Respected Sir,
I respectfully draw your kind attention that I am residing at A- 82 (Second Floor) Kewal Park Extension, Delhi-110033. My water meter connection No. is 70773-K, KNO [protected] and my reading is currently running at 527 dated 07/11/2014.
As per the current water consumption bill send by your department is Rs.8478/- bill no.[protected] dated 06/11/2014 reading from 783-1043 in my name which used by Smt. Prabhawati Gupta A-82 (First Floor, Kewal Park Extension) and this meter is currently running at 1085. 783-1043 is showing in the meter connected with Smt. Prabhawati Gupta A-82 (First Floor, Kewal Park Extension).
I would like to draw your kind attention that my meter No. is 70773- K, KNO. [protected] currently my meter is running at 527 dated 07/11/2014 which is using by me and my consumption bill is not send by you. Latest consumption bill send by your department is Rs.8478/- bill no. [protected] dated 06/11/2014 reading from 783-1043 is not showing in my meter and connection.
I have shifted at A- 82 (Second Floor) Kewal Park Extension, Delhi-110033 in July 2014 and I received bill No.[protected] dated 20th June, 2014 amount of Rs. 2713/- which was paid by me was also wrong meter reading i.e 739-783. This meter reading was not matching with my meter connection and meter reading at the same time.
Last bill send by you bill No.[protected] dated 24/07/2014 amount Rs. 1954/- was also wrong meter reading and not as per my meter connection reading. Kindly check the meter reading on the spot and send the correct consumption bill. In this bill I have requested for mutation in my name in place of Smt. Prabhawati W/O Sh Ganga Prasad A- 82 (Second Floor) Kewal Park Extension, Delhi-110033 in July 2014. In Mutation bill the reading was also wrong send by DJB. This bill was not as per my meter reading and connection.
-2-
I would humbly draw your kind attention that the meter reading noted in my connection is not matching with my meter connection No. 70773-K, KNO [protected]. All the bills send by you is not matching with my meter connection and in my bill reading is noted from another meter used by Smt. Prabhaw Gupta
A-82 (First Floor, Kewal Park Extension). All the previous meter reading consumption was sent to me was consumed by Smt. Prabhawati Gupta A-82 (First Floor, Kewal Park Extension).
You are continuously sending the reading in my bill in meter connected with A-82 (First Floor, Kewal Park Extension) meter connection. The previous all bill was also wrong. We are giving the detail below:-
Bill No. Dated. Meter Reading
From-To Amunt (Rs)
[protected] 20.06.2014 739-783 2713.00 This meter connected
[protected] 24.07.2014 783-NS 1954.00 with A-82 (First Floor)
[protected] 06.11.2014 783-1043 8478.00 Kewal Park Extension.
You are requested that kindly check the meter connection and meter reading and correct all the previous wrong meter bill send to us as per my connection and returned my hard earned my to me.
Thanking you.
Yours faithfully
(Rajesh Gupta)
A-82 (Second Floor)
Kewal Park Extension
Delhi-110033
Mobile-[protected]
Encl-Bill No.[protected],[protected] and 34721
Aug 14, 2020
Complaint marked as Resolved
Nagar, my address is D -36A Block-D Street No 4 Mohan Garden, Uttam Nagar new Delhi
59, we have taken water meter connection old K No [protected] and new K No is [protected].
We and our D block suffering from water problem since last 3 years till now and
WE HAVE NOT RECEIVED THE BILL FROM LAST THREE YAERS after asking many time to
bill delivery person he say “NO WATER NO BILL” AND TILL DATE WE HAVE NOT RECEIVED
THE BILL. Then I go to Paschim Vihar Jal
board billing office for asking the matter and bill. The irritated billing
person calculate the excess bill amount for 230 units in last 40 days is Rs 10754/-
But the total units consume in last many years.
I request to you please kindly raised a new bill on actual regularly used reading basis for
total 230 KL units in 2.5 years. Thanks
& Regards Mr. Satish kumar [protected]
mail id: [protected]@gmail.com