15, 2016
                            Report
                            Copy

                            Builder is not giving complete refund and deducting token amount

                            Address: Mumbai City, Maharashtra, 400016
                            Website: www.ruparel.in

                            We want complete refund from Ruparel Realty Sky Greens project as we do not wish to go ahead with this project due to financial crisis.
                            I have one of the mails which is sent to Ruparel CRM Ms.Gitanjali Sharma after recieving her mail that they will deduct the token amount which is 5lakhs and we have paid them 20% of the agreement value with service tax additional.
                            a mail from geetanjali sharma
                            Dear Faizan,
                            br...
                            Helpful
                            14 other people found this review helpful
                            14 found this helpful
                            11 Comments
                            Report
                            Copy

                            Ruparel Realty Recent Comments