| Address: Ghaziabad, Uttar Pradesh, 201010 |
Ref. To complain no. 26962 dt. 23.03.2018 and, i have the honour to draw your kind attention for your justified action at an early date.
1. The damaged walls and balconies are to be painted and complet before dewali, as agreed by the builder"s represantative in presence of the jr. Engg. Gda.
2. The outer wall, above my rooftop is extended (1"-2") towards my rooftop., which i have shown to the jr. Engg. Gda and the builder"s represntatives. Both of them ensured me that before plastering of the wall, the extended portion would be completly cut out and the plastered wall will be outside my boundary wall. But presently without completing the cutting, they started plastering. The plastered wall is leaning towards my rooftop qutioning safety. I could not have my morning walk on the rooftop due to rubish and cement dust. For more than six momth. So i have no way but to stop plastering from my rooftop.
3. All the construction materials are layinging uncovered since jan.2018, causing environmental pollution and health hazard inspite of repeated request.
4. Ref. To our jon it application of six flates owners, gda has directed the builder to demolish the unauthorised construction, extending to the road,. But it is not done completly.in fornt of representatives of six flates, the jr. Engg. Gda justifed the encrosment, saying that there is encrosment in our buildings also, which have been constructed and passed by gda, 10-15 yrs ago.
That sir, i am a 66 yrs. Old woman, suffering from these troubles, for no fault of mine. During the last construction period of about 10 months we have suffered mental and physical harashment. So your justified intervention is requested at an early date and obliged.
Ghaziabad Development Authority [GDA] customer support has been notified about the posted complaint.
Pls clean Nala fornt F 382 sector 11 pratap vihar. Near police chowki pratap vihar Ghaziabad
Regards
R P jain
Mob [protected]