Jun 23, 2021
Updated by shil25 Regarding Modular Kitchen from Hometown Amanora Pune
Complaint is still OPEN
It's been more than 1.5 Years of modular kitchen booking and still not completed. Very poor service from Hometown Amanora Pune. I will not recommend Hometown to anybody.
Modular Kitchen booking - First week of December, 2019.
Confirmed the design on - 11th Dec, 2019.
Incomplete material delivered and work performed - ONLY two weekends of January 2020.
Today is 23rd June 2021, still getting false promises, no delivery of pending materials and no work at all.
Issues:
1. Only 80% work has been completed that too after many follow ups over phone and shop visits.
2. Instead of Hettich, other company's materials were installed in some parts.
3. Skirting, Tall Unit door, pumps still not installed.
4. Aluminum front panel still not delivered for 6 drawers.
5. Very bad customer service, every time I called Hometown for further work enquiries and got false commitments always.
6. Every time supervisor comes and takes measurements, I don't know why, when measurements are already confirmed on mail in December 2019. Doing time pass or what.
Please be professional and maintain your hometown reputation.
STOP GIVING EXCUSES OF COVID19 LOCKDOWN, WORK IS PENDING SINCE JANUARY 2020 THAT IS MUCH BEFORE LOCKDOWN.
Regards,
Shilpi Shrivastava
Nov 15, 2021
Updated by shil25 It's been now 2 Years of modular kitchen booking and still not completed. Very poor service from Hometown Amanora Pune. I will not recommend Hometown to anybody.
Modular Kitchen booking - First week of December, 2019.
Confirmed the design(high level) on - 11th Dec, 2019.
Today is 15th Nov 2021, still struggling to get work completed.
Background of ongoing issue:
1. During Design discussion, I have asked for Aluminum front panels for 6 drawers of Tall Unit. But Designer took internal approval for some other material.
2. Discussions were going on for drawer front panel, so Hometown's third party vendor built tall unit with - incomplete drawers having no front panels and fitted tall unit shutter. Both at the same day.
3. After 1.5 years, I compromised on front panel material, as Hometown was in rigid position. And I wanted to get work completed as soon as possible.
Issue:
Other material front panel installed. But again problem arises, 1.5 years back when at the same day, Hometown's third party vendor had already fitted tall unit's shutter hinges at wrong places knowing the fact that later on when drawer front panel get installed then drawer need to come out (serving its purpose). Again hinges places are corrected which left 2 holes on shutter.
Person in-charge is asking me to pay for shutter lamination. Saying its not Hometown's responsibility and Vendor will not agree. I mean seriously, its clearly vendor's fault. Why do I suffer again and again because o[censored]nprofessional behavior and now for inexperienced fitter.
Regards,
Shilpi Shrivastava